L.A. Lopez Hernandez
Route Goward and Septum 16 shielding increase
LS1 Committee - 21st - 20 September 2013
![Page 2: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/2.jpg)
• The shieIding increase of the PS over Route Goward passage and over Straight Section 16 was proposed by RP, recommended by the PSRWG, presented at the IEFC and endorsed by the management
• The cost of the intervention has been included in the PS‐LIU budget
![Page 3: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/3.jpg)
RP presentation from 59th IEFC (S. Damjanovic)
The extra-concrete shielding requiredfollowing HSE recommendationswas ~ + 180 cms.
Route Goward
![Page 4: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/4.jpg)
Proposed solution: Concrete slab 2 m thick
Piling wall protecting the tunnel from the load of the road
![Page 5: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/5.jpg)
Works carried out:
-Earthworks -Temporary road to give limited access to the center of the ring during the construction works -Piles -Concrete slab 2 m thick -New road ~ 100 m long, including retaining walls, backfilling, modification of the existing networks, etc
Schedule:
Currently: -Road open -Works finished on schedule
![Page 6: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/6.jpg)
Temporary road
Retaining wallPiling works
Some pictures of the works:
![Page 7: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/7.jpg)
Slab reinforcement
Formwork for the slab
Biocofra
![Page 8: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/8.jpg)
Concreting
Road works
Backfilling
![Page 9: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/9.jpg)
RP presentation from 61st IEFC (S. Damjanovic)
The extra-concrete shielding requiredfollowing HSE recommendationshas been converted in earth shieldingNew max ground level: 442.6 m (means between +1.2 and +3.4 m over the existing level)
Straight Section 16
![Page 10: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/10.jpg)
Requested: - Additionnal depth of earth of between 1.2m and 3.4m depending of the area
Constraints: - Existing structures not strong enough to take the additional load- Area with a very complex geometry (PS, Linac 2&3, Leir, TT2, . .) - Works must have no influence or impact on the existing structures
![Page 11: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/11.jpg)
Feasibility studies:
![Page 12: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/12.jpg)
Proposed solution : -A new load-bearing structure taking the weight of the additional earth and redirecting it into the bedrock underneath.
-The structure consists of a 1.10 m thick reinforced concrete slab and the additional depth of backfill will be placed directly on the slab.
-The slab rests on drilled piles, or secant piles in areas subject to particularly heavy loads
-In the places where the existing tunnels are made of large masses of concrete, the slab rests on intermittent supports on the tunnel roof
![Page 13: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/13.jpg)
Bird’s eye view of the new slab:
![Page 14: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/14.jpg)
- To protect the existing structures, the transfer slab must guarantee that even after long-term deformation the load-bearing relief structure does not under any circumstances come to rest on the existing structures.
- To this end, the slab will rest on a biodegradable honeycomb cardboard formwork that can be dissolved with water. This procedure guarantees that, once water has been injected to dissolve the cardboard, a void of 10 cm remains after concreting, which is more than enough to allow for the long-term deformation of the slab
![Page 15: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/15.jpg)
Biocofra:
![Page 16: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/16.jpg)
Slab deformation:
51 mm
56 mm
![Page 17: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/17.jpg)
Schedule
Currently: -Piles finished-Concreting works starting
![Page 18: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/18.jpg)
Worksite installations:
Parking route Gowardshared with CV
Concrete batching plant
Temporary spoil dump
Access to building 561 (RP)
«Passage pieton» closed
![Page 19: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/19.jpg)
L.A. Lopez Hernandez 19
Monitoring of the existing structures -Photographic survey of the structures
-Camera inspection of the drains ~ 300m
-Vibration measurements during piling works
LS1 Committee - 21st
- Maximum particle velocity for historical buildings < 2 mm / s
- Max value recorded: 1.19 mm/s on sensor 2
- 3D modeling of the (shielding + existing structures +ground) for prediction of displacements
![Page 20: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/20.jpg)
Some pictures of the works:
![Page 21: L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013](https://reader030.vdocuments.net/reader030/viewer/2022032701/56649c895503460f94941d42/html5/thumbnails/21.jpg)
Thank you for your attention