© Irrigation Association
Determine the System Interval
• Intervals during peak and non-peak periods
• Scheduling with the checkbook method
![Page 3: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/3.jpg)
© Irrigation Association
Take Advantage of Off-Peak Pricing
• Electrical power rate structures
• Special electrical controls
• Modifications to design
![Page 4: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/4.jpg)
© Irrigation Association
Use Soil Moisture Sensors to Improve
Scheduling
• Simple measurements
• Soil based controls
![Page 5: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/5.jpg)
![Page 6: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/6.jpg)
© Irrigation Association
Start and Stop the System
• Soil moisture trigger points
• Anticipating rain
![Page 7: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/7.jpg)
Appearance of clay, clay loam, and silty clay loam soils at various soilmoisture conditions.
Available Water Capacity 1.6-2.4 inches/foot
Percent Available: Currently available soil moisture as a percent of available water capacity.
In/ft. Depleted: Inches of water needed to refill a foot of soil to field capacity.
0-25 percent available 2.4-1.2 in/ft. depletedDry, soil aggregations separate easily, clods are hard to crumble with applied pressure.
(Not pictured)
25-50 percent available 1.8-0.8 in/ft. depletedSlightly moist, forms a weak ball, very few soil aggregations break away, no water stains, clods
flatten with applied pressure.
![Page 8: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/8.jpg)
OLD and NEW TOOLS
![Page 9: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/9.jpg)
![Page 10: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/10.jpg)
© Irrigation Association
Scheduling Multiple Pivots
Pressure constraints
![Page 11: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/11.jpg)
© Irrigation Association
Computer Management
![Page 12: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/12.jpg)
© Irrigation Association
Implement Current Control Technology
Off-site sensing and control
(SCADA)
Telemetry (radio, cellular, etc.)
![Page 13: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/13.jpg)
© Irrigation Association
![Page 14: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/14.jpg)
© Irrigation Association
![Page 15: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/15.jpg)
© Irrigation Association
Uniformity Based on Infrared
![Page 16: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/16.jpg)
© Irrigation Association
Modify Soil Cultivation Practices to Reduce
Runoff
Call in number 1-888-450-5996, confirmation # 3268441.Call in number 1-888-450-5996, confirmation # 3268441.Call in number 1-888-450-5996, confirmation # 3268441.
![Page 17: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/17.jpg)
Dammer-Dikker
![Page 18: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/18.jpg)
Surface storage from crop residue
![Page 19: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/19.jpg)
© Irrigation Association
Blocking Off the Furrow
![Page 20: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/20.jpg)
© Irrigation Association
![Page 21: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/21.jpg)
© Irrigation Association
Let’s Go to Our Manuals and Look at Setting Irrigation
Intervals
![Page 22: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/22.jpg)
© Irrigation Association
Chapter 9Draw Up Plans and
Specs
![Page 23: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/23.jpg)
© Irrigation Association
Combine Manufacturer Plans with Local Details
![Page 24: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/24.jpg)
Plan view
© Irrigation Association
![Page 25: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/25.jpg)
Details
© Irrigation Association
![Page 26: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/26.jpg)
© Irrigation Association
Compile a Systems Specifications Manual
• Manufacturer specs
• Retention pond
• Well and/or screening
• Mainline
• Pump
![Page 27: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/27.jpg)
© Irrigation Association
![Page 28: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/28.jpg)
© Irrigation Association
Compile a System Operations Manual
• Pivot operation and maintenance
• Scheduling guidelines
• Application/depth vs. speed
• Winterization of the system
![Page 29: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook](https://reader030.vdocuments.net/reader030/viewer/2022032806/56649f0a5503460f94c1e10e/html5/thumbnails/29.jpg)
© Irrigation Association
Let’s Go to Our Manuals -
Chapter 9