Photo
on M/V Blue Marlin
-
7/31/2019 Loadign/cargando ALHD Canberra
2/28
Agenda
. omest c rrangements
.
3. Dockwise Short Introduction
4. Dockwise Navantia ALHD project
5. Dockwise Float on operations
6. Follow on actions
2
-
7/31/2019 Loadign/cargando ALHD Canberra
3/28
1. Instructions in Case of Emer enc
Domestic Arrangements
Evacuation
Other Emer encies
Breaks
Tele hones
Introductions
Photo Photo
3
-
7/31/2019 Loadign/cargando ALHD Canberra
4/28
-
7/31/2019 Loadign/cargando ALHD Canberra
5/28
. Dockwise operates a fleet of 18 semi-
su mers e eavy transport vesse s.Heavy Marine Transport
Transport & Installation
Logistical Management
Yacht Transport
World-Wide Offices:Breda The Netherlands
Houston USA
Fort Lauderdale - USA
Shanghai China
Sin a ore
Perth Australia
Moscow Russia
Rio de Janeiro - Brasil5
-
7/31/2019 Loadign/cargando ALHD Canberra
6/28
.
6
-
7/31/2019 Loadign/cargando ALHD Canberra
7/28
Open deck ships
7
-
7/31/2019 Loadign/cargando ALHD Canberra
8/28
Dock-type ships
8
-
7/31/2019 Loadign/cargando ALHD Canberra
9/28
. oc w se or n ro uc on
9
-
7/31/2019 Loadign/cargando ALHD Canberra
10/28
Blue Marlin
Length overall 224.50 m
Open-deck vessel
Breadth 63.00 m
Depth 13.30 m
Draft sailing 10.08 mra su merge . m
Gross tonnage 51,821 t
Deadweight 76,061 t
.
Deck load 27.5 t/sq.m
Service s eed 12 kn
Maximum speed 13.3 kn
Range 65 days
10
-
7/31/2019 Loadign/cargando ALHD Canberra
11/28
. oc w se - avan a ro ec
Contracts si ned Jul 2008
Risk Mitigation by ongoing State of the Art Engineering.
Sea state
Structural Integrity
Float on Float off method
.
Transport ALHD Adelaide January 2014 March 2014.
11
-
7/31/2019 Loadign/cargando ALHD Canberra
12/28
. oc w se - avan a ro ec
12
-
7/31/2019 Loadign/cargando ALHD Canberra
13/28
oa ng oca on: a oru a un a angos e ra
Bullet text number one
Bullet text number two
Photo
Bullet text number four
Bullet text number five
Bullet text number six
Photo Photo
min. water de th in dee hole : 23 m from LATmin. length deep hole : 250 mmin. width deep hole : 75 m
13
-
7/31/2019 Loadign/cargando ALHD Canberra
14/28
Loading operation : Blue Marlin along quayside
Preparation of Blue Marlins deck:
Cribbing installed on deck
Guideposts installed on deck Photoar o ow suppor rame pre
-installed on deck, heightdepending on required static
support after loading
(Rest of) bow support frame
temporarily stowed on deck,well away from ALHDloading/stowage area
Sea fastening equipment laidout on Blue Marlins deck
Duration: 2 to 3 days
Photo Photo
14
-
7/31/2019 Loadign/cargando ALHD Canberra
15/28
Photo
Photo Photo
15
-
7/31/2019 Loadign/cargando ALHD Canberra
16/28
Photo
Photo Photo
16
-
7/31/2019 Loadign/cargando ALHD Canberra
17/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo
Photo Photo
17
-
7/31/2019 Loadign/cargando ALHD Canberra
18/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo
Go/No go meeting held with
Navantia, Harbour master,,
Dockwise
Communications tested. Allaware of responsibilities.
eat er sea state w n ow
agreed to be within limits fornext 48 hours
Around midnight Blue Marlin to
Photo Photostart submerging
Daybreak ALHD brought
towards Blue Marlin with
assistance of tu s
18
-
7/31/2019 Loadign/cargando ALHD Canberra
19/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo
ALHD brought close to the stern
of the Blue Marlin with
Vessels first tugger-wiresconnected to ALHD. DockwiseSuperintendent from now in
.
ALHD brought towards BlueMarlin with assistance of tugs
More tugger-wires (aft)
Photo Photoconnected to ALHD
Forward tug dismissed
19
-
7/31/2019 Loadign/cargando ALHD Canberra
20/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo
ALHD brought over Blue
Marlins deck by means of-
Tugs forward stand-by forassistance
Photo Photo
20
-
7/31/2019 Loadign/cargando ALHD Canberra
21/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo ALHD brought over Blue
Marlins deck by means of-
Cross wires connected withhelp of the vessels workboat
Tugs forward stand-by forass stance
Photo Photo
21
-
7/31/2019 Loadign/cargando ALHD Canberra
22/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo ALHD brought over Blue
Marlins deck by means of-
Tugs forward stand-by forassistance
Photo Photo
22
-
7/31/2019 Loadign/cargando ALHD Canberra
23/28
Loading operation : Blue Marlin submerged to 22 m draft
Photo ALHD in position above
Blue Marlins deck -
assistance
Photo Photo
23
-
7/31/2019 Loadign/cargando ALHD Canberra
24/28
Loading operation : Blue Marlin de-ballasting
Tugs dismissed
ALHD on cribbing / support
Photo
Photo Photo
24
-
7/31/2019 Loadign/cargando ALHD Canberra
25/28
Loading operation : Blue Marlin at sailing draft
Photo ALHD on cribbing / support
on Blue Marlins deck
afternoon,
Late evening - sailing draft
reached
Prepare for seafastening
Prepare to go alongside
Photo Photo
25
-
7/31/2019 Loadign/cargando ALHD Canberra
26/28
Typical examples of sea fastening with bracings to be installed
Photo
Photo Photo
26
-
7/31/2019 Loadign/cargando ALHD Canberra
27/28
Seafastening operation : Blue Marlin along the quay
Installation work for sea
fastening to startPhoto
approval
Customs clearance of ALHD
cleared (Navantia)
Port Authorities: Health,
customs and immigrationcleared (Dockwise)
Departure
Daily reporting via Dockwise
Head Office to all relevant
Photo Photo
.
27
-
7/31/2019 Loadign/cargando ALHD Canberra
28/28
6. Follow up actions:
Assistance Shipping Agent
In- and outward clearances
Photo
Assistance La Coruna Port Authorities
Availability of the quay
Availability of the anchor position
Port security
Notices to Mariners
Assistance Navantia
Crew on board Canberra
Photo Photo
28