LER thermal outgassing is back again with us

• Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044, VGCC3027

• Happened one day before the last LER current step (2400 mA on May 13)

• Due to HER current increased from 1.3A to 1.4A• As in March, change associated with pressure

AND sensitivity variations in these pumps• Seen also in DCH and DRC

Page 2: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

One month history of LER and Diamond East

LER

East Diam

April 17

May 18

May 12

Page 3: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Extra heating due to HER increase (thanks to Witold for pinting this out!)

HER increased from 1.3 to 1.4 A

From 3 pm onwards

Page 4: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Pressure variations in VP3044 and VGCC3027

VP3044 VGCC3027

VP3075VP3147

Page 5: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Detailed history of May 12

LER

VP3044

VGCC3027

East Diam

Time in hours

0 12 24

Page 6: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Detailed history of May 13

LER

VP3044

VGCC3027

East Diamond

Page 7: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Also affects DCH and DRC(not corrected for HER increase)

DCH DIRC 0

600

1000+20 %

+20%

One month History April 17_May 18 One month History April 17_May 18

Page 8: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

It is also thermal outgassing in DCH and DRC

DCH DRC 0

Time in hours Time in hours

Page 9: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

More evidence that DCJ is outgassing

and NOT neutronsLER/HER/LUMI

DCH

Neutrons

Diam East

May 18

7 pm to 11 pm

Page 10: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Summary of May 12-13 for DIAM E

All variables normalized to 1 on MAY 18 0 am

Time in hours

DIAME

LER

VP3044

VGCC3027

HER

Page 11: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Summary for May 12-May 21

DIAMELERVP3044VGCC3027HER

Page 12: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Summary of May 12-13 for DRC and DCH

All variables normalized to 1 on MAY 18 0 am

Time in hours

LER

VP3044

DRC0

DCH

HER

Page 13: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Diamond East is perfectly described with two pumps vP3044

and VGCC3027

May 11 6 pm to Midnight

Diam E

VGCC3027

VP3044

14

Page 14: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

After the start of outgassing

May 13, 8 pm to Midnight

14

25

Almost doubling of DIAME

Page 15: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Still true later on

May 17

3am to Midnight

Page 16: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

The coefficients, normalised to 1 on May 10

VP3044VGCC3027

VP3075 VP3147

Days in May Days in May

Page 17: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Evolution of pressures and DIAM-E sensitivity coefficients

Sensor Pressure change

Coefficient

change

Total change

VP3044 X 1 X2.5 X2.5

VGCC3027 X3.5 X0.6 X2.1

DiamE x1.65

Page 18: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Conclusion

• Significant increase (x1.65) of DIAME since May 12 due to thermal outagassing in VP3044 and VGCC3027

• Caused by the HER current increase from 1.3A to 1.4A• Affects also DCH and DRC• Pressure AND sensitivity variation in both pumps

– VP3044 sensitivity x 2.5– VGCC3027 reduced by a factor 2 !– Evidence of VP3044 pressure reduction with time

• Will be interesting to correlate with the many new temperature sensors

Page 19: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Pressure spike on May 22

Page 20: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,
Page 21: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

Pressure spike on May 23

Page 22: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,
Page 23: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,
Page 24: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

BABAR dead time driver

Page 25: LER thermal outgassing is back again with us Significant increase in East Diamond signal since May 12, ~3 pm due to thermal outgassing in two pumps VP3044,

East Diamondrecent week


Top Related