M. L. [email protected]
Assistant Professor, Engineering Seismology andSeismotectonicsDepartment of Earthquake EngineeringIndian Institute of Technology RoorkeeUttranchal, INDIA
Phone : 01332 285536(0), 285055(R), 275062(R),9412075062(Mb)Fax : 01332 276899/ 273560Web : http://mukatsharma.tripod.come-mail : [email protected]
Research Publications Research ProjectsResearch Guidance
Consultancy Projects Technical Reports
TOP
REVIEWED PUBLICATIONS ININTERNATIONAL/NATIONAL JOURNALS -14
TOP
1. Sharma, M. L. (2003) Seismic hazard iniNorthern India region SeismologicalResearch Letters, Vol. 74, Number 2,March/April 2003, 140-146.
2. Sharma, M. L., H. R. Wason and R. Dimri,(2003) Seismic zonation of Delhi for bedrock strong ground motion, Jour. of Pureand App. Geophy (in press).
3. Narayan, J. P., M. L. Sharma and AshwaniKumar (2002) A seismological report on theJanuary 26, 2001 Bhuj, India earthquake,Seismological Research Letters, Vol. 73,Number 3, May/June 2002, 343-355.
4. Wason, H. R., M. L. Sharma, P. K. Khan,K, Kapoor, D. Nandini and V. Kara (2002)Analysis of initial aftershocks of Chamolliearthquake of March 29, 1999 usingbroadband data, Himalayan Geology, Vol.23, No. 1&2, pp 7-18.
5. Arora, M, V. K. M. Patel and M. L. Sharma(2002), SAR interferrometry for DEMgeneration, GIS development , June 2002,pp1-3
6. Sharma, M. L. and D. Shanker (2001),Estimation of seismic hazard parameters for
the Himalayas and its vicinity from mix datafiles, ISET Journal of EarthquakeTechnology Vol. 38, No.2-4, 93-102
7. Shanker, D. and M. L. Sharma (1998)Estimation of seismic hazard parameters forthe Himalayas and its vicinity from completedata files, Journal of Pure and AppliedGeophysics (PAGEOPH), Vol. 152, No. 2,pp 267-279.
8. Arora, M and M. L. Sharma (1998) Seismichazard analysis - An Artificial NeuralNetwork Approach, Current Science, Vol.75, No. 1, pp 54-59
9. Paul, A., M. L. Sharma and V. N. Singh(1998) Estimation of focal parameters forUttarkashi earthquake using peak groundhorizontal accelerations, ISET Journal ofEarthquake Technology., Vol. 35, No. 1-3,pp 1-8.
10. Sharma, M. L. (1998) Attenuationrelationship for estimation of peak groundhorizontal acceleration using data fromstrong motion arrays in India, Bull. Seism.Soc. Am. Vol 88, pp 1063-1069.
11. Shanker, D. and M. L. Sharma (1997)Statistical analysis of completeness ofseismicity data of the Himalayas and itseffect on earthquake hazard determination,Bull. Ind. Soc. Earthq. Tech., Vol. 34, No. 3,pp 159-170.
12. Sharma, M. L. and H. R. Wason, (1995)Seismic moment-magnitude relationship forthe Garhwal Himalaya Region, Bull. Ind.Soc. Earthq. Tech., Vol. 32, No. 3, pp 85-95
13. Sharma, M. L. and H. R. Wason. (1994)Occurrence of low stress drop earthquakes inGarhwal Himalaya region, Physics of theEarth and Planetary Interior, 85, pp 265-272.
14. Sharma, M. L. (1992) Sample telemetereddigital seismic array in Garhwal Himalaya -Software and data management, HimalayanSeismicity Memoir No. 23, Geo. Soc. ofIndia, pp 67-80.
PAPERS PRESENTED ININTERNATIONAL/NATIONAL CONFERENCES –40
1. Narayan, J. P., M. L. Sharma and AshwaniKumar (2002) Local Site effects observedduring Bhuj earthquake, Workshop on BhujEarthquake, IIT Kanpur, January 27-29.
