Download - Khi Solar One (Pty) Ltd - Nersa
![Page 1: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/1.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
1
Khi Solar One (Pty) Ltd
NERSA !Khi Solar One license application – public hearing
Postmasburg, 6 March 2012
!Khi Solar One – 50MW steam tower
![Page 2: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/2.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
2
!Khi
Shepherd’s tree
„Witgatboom”
(Boscia albitrunca)
![Page 3: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/3.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
3
Site details
!Khi Solar One
• Located app 20km SW from the town
of Upington – Kai Garib Municipality,
NC Province (just off the D3276
Lutzputs road).
• Brownfields site.
• 600ha permitted.
• Eskom power line app 4km south of
site
• River 10km south of site
![Page 4: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/4.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
4
Project details
!Khi Solar One• Capacity – 50MW
• Steam storage capacity of 3 hours
• App 4500 heliostats with a collector
surface area of app 580,000m2
• Plant scheduled for operation by end
June 2014
![Page 5: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/5.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
5
Project details
!Khi Solar One
• Total Abengoa Solar commitment across the KaXu and Khi
projects greater than R 10 Billion.
• Ownership: 51% Abengoa, 20% Community Trust, 29% IDC
• Roughly 600 construction jobs over 24 months.
• 35 Permanent employees over 20 year operational phase.
• 100 Additional jobs due to services and supplies from the greater
area.
• Roughly 190GWh annual production.
• 183 000 tons reduction in CO2 emissions.
![Page 6: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/6.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
6
How it works
!Khi Solar One
Steam Storage
Steam Turbine
GGas-Heater
Receiver
Heliostats
Solar Tower
Generator50.0 MWe
![Page 7: Khi Solar One (Pty) Ltd - Nersa](https://reader031.vdocuments.net/reader031/viewer/2022021006/62038ddeda24ad121e4ac3be/html5/thumbnails/7.jpg)
Copyright © Abengoa Solar, S.A. 2011. All rights reserved
7
Thank you