Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility
Reasons for constructing a new facilityReasons for constructing a new facility Increase in treatment capacityIncrease in treatment capacity
Considerations for evaluating technologiesConsiderations for evaluating technologies Reuse quality to conserve waterReuse quality to conserve water Efficient, low costEfficient, low cost Odor control due to high traffic areaOdor control due to high traffic area Aesthetics – directly on major state highwayAesthetics – directly on major state highway
Technology chosen – Seghers UNITANK Technology chosen – Seghers UNITANK
Advantages of the Marburg WWTPAdvantages of the Marburg WWTP Compact footprint for a 1.5 MGD facilityCompact footprint for a 1.5 MGD facility Completely enclosed – meeting our aesthetic Completely enclosed – meeting our aesthetic
requirementsrequirements Biological process – no chemicals are used in the Biological process – no chemicals are used in the
treatment processtreatment process Includes a natural odor control Includes a natural odor control Produces reuse quality water for golf course and Produces reuse quality water for golf course and
recreation fieldsrecreation fields Includes dedicated spray fields in case golf course or Includes dedicated spray fields in case golf course or
ball fields do not need to use waterball fields do not need to use water
Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility
Marburg Plant capacity and usageMarburg Plant capacity and usage Plant has both a reuse permit & Plant has both a reuse permit &
discharge permitdischarge permit Plant is fully enclosed with natural Plant is fully enclosed with natural
odor controlodor control
Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility
MARBURG NPDES
PERMIT LIMITSAVERAGE
RESULTS
BOD5 (mg/L) 20 2.8
TSS (mg/L) 20 1.5
TOTAL PHOSPHOROUS (mg/L) report 3.8
AMMONIA (mg/L) 5 1.6
FECAL COLIFORM (col/100ml) 200 2.6
TURBIDITY (NTU) NA 1.2
MARBURG NPDES
PERMIT LIMITSAVERAGE RESULTS
BOD5 (mg/L) 20 2.8
TSS (mg/L) 20 1.5
TOTAL PHOSPHOROUS (mg/L) report 3.8
AMMONIA (mg/L) 5 1.6
FECAL COLIFORM (col/100ml) 200 2.6
TURBIDITY (NTU) NA 1.2
MARBURG REUSE
PERMIT LIMITSAVERAGE RESULTS
BOD5 (mg/L) 5 2.5
TSS (mg/L) 5 1.3
TOTAL PHOSPHOROUS (mg/L) report 3.8
AMMONIA (mg/L) 5 1.6
FECAL COLIFORM (col/100ml) 23 2.6
TURBIDITY (NTU) 3 1.2
Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility
Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility
Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility
Wastewater ReuseWastewater Reuse
Chimney’s Golf CourseChimney’s Golf Course
Uses recycled water as irrigation to provide the Uses recycled water as irrigation to provide the course with a constant, dependable supply of course with a constant, dependable supply of water during these times of increased watering water during these times of increased watering
restrictions and drought.restrictions and drought.
Wastewater ReuseWastewater Reuse
Chimney’s Golf CourseChimney’s Golf Course
Construction of Hole #2Construction of Hole #2
Wastewater ReuseWastewater Reuse
Dedicated Spray FieldsDedicated Spray Fields
Wastewater ReuseWastewater Reuse
Chimney’s Golf CourseChimney’s Golf Course
Aerial View of Plant, Golf Course and Spray Aerial View of Plant, Golf Course and Spray FieldsFields
Wastewater Treatment & Wastewater Treatment & CollectionCollection
Barrow County Recreation FieldsBarrow County Recreation Fields
Wastewater ReuseWastewater Reuse
Barrow County Recreation FieldsBarrow County Recreation Fields
Wastewater ReuseWastewater Reuse
Barrow County Recreation FieldsBarrow County Recreation Fields
Tim WhitingTim Whiting
Apalachee High SchoolApalachee High School
Trace Mc DanielTrace Mc Daniel
Winder Barrow High SchoolWinder Barrow High School
Brett MarbutBrett Marbut
Winder Barrow High SchoolWinder Barrow High School
Shawnee PattersonShawnee Patterson
Apalachee High SchoolApalachee High School
Cedell LongCedell Long
Winder Barrow High SchoolWinder Barrow High School
Wastewater ReuseWastewater ReuseWinder-Barrow High School Softball Winder-Barrow High School Softball
&& Baseball Fields Baseball Fields
Max PentecostMax Pentecost
Winder Barrow High SchoolWinder Barrow High SchoolTrace Clamp, Jonathan Fuller & Trace Clamp, Jonathan Fuller &
Brendan VealBrendan Veal
Wastewater TreatmentWastewater Treatment
Wastewater Treatment Cedar Creek Water Reclamation Facility July 2008 4 MGD of wastewater treatment capacity. State of the art treatment plant that
produces clean water with very minimum odor for
the residents who live in close proximity of the plant.
Wastewater TreatmentWastewater Treatment
Cedar Creek Water Reclamation Facility
MARBURG NPDES
PERMIT LIMITSAVERAGE
RESULTS
BOD5 (mg/L) 20 2.8
TSS (mg/L) 20 1.5
TOTAL PHOSPHOROUS (mg/L) report 3.8
AMMONIA (mg/L) 5 1.6
FECAL COLIFORM (col/100ml) 200 2.6
TURBIDITY (NTU) NA 1.2
Wastewater TreatmentWastewater Treatment
CEDAR CREEK NPDES
PERMIT LIMITS AVERAGE RESULTS
BOD5 (mg/L) 5 2.4
TSS (mg/L) 5 1.7
TOTAL PHOSPHOROUS (mg/L) 1 0.5
AMMONIA (mg/L) (N-A)7.4 & (M-O)3.5 1.6
FECAL COLIFORM (col/100ml) 200 9
TURBIDITY (NTU) N/A 1.1