2. Ameer, A. S., M. L. Sharma and H. R.Wason (2002) Completeness of earthquakecatalogue and its implications in earthquakehazard estimation – a case study for Iraq. 12Symposium on Earthquake Engineering,Roorkee, Dec. 16-18, 2002, Vol I, 342-349
3. Ameer, A. S., M. L. Sharma and H. R.Wason (2002) Maximum likelihoodestimation of seismic hazard for Iraq fromcomplete data files, 12 Symposium onEarthquake Engineering,, Roorkee, Dec. 16-18, 2002, Vol I, 306-310.
4. Narayan, J. P., M. L. Sharma and AshwaniKumar (2002) Damage survey report: Bhujearthquake, January 26, 2001, 12 Symposium
on Earthquake Engineering, Roorkee, Dec.16-18, 2002, Vol II, 727-736.
5. Saini S., M. L. Sharma and S.Mukhopadhyay (2002) Strong groundmotion empirical attenuation relationship forseismic hazard estimation in Himalayaregion, 12 Symposium on EarthquakeEngineering, Roorkee, Dec. 16-18, Vol I,143-150.
6. Sharma, M. L., M. Khan and M. K. Arora(2002) A GIS based approach for seismichazard assessment, Asian Seismologicalcommission 2002, Symp. On Seismology,earthquake hazard assessment and riskmanagement, 24-26 Nov, 2002, kathmandu,Nepal, p-43
7. Sharma, M. L. and M. Arora (2002)Cyclic behavior of seismicity in theHimalayas and its prediction using ANN,Asian Seismological commission 2002,Symp. On Seismology, earthquake hazardassessment and risk management, 24-26Nov, 2002, kathmandu, Nepal, p-158-159.
8. Sharma, M. L. (2002) SeismicMicrozonation of Mega cities, Indo-Chinajoint workshop on Natural disasters, Jan.21-23,2002, New Delhi.
9. Narayan, J. P., M. L. Sharma and A. Kumar(2001) Local site effects during the Bhujearthquake of January 26, 2001, Report onBhuj Earthquake, DST Report (in press).
10. Wason, H. R., M. L. Sharma and D.Nandini (2001) Aftershock activity of theChamoli earthquake of march 29, 1999recorded by broadband seismograph
stations, Proc. Workshop on recentearthquakes of Chamoli and Bhuj, May 24-26, Roorkee, Vol. I, pp29-39.
11. Sharma, M. L. (2001) The Bhuj Earthquakeof January 26, 2001 – SeismotectonicImplications, Proc. Workshop on recentearthquakes of Chamoli and Bhuj, May 24-26, Roorkee, Vol II, pp353-358.
12. Sharma, M. L. (2001) Seismotectonicimplications of Chamoli earthquake ofMarch 29, 1999, Proc. Workshop on recentearthquakes of Chamoli and Bhuj, May 24-26, Roorkee, Vol II, pp359-368.
13. Sharma. M. L., M. Arora and Y. V. Raju(2001), Seismic hazard analysis of theHimalayan region using Artificial NeuralNetwork, International Conference onSeismic Hazard with particular reference toBhuj earthquake of January 26, 2001, NewDelhi, Abstract Vol., pp. 280-282.
14. Narayan, J. P., A. Kumar and M. L. Sharma(2001) Seismological aspects of Bhujearthquake of January 26, 2001, Chapter 1,in report on Bhuj earthquake of Jan. 26,2001, Department of EarthquakeEngineering, IIT Roorkee (in press).
15. Sharma, M. L. and R. G. K. Nath (2001),Attenuation relationship for peak groundhorizontal acceleration for Indian region,International Conference on Seismic Hazardwith particular reference to Bhuj earthquakeof January 26, 2001, New Delhi, AbstractVol., pp333-335.
16. Narayan, J. P., M. L. Sharma, A. Kumar(2001) Damage scenario of Bhuj earthquake,
Jan. 26, 2001, News Letter, Indian Soc.Earthquake Tech., April-Oct., 2001, pp27-29.
17. Sharma, M. L. (2000) Attenuationrelationship for estimation of peak groundvertical acceleration using data from strongmotion arrays in India, 12th Worldconference on Earthquake Engineering, NewZealand, 1964/ 4 / A, pp1-8.
18. Wason, H. R. and Sharma, M. L. (2000)Source parameter studies of localearthquakes in the Garhwal Himalaya regionbased on the digital broad band data, 12thWorld conference on EarthquakeEngineering, New Zealand, 1776 / 4 / A, pp1-8.
