Download - LIFTING OUR GAME - Open Spatial
LIFTING OUR GAME
OPEN SPATIAL USER FORUM
2016
OBJECTIVES
For WAF to know the quantity of our assets on the ground and keep it
in record and be used for all purposesGIS
1 Leak Detection & Services Pipes Replacement Unit
2 Water Modelling - Simulation
3 Integrated Meter Management & Customer Services
4 Pressure Management & Data Loggers
5 Operations & Construction
6 Customer’s Awareness and Notification
NRW & GIS Process Plan
Integrated Meter
Management
• Bulk MM
• Meter Replacement
• AMR
• AMI
• Relocation
• New Connection
Service Pipe Replacement
• Replace service
connection
GIS
• Capture/ Collect
• Verify
• Data Storage
• Analysis
• Visualization
NRW&
GIS
PSIP/Project
Internal Audit
SPU/Corporate
Stakeholders Planning & Design
DMA
Supervisors
Customer
Services
LDU
Objective: Leak free
• Verification
• Walk the Line
• Step Test
• Sounding
• Valve operation/Repair
• Flow measurement – Data
Logger
• Pressure Test – Data Logger
Project Implementation
• PRV
• DMA MM
Modelling
Planning & Analysis
• NRW calculations
• Training and Development
[Internal &External
GIS
Verification
Coverage
Description North Region Central Eastern
Region
Western Region Total
Res 24/31 – 77.42% 28/34 – 82.35% 60/60 – 100% 112/125 – 89.60%
Meter 15389/15391 – 99% 78089/78513 – 99.46%57821/58125 –
99.48%
151299/152029 -
99.52%
WTP 17/17 – 100% 9/9 – 100% 12/12 – 100% 38/38 – 100%
Pipes (km)432.43/628.80 –
68.77%
1347.82/1358.02 –
99.25%1798.52 – 100%
3578.77/3785.33 –
94.54%
2015 ARCHIVEMENTS
NETWORK TRACEPART TRACEFULL TRACESYSTEM TRACE
FUTURE DEVELOPMENT
1. ACDC
2. DATA LOGGER – MNF CALCULATIONS
3. SMS TEXT NOTIFICATIONS
4. NRW CALCULATION – DMA
5. PROJECT MANAGEMENT DATA VISUALIZATION
5th Mar 7th Mar 8th Mar 9th Mar 10th Mar 11th Mar 12-Mar 14-Mar 16-Mar 18-Mar 21-Mar 23-Mar 30-Mar 4-Apr
Restored 241 365 370 392 424 426 441 456 474 474 502 519 531 532
WIP 145 83 83 64 81 79 77 73 55 57 29 12 1 0
Yet to be Visited 146 84 79 76 27 27 14 3 3 1 1 1 0 0
0
100
200
300
400
500
600
WAF Rural Restortion Work Summary
Restored WIP Yet to be Visited
Summary – Types of Work Carried Out (Rural Areas)
No Description Central Eastern Northern Western Total
1 # km of pipes repaired 3 0.5 1.5 2.96 7.96
2 # no. of blocked intakes cleared 217 12 18 67 314
3 # no. of tanks repaired. 30 12 4 6 52
4 # no. of standpipes repaired 100 66 33 129 328
5 # no. of roof catchments repaired - - 1 - 1
6 # Others (Aerial/Washout Repair) - - 4 68 72
Central Eastern Northern Western Total
10 15 4.5 2.96 32.46
217 12 20 67 316
30 12 4 6 52
100 66 60 129 355
- - 6 - 6
5 5 20 68 98
DESALINATION PLANT
Naituvatuvavatu Village Nabouva Village
Navolau No: 1 village dam outlet damaged and repaired.
Before Repair.
After Repair.
Nayaulevu village – Overhead Crossing Nasau village. – Temporary Line
Veidrala Village – Temporary Line
09/03/2016
WAF Restoration
Team
Development
1. Installation of Enlighten 3.3 on
WAF Test Server (GIS)
1. Working intuitively on all form
factors including desktops,
tablets and smart phones,
2. support for GPS devices has
been included extending the
benefits of the enlighten
business intelligence portal from
the desktop to any form factor
for users on-location.
TRANSITIONS