Mangiang Water InitiativeProjects for Underserved Communities 2012-2013Papua New Guinea Team
1
![Page 2: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/2.jpg)
Introduction
2
![Page 3: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/3.jpg)
Our Team
3
Jane Kilgore ✔
Nita Soni ✔Tank Stand Design
Taylor NordstromProject Manager
Manav MandhaniLogistics
Ashwin Ramaswami ✔Assistant PM/Design Lead
Crystal Cassimere ✔Communications Community Impact
![Page 4: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/4.jpg)
4
Papua New Guinea
![Page 5: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/5.jpg)
5
Primary Stakeholders
![Page 6: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/6.jpg)
Our Project
6
Existing Well Previous Solar Pumping Project
![Page 7: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/7.jpg)
Focus Areas Since SLAB 4
• Technical Advisor• Neil Higa
• Design• Finalizing Design
• Tank Stand• Finalizing Budget
• Wire transfer
• Logistics• Visas• Flights• On-the-ground support
7
![Page 8: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/8.jpg)
Travel
8
![Page 9: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/9.jpg)
Implementation Trip PlanAugust 9th – August 25th
• Travel Information• Team lands in Lae on August 12th
• 11 days in Mangiang
• Travelers• Project Manager: Ashwin Ramaswami (BME)• Crystal Cassimere (SW)• Nita Soni (ME)• Jane Kilgore (SW)• Technical Advisor: Neil Higa 9
![Page 10: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/10.jpg)
Travel Logistics• Accommodation• 11-Mile Camp (team divided among two buildings)• Single Furnished Rooms• Amenities: Air conditioning, fitness facilities, on-site security,
Internet access, free same-day laundry• Food Provided
• Boxed lunches• Community provides lunch during visits
10
![Page 11: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/11.jpg)
• Communication• Cell phone service available in Mangiang• Drivers/Security carry cell phones and satellite phones
• Transportation• Two-vehicle escort• Well-paved highway, except for periodic potholes• Final 100m only traversable by four-wheel drive• Depart camp at 6 am; leave Mangiang at 3 pm
• Travel and Security• Provided by G4S through EHL• Security will escort travelers between Domestic and International
terminals in Port Moresby• Driver and security escort at all times in Lae and Mangiang
• Satellite phones, radio communication• Confirmed attendance with Bob Kamila to Mangiang
11
![Page 12: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/12.jpg)
Travel Preparation• Completed✔ Flight procurement✔ Travel physicals✔ Immunizations
• In Progress• PNG Visas• $50/person due upon
arrival• Australian visas
12
• Flight Donations• Jim Wiethorn (300,000 miles)• Mary Lou Ralls-Newman (20,000 miles)• Matthew Smith (approx. 300,000 miles)• Shauna Black (20,000 miles)
![Page 13: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/13.jpg)
First Aid• Team has purchased: • Available at EHL:
• Full-time doctor and clinic available at camp
13
![Page 14: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/14.jpg)
Design
14
![Page 15: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/15.jpg)
Design Progress• Finalized all PUC design
• Sent design packet to ATCDI• Working to confirm material prices
• Working with ATCDI on constructability
15
![Page 16: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/16.jpg)
Design Schematic
16
![Page 17: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/17.jpg)
Tank Stand
17
![Page 18: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/18.jpg)
Advisors• Dr. Tassoulas• Dr. Engelhardt• PhD student: Kerry
Kreitman
18
![Page 19: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/19.jpg)
Assumptions
19
Load Combinations ASCE 7
Steel AISC manual
Concrete ACI 318
Seismicity USGS
Load and Resistance Factor Design
![Page 20: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/20.jpg)
20
Structure
![Page 21: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/21.jpg)
Connections
21
![Page 22: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/22.jpg)