19.Sharma, M. L. and R. N. Dubey (2000)Seismological Aspects, A Report on Chamoliearthquake of March 29, 1999, Publ. byDepartment of Earthquake Engineering,UOR, pp 1-25.
20. Wason, H. R., M. L. Sharma, A. K. Guptaand Kamal Kapoor (2000) Broadbandseismic Recording, A Report on Chamoliearthquake of March 29, 1999, Publ. byDepartment of Earthquake Engineering,UOR, pp 45-61.
21. Wason, H. R., M. L. Sharma, P. K. Khan,Kamal Kapoor, D. Nandini and V. Kara(2000) A preliminary analysis of broadbandseismic data of Chamolli earthquake and itsaftershock sequence, Lessons learnt fromChamolli earthquake, Abstract Vol. WIHG,Dehradun, pp 37
22. Sharma, M. L. (1999), Quantification ofEarthquakes, IVth SERC school onSeismology and Earthquake Processes (SEP-IV) with special emphasis on Strong MotionSeismology, April 12-30, Roorkee, Vol. I.,81-89.
23.Sharma, M. L. (1999) Instrumentation forlocal seismological networks, IVth SERCschool on Seismology and EarthquakeProcesses (SEP-IV) with special emphasison Strong Motion Seismology, April 12-30,Roorkee, Vol. II., 49-56.
24.Sharma, M. L. (1999) Prediction of StrongGround Motion, IVth SERC school onSeismology and Earthquake Processes (SEP-IV) with special emphasis on Strong MotionSeismology, April 12-30, Roorkee, Vol. II.,306-322.
25. Kumar, A., A. D. Pandey, M. L. Sharma, S.C. Gupta, A. K. Jindal and S. K. Jain (1998)Pattern of two earthquake swarms in theGarhwal Himalaya, XIth Symposium onEarthquake Engineering, Roorkee, pp 67-74.
26. Wason, H. R., M. L. Sharma, A. K. Guptaand Kamal Kapoor (1998) A preliminaryanalysis of broad band data in the GarhwalHimalaya region, XIth Symposium onEarthquake Engineering, Roorkee, pp 85-100.
27. Shanker, D. and M. L. Sharma (1998)Maximum Likelihood estimation of seismichazard parameters in the Himalaya and itsvicinity from mixed data, Geosciences - 98,University of Keel, UK, April 14-18.
28. Shanker, D. and M. L. Sharma (1997)Estimation of seismic hazard parameters forthe North East India and its surroundingregion, Proc. Workshop on EarthquakeDisaster Preparedness, Roorkee, Oct 13-14,1997, pp 49-58.
29. Shanker, D. and M. L. Sharma (1997)Estimation of seismic hazard parameters forthe Himalayas and its vicinity from completedata files, Workshop, W5- New concepts andprocedures in earthquake hazard estimation,29th General Assembly of IASPEI,Thessaloniki, Greece, Aug 18-28, pp 303.
30. Kumar, A., A. D. Pandey, M. L. Sharma, S.C. Gupta, A. K. Jindal and S. K. Jain (1997)Contemporary local seismicity in theGarhwal Himalaya, Proc. Workshop onEarthquake Disaster Preparedness, Roorkee,Oct 13-14, 1997, pp 39-48
31. Sharma, M. L. and P. N. Agrawal (1994) Acomparative study of few attenuationrelationships, Proc. Xth Symposium ofEarthquake Engineering, Roorkee, Nov. 16-18 , Vol I, pp 169-175.
32. Kumar, A., A. D. Pandey, M. L. Sharma, S.C. Gupta, A. Kumar, B. K. Gupta.(1994)Preliminary processing and interpretation ofdigital data obtained from digital seismicarray in Garhwal Himalaya, Proc. XthSymposium of Earthquake Engineering,Roorkee, Nov. 16-18, Vol I, pp 141-152.
33. Sharma, M. L. and H. R. Wason (1994)APP - An automatic phase picking algorithmdeveloped for digital telemetered seismicarray data, Proc. Xth Symposium of
Earthquake Engineering, Roorkee, Nov. 16-18, Vol I, pp 159-168.
