Transcript
Page 1: Lakewood High School Renovations

Robert P. Madison, International

Community Meeting #2 October 7, 2014

Lakewood High School Renovation and Additions

Page 2: Lakewood High School Renovations

Robert P. Madison, International

Program of Requirements

Academics* Classrooms (22 new) Science Room (1 new )

Special Education* Self-Contained Classrooms (7 new)

Music Band / Orchestra Room Vocal Room Piano Lab

Drama/TV Production Black Box Theater – can be shared with Music

New Media Center Includes Alumni Offices Large Reading Room Media Production Areas Computer Storage Areas *(Currently 30 classrooms in Modulars on Franklin)

Page 3: Lakewood High School Renovations

Robert P. Madison, International

Program of Requirements

Dining Hall Student Dining – including “L” Room

Physical Education 3 Cross Courts or 1 Competition Gym Fitness /Weight Room Wrestling Room Team and PE Locker Rooms Athletic Offices and Training Room Concessions Area Ranger Shop Optional Elevated Track for Recreational Use

Administration Relocated Main Office Relocated House Principals’ Offices Relocated Guidance Center

Student Activity Rooms Collaboration Spaces H2O

Student Health Center

Page 4: Lakewood High School Renovations

Robert P. Madison, International

Project Budget

Existing Building Demolish 264,790

Remain 268,850

New 149,000 Total 417,850

Project Budget

Construction Cost: $45,949,887

Page 5: Lakewood High School Renovations

Robert P. Madison, International

Project Schedule 2014-2017

Construction Packages Construction Start Completion 1.) Swing Space Transition Package September 2014 January 2015 2.) Existing Building Demo & Abatement Package December 2014 Spring 2015 3.) Early Site & Foundation Package Spring 2015 October 2015 4.) Academic & East Wing Building Package Spring 2015 June 2017 5.) Civic Auditorium & Natatorium MEP Summers of 2015, June 2017 2016 & 2017

Page 6: Lakewood High School Renovations

Robert P. Madison, International

TRANSITION PACKAGE: TEMPORARY CAFETERIA &

WARMING KITCHEN STORAGE & EGRESS

Page 7: Lakewood High School Renovations

Robert P. Madison, International

Transition Package ‘A’ Building

Page 8: Lakewood High School Renovations

Robert P. Madison, International

NEW CONSTRUCTION & RENOVATION – A & B ACADEMIC

WING

Page 9: Lakewood High School Renovations

Robert P. Madison, International

Existing School Renovations

First Level Floor Plan

Page 10: Lakewood High School Renovations

Robert P. Madison, International

Existing School Renovations

Second Level Floor Plan

Page 11: Lakewood High School Renovations

Robert P. Madison, International

Existing School Renovations

Third Level Floor Plan

Page 12: Lakewood High School Renovations

Robert P. Madison, International

LIFE SAFETY & MEP RENOVATIONS – CIVIC AUDITORIUM

Page 13: Lakewood High School Renovations

Robert P. Madison, International

Access to Workroom and Changing Rooms Civic Basement

NEW CORRIDOR ACCESS NEW CORRIDOR ACCESS

NEW RAMP UP

NEW RAMP UP

NEW ELEVATOR

Page 14: Lakewood High School Renovations

Robert P. Madison, International

NEW CONSTRUCTION & RENOVATION

Page 15: Lakewood High School Renovations

Robert P. Madison, International

South - Site Plan

Page 16: Lakewood High School Renovations

Robert P. Madison, International

North - Site Plan

Page 17: Lakewood High School Renovations

Robert P. Madison, International

New Construction & Renovation South Addition Academic Wing

Page 18: Lakewood High School Renovations

Robert P. Madison, International

Academic South Wing Addition / House Principal / Special Education

First Level Floor Plan

POTENTIAL TWO

CLASSROOM ADDITION

MOVEABLE WALL

Page 19: Lakewood High School Renovations

Robert P. Madison, International

Academic South Wing Addition Second Level Floor Plan

POTENTIAL TWO

CLASSROOM ADDITION

MOVEABLE WALL

Page 20: Lakewood High School Renovations

Robert P. Madison, International

Academic South Wing Addition – Academic Core / Science

Third Level Floor Plan

POTENTIAL TWO

CLASSROOM ADDITION

MOVEABLE WALL

SCIENCE CLASSROOM & LAB

Page 21: Lakewood High School Renovations

Robert P. Madison, International

Site Section Looking West Academic South Wing Addition

EX

IS

TIN

G R

ES

ID

EN

TIA

L

ALO

NG

R

OB

IN

WO

OD

A

VE

LEVEL 3

LEVEL 2

LEVEL 1

EX

IS

TIN

G H

S

PR

OP

OS

ED

AC

CE

SS

D

RIV

E

42’ 14’

CLA

SS

RO

OM

EX

PA

NS

IO

N A

RE

A

208

PR

OP

ER

TY

LIN

E

Page 22: Lakewood High School Renovations

Robert P. Madison, International

South Addition View from east side of Robinwood Avenue

Page 23: Lakewood High School Renovations

Robert P. Madison, International

South Site Plan

Page 24: Lakewood High School Renovations

Robert P. Madison, International

New Construction East Addition – ‘L’ Room / Dining / Music /

Theater / Physical Education

Page 25: Lakewood High School Renovations

Robert P. Madison, International

East Addition – ‘L’ Room / Dining / Music / Theater / Physical Education

First Level Floor Plan

Page 26: Lakewood High School Renovations

Robert P. Madison, International

East Addition – Media / Alumni Foundation / Alternate Track / House Principal

Second Level Floor Plan

BID ALTERNATE: UPPER LEVEL WALKING TRACK

Page 27: Lakewood High School Renovations

Robert P. Madison, International

‘L’ Room – Dining & Media Spaces East Addition

Page 28: Lakewood High School Renovations

Robert P. Madison, International

‘L’ Room – Dining & Media Spaces East Addition

Page 29: Lakewood High School Renovations

Robert P. Madison, International

View from Bunts & Franklin East Addition

Page 30: Lakewood High School Renovations

Robert P. Madison, International

View of Student Dining and Gymnasium East Addition

Page 31: Lakewood High School Renovations

Robert P. Madison, International

MAIN OFFICE & HEALTH CENTER ENTRY CAREER TECH ENTRY CIVIC AUDITORIUM ENTRY RANGER SHOP & DINING ROOM / PRE-FUNCTION SPACE ENTRY

“Front Doors High School Entry

Page 32: Lakewood High School Renovations

Robert P. Madison, International

CONSTRUCTION PHASING

Page 33: Lakewood High School Renovations

Robert P. Madison, International

During Construction Site Plan

Page 34: Lakewood High School Renovations

Robert P. Madison, International

Construction Staging Plan Turner / Regency / AKA (Construction Manager)

Pot ent ial