Footings
22
![Page 23: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/23.jpg)
Construction
23
At Unitech- Cut members to size, drill holes, cut slots- Weld plates to beams - Weld L-brace to beams- Assemble two frames
At Maniang site- Dig holes for 4 column bases- Place frames in holes and lift- Bolt the X-braces in place- Bolt the 2 remaining perimeter beams- Bolt the interior beams- Widen the base holes- Make footing forms- Start mixing concrete- Insert rebar to column- Add concrete -Cover with tarp for several days-Place and secure tank with chains/straps
Truck materials to Mangiang
![Page 24: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/24.jpg)
Hydraulic System
24
![Page 25: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/25.jpg)
Design Overview
• Population Serving: 500 people in village center• Daily Demand/Person: 20 L
-Drinking, cooking, sanitation• Total Demand: 10,000 L/day• System: Non-battery powered, will pump when appropriate
solar insolation• Pump/Controller: Lorentz PS200 HR-14• Storage Tank: 9000L Tuffa Tank• Assumed Pumping Day: 5 hrs (conservative)• Design Pumping Rate: 33.3 L/min (9 gpm)
25
![Page 26: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/26.jpg)
Pump/Controller• Lorentz PS200 HR-14 • Helical Rotor Submersible Pump
• PS 200 Controller• Controls Pump System
• Two inputs: Well Probe (Dry Running Protection) + Float Switch (tank)
• Adjustable Pump Speed
• Time Delays for Low-Water Level, Full Tank, Insufficient Sun
• Indicator Lights: System Power, Pump On, Source Low, Tank Full, Insufficient Sunshine, Pump Speed
• Over Current Protection
• Clear Casing to be covered
26
![Page 27: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/27.jpg)
Pump/Controller
• Helical Rotor Submersible Pump• Life up to 15 years with proper operation• Float switches• Well cover to prevent debris• Proper electrical components
• DC motor • Stainless Steel/ Rubber Exterior
27
![Page 28: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/28.jpg)
Piping• Total Pumping Head: 33.69’ (10 m)• 12’ (stand)
6.34’ (tank)3.47’ (Fitting Losses) 0 .81’ (Friction Losses) 9.46’ (pump to grade)
• GI Piping for Risers, out of ground piping, spigots• 40 mm for Well Tank, Tank Outlet, Taps 2-4 • 20 mm for Tap 1
• 40 mm HDPE tubing for underground lateral piping
• 1” GI Drop Pipe
• Piping to be buried 2’ underground28
![Page 29: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/29.jpg)
Spigots• 4 taps • 1) Adjacent to the tank (2-3 m)• 2) 341⁰N, 93m• 3) 10⁰N, 153m• 4) 83⁰E, 55m (1 ft. elevation
rise)• Concrete Slab as foundation for
each water tap• 24 in x 24 in x 5 in
29
![Page 30: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/30.jpg)
Other Design Measures• Well Cover:• Working with ATCDI to
fabricate
• Drop Pipe Support:• Working with structural
engineer to verify strength• Working with ATCDI to
fabricate
30
![Page 31: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/31.jpg)
31
![Page 32: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/32.jpg)
Work Division• PUC• Laying of concrete slabs for taps• Organize laying of pipe with community• Oversee proper use of materials
• ATCDI• Organize laying of pipe with community• Oversee proper construction of system• Cutting of pipe length
• Mangiang Community• Dig trenches for piping• Lay pipeline with supervision• Mixing concrete
32
![Page 33: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/33.jpg)
Solar System
33
![Page 34: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/34.jpg)
Overview• Pump Input Power: 145 W • Voc > 34V
• Grounding Equipment• Copper Grounding Rod/Wire attached to panel frame
• PVC Conduit buried 2’• Circuit Breaker for manual
shut off
34
![Page 35: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/35.jpg)
Components• Solar Panel• Solar Panel Mount• 80 mm Panel Support pipe: 2.6 mm• Circuit Breaker• Copper Grounding Wire• Copper Grounding Rod• Grounding Lugs• Outdoor Cabling- 3 wire• PS 200 Control Box• PVC Conduit• Submersible Pump Cable- 3 wire• EC Drive Motor• HR-14 Submersible Pump• Water Level Probe• Submersible Cable for Float Switch• Cable Splice• Float Switch• MC4 Connections• Stainless Steel Drop Cable• Cable Ties• Electrical Tape
