8/3/2019 Kirtling_St display board

http://slidepdf.com/reader/full/kirtlingst-display-board 1/1

www.thamestunnelconsultation.co.uk

Kirtling Street

 

New CoventGarden Market

Royal MailSorting Office

Kirtling Street Nine Elms Pier

Battersea PowerStation

  B a t t e

 r s e a   P

 a r  k   R o

 a d

C r i n g l e  S t r e e t   N  i  n e

  E  l  m  s  L

 a  n e

N

CITY OF WESTMINSTER

WANDSWORTH

Local authority boundary

Draft limit of land tobe acquired or used

Proposed tunnelroute – centreline

Heathwall PumpingStation site

Location plan

 

Jack up bargeservicing pilingoperations

Cranes

Piling rig

Conveyor

Shaft

N

Maximum extent of construction site forphases 1 and 2

Site hoarding

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Construction support

Internal site road

Site access

Existing Thames Path

Thames Path diversion

 

Aerial view of the completed works

Phases one and two construction plan

 

Shaft

Barges

Gantry crane

N

Maximum extent of construction site forphase 3

Site hoarding

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Construction support

Internal site road

Site access

Existing Thames Path

Thames Path diversion

Noise enclosure overshaft and gantry crane

Crane

Conveyor

 

N

Shaft

Gantry crane

Conveyor

Maximum extent of construction site forphases 4 and 5

Site hoarding

Site support/welfare

Excavated materialstorage and processing

Maintenance workshopand storage

Construction support

Internal site road

Site access

Existing Thames Path

Thames Path diversion

Noise enclosure overshaft and gantry crane

 

Permanentaccess for

maintenance

Combinedventilation

structure andequipment kiosk

SafeguardedWharf jetty

retained

Temporaryhoardingaround site fordevelopmentby others

‘Riverlight’development

Nine Elms pier

Kirtling Streetresurfaced

Thames Pathwayfinding

signage

Kirtling Street

C r i n g l e  S t r e e t 

    N   i   n

  e    E    l   m

  s    L  a   n

  e

N

New fence toboundary of concrete

batching works site

Layout of the site once construction works complete

Phase three construction plan

Phases four and ve construction plan