Download - LAYOUT POWER CONVERTER IN UL55
Transcript
LAYOUT POWER CONVERTERIN UL55
THERE ISN’T ENOUGH SPACE TO PUT ONLY THE VOLUME OF POWER CONVERTER RACKS !!!!
AND WHAT IS MISSING?• OTHERS EQUIPMENTS : RACKS, SERVICES,CABLES
TRAYS, COOLING VENTILATION,…• CONSTRAINTS OF MAINTENANCE OF RACKS (NEED
SPACE AROUND P.C. RACKS NOT TAKEN INTO ACCOUNT)
• R2E REQUEST• DES/INSTALLATION OLD/NEW INNER TRIPLET &
EQUIPMENTS.