35
![Page 36: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/36.jpg)
Work Division• ATCDI will oversee construction with much assistance from
PUC• ATCDI has employees who are capable of installing electrical
equipment• PUC will be responsible for ensuring proper safety and
assembly of system• ATCDI/Unitech is responsible for final verification of a quality
system• Electrician from ATCDI will verify correct and safe implementation
of electrical system
36
![Page 37: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/37.jpg)
Material Acquisition• Solar equipment purchased from SOLCO supplier• Purchased by team
• ATCDI will procure additional materials before team arrives• All piping and fittings will be purchased in Lae at one of
multiple locations• Plum Trade is primary option
• Tank stand materials will be purchased in Lae• Atlas supplier
37
![Page 38: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/38.jpg)
Material Transportation• Working with Matthew Smith at EHL to obtain truck to
transport materials• Originally conceptualized by Marty Rumbaugh and Graham
Lawrence during recon trip
38
![Page 39: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/39.jpg)
Schedule
39
![Page 40: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/40.jpg)
Schedule
40
![Page 41: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/41.jpg)
System Manual• Team will create as-built drawings to include with manual• Included information• Maintenance of system• Basic water hygiene• Improving water quality• Improving security of system
41
![Page 42: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/42.jpg)
Budget and Fundraising
42
![Page 43: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/43.jpg)
Support Obtained• Support from EHL• Contributor: Jimmy Canning• Coordinators: Matthew Smith and Graham Lawrence• Lodging and Food• Transportation and Security
• EAB• $14,000 for materials and technical advisor travel
• ATCDI/Mangiang Community• Primarily unskilled labor• Consulting fees to ATCDI 43
![Page 44: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/44.jpg)
Indiegogo Campaign• Raised $1,036 • Received $911.68• Less $110 for perks
• Back to PUC • $801.68 and any unused
project funds
44
![Page 45: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/45.jpg)
Solar & Pump Expenses
45
![Page 46: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/46.jpg)
Piping Expenses
46
Piping Expenses Item Specification Supplier Unit Size Notes Price (Kina)/Unit Price USD/Unit Quantity Total Cost USDPiping Poly Pipe 40 mm Plum Trade 1 m 150 m roll PGK 8.50 $3.73 250 $932.02 Poly Coupling 40 mm Plum Trade PGK 23.00 $10.09 3 $30.26 Poly Tee 40 mm Plum Trade PGK 22.14 $9.71 3 $29.13 Galv Pipe 20 mm Plum Trade 6 m PGK 46.40 $20.35 1 $20.35 Galv Pipe 40 mm Plum Trade 6 m PGK 119.20 $52.28 8 $418.25 Galv Elbow 20 mm Plum Trade PGK 3.80 $1.67 8 $13.33 Galv Elbow 40 mm Plum Trade PGK 11.60 $5.09 20 $101.75 Galv Coupling 40 mm Plum Trade PGK 7.30 $3.20 20 $64.04 Galv reducer 40 > 20 1 Br. Bib Cock 20 mm Plum Trade PGK 27.15 $11.91 4 $47.63 Galv Pipe Hanger 40 mm 3 Quikcrete 44.5 kg Plum Trade 1 bag PGK 22.50 $9.87 15 $148.03 Well Cover Bolts 20 mm Plum Trade 4 Hinge 4 inch 2 Aluminum Sheet 1 m x 1 m 1 Panel Mount Galv Pipe 80 mm Plum Trade 6m PGK 145.40 $63.77 1 $63.77 Subtotal $1,868.56 VAT $186.86 15% Contingency $308.31
Category Total $2,363.73
![Page 47: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/47.jpg)
Tank Stand Expenses
47
Tank Stand ExpensesItem Specification Supplier Price/Kina Price/USD Quantity TotalTuffa Tank 9000 L Bowmans PGK 3,600.00 $1,578.95 1 $1,578.95HSS 4x4x3/16in x24ft Atlas $250.00 4 $1,000.00HSS 6x3x1/4in x24ft Atlas $365.00 2 $730.00HSS 4x2x1/4in x24ft Atlas $230.00 3 $690.00Plate 1x2ft x3/8in Atlas $400.00 1 $400.00Angle 125x75x6mm Plum $280.00 1 $280.00Angle 8x6x3/4in Atlas $70.00 8 $560.00Rebar 10ft x 1/2 in Atlas $6.00 9 $54.00Bolts/Nuts 1.5in x 1/2in dia (20 pc) Atlas $5.00 4 $20.00Concrete 44.5 kg Plum Trade $9.87 41.02 $404.87Chain 5/16in x 50ft $120.00 1 $120.00 Subtotal $5,837.82 VAT (10%) $583.78 Contingency (15%) $963.24 Total Available $7,384.84
![Page 48: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/48.jpg)
Capital Project Expenses
48
Category Cost (USD)Solar Equipment and Pump $3,800.00 Piping and spigots $2,363.73 Tank and Tank Stand $6,016.84 Contracting Fees to ATCDI $877.19
10% VAT and Contingencies Included
Total Materials Cost $13,355.87
![Page 49: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/49.jpg)
Technical Advisor Expenses
49
Price USD/unit Quantity Total Cost USD
Technical Advisor Expenses
Fees for flights from SYD to LAX and LAX to AUS $540.40 1 $540.40
Flight from SYD to POM $441.72 1 $441.72
Roundtrip Port Moresby to Lae $285.48 1 $285.48
Hotel Sydney (3 nights) $305.91 1 $305.91
Meals in Australia $200.00 1 $200.00
Taxi $30.00 2 $60.00
Visa $50.00 1 $50.00
Subtotal $1,883.51
5% Contingency $94.18
Category Total $1,977.69
![Page 50: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/50.jpg)
Miscellaneous Project Expenses
50
Miscellaneous Project Expenses
Cost (USD) Units Occurences Total Cost USDA First Aid Kit $36.44 1 1 $36.44
B Gifts for Hosts $100.00 1 1 $100.00
C Callings Cards $5.00 1 10 $50.00
TOTAL Category 2 $186.44
![Page 51: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/51.jpg)
Budget Summary
51
Category Cost (USD)In-Country Expenses $0.00
Technical Advisor Cost $1,977.69Capital Project Expenses (including contingency) $13,335.87
Miscellaneous Project Expenses $186.44Budget $ 15,500.00
![Page 52: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/52.jpg)
Transfer Progress• ATCDI• Received bank routing information• Have sent Work Agreement and PIF to ATCDI
• Awaiting response
• SOLCO• Have received PIF and bank routing information• Finalizing quote for solar equipment
52
![Page 53: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/53.jpg)
Social Work
53
![Page 54: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/54.jpg)
Hygiene and Water Safety• Community has basic knowledge of hygiene and water
usage but limited practice• Activities with designated community groups• Surveys (Baseline/Evaluation)
54
![Page 55: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/55.jpg)
Hygiene and Water Safety PlanWomen’s GroupSchool Children• One day during implementation• Posters• Easily translated• Donate to school
• Activities• Glitter game• Board game
• Limitation: Language barrier• Translated materials• Bob Kamila, Water Users
committee, or security personnel (?)
55
![Page 56: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/56.jpg)
Hygiene and Water Safety
56
![Page 57: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/57.jpg)
Surveys• Red Cross and Red
Crescent PHAST Base-line Survey• Abbreviated• Focus on water
sources, usage, and hygiene
• Maniang Water Initiative Community Impact Survey• Written by Jane,
Crystal, and Anna Harris (Dr. Gilbert’s student)
• Social impact of PUC project
• IRB approval submitted to Dr. Gilbert TODAY
57
![Page 58: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/58.jpg)
Surveys• Recruitment• Start with established contact in the Water Users
Committee• From there, branch out to others in the community
58
![Page 59: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/59.jpg)
Conclusion
59
![Page 60: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/60.jpg)
Focus Areas Moving Forward• Travel Logistics• Work with ATCDI to obtain aid work visas
• Technical Planning• Finalize cost of materials• Finalize constructability issues• Details of truck for material transportation• Procure solar equipment• Work Agreement between PUC and ATCDI
• Begin procuring materials
• Individual Student Preparation• Obtain Australian visas• Register travel with ISOS 60
![Page 61: Mangiang Water Initiative](https://reader035.vdocuments.net/reader035/viewer/2022070500/568168b3550346895ddf82eb/html5/thumbnails/61.jpg)
61
Thank You!
Questions?