34.Sharma, M. L. (1993) Automatic phasepickers, Proc. UNESCO Internationalcourse on Seismology and Seismic riskassessment, Nov. 1-Dec. 4, Roorkee, 100-110.
35. Sharma, M. L. and L. S. Srivastava (1992)Automation in earthquake monitoring,National Seminar on Automation inMetrology, National Physical Laboratory,New Delhi, Feb 19-21.
36. Sharma, M. L., S. C. Gupta and H. R.Wason (1990) An automatic phase picker forearthquakes, Proc. International Conf. onAutomatic Robotics and Computer Vision,Singapore, pp 247-250
37. Sharma, M. L. and H. R. Wason (1989)Data acquisition aspects of digitaltelemetered micro earthquake networks,presented in silver jubilee Symp. of ISET,Roorkee, Feb. 25-26.
38. Srivastava, L. S., M. L. Sharma, A. D.Pandey and H. R. Wason,(1989) A digitaltelemetered seismic array in the Himalayas,Abstract 25th General Assembly of IASPEI,Istanbul, Turkey, Aug. 21st-Sept. 1st, pp 643.
39. Sharma, M. L., H. R. Wason and L. S.Srivastava (1987) Telemetered digitalseismic event recording system, Proc. VIthIndian Geological Congress, Roorkee, Feb.21-24, pp 127-130.
40. Wason, H. R., M. L. Sharma, Kirat Pal andL. S. Srivastava (1986) Digital telemeteredarray in Ganga Yamuna Valley, Proc. 8th
Symp. of Earthquake Engineering, Roorkee,Dec 29-31, pp 91-99.
TOP
DETAILS OF SPONSORED PROJECTS TOP
(Number of projects : 10)*- 3 in progress amounting to Rs. 88.30 Lakhs$- 7 completed amounting to Rs. 179.56 Lakhs
Sl. No. Name of the Project Funding Agency Duration
1.* Study of shallow earthquakes inIndian region using DifferentialSAR Interferometry. (PI)
AICTENew Dlhi
1.5 years(2002 onwards)
2.* Broadband Seismograph Networkfor Modelling of earthquakesource & upper crust in theGarhwal Kumaon Himalayaregion. (PI)
DSTNew Delhi
3 years(2002 onwards)
3.* Seismological network aroundTehri region(Co-PI)
THDC, Rishikesh 2001-2004
4.$ Seismological network aroundTehri region(Co-PI)
THDC, Rishikesh 1998-2001
5.$ Modelling of earthquake sourceand earth structure in the GarhwalKumaon Himalaya region usingbroad band seismic data.
DSTNew Delhi
1998-2000
(Submitting proposal forextension)(Co-PI)
6.$ Seismological network aroundTehri region(Co-PI)
THDC, Rishikesh 1995-98
7.$ Seismological Observatoriesmaintenance and data acquisition(Co-PI)
IRI, Rishikesh 1993-95
8.$ 'Digital Telemetered SeismicArray in Ganga-Yamuna Valley tomonitor local seismicity'(Co-PI)
DSTNew Delhi
1992-95
9.$ Short Aperture Sample DigitalTelemetered Seismic Array inGanga-Yamuna Valley(Co-PI)
DSTNew Delhi
1989-92
10$ Deployment of Short ApertureSample Digital TelemeteredSeismic Array in Ganga-YamunaValley (Co-PI)
DSTNew Delhi
1986-89
TOP
THESIS GUIDED TOP
1. Ph.D. Guidance
1. Ameer S. Ameer,“Simulation ofstrong groundmotion andestimation ofseismic hazard andrisk in typicalseismic environs (inprogress)
2. Javed Ahemed,“Microzonation ofmegacities” (inprogress)
3. Anupam Tyagi,“Understanding thephysics of theearthquake sourcesand development ofexpert system forearthquakeprediction” ( inprogress)
2. ME/M.Tech/M.Pihl/BE
Sl.No.
Degree Title of Thesis Year Name of students
1 M.Sc.Physics
Design and Fabrication of aninstrument for themeasurement of groundconductivity
1989 Pravesh GuptaAlka VermaVimal Shyam
2 B. E.E&C
Automatic earthquakerecognition
1990 A. GhoshN.P. GangwarA. Ramaswamy
3 M.Tech.Geophy.
Determination of codamagnitude of localearthquakes
1991 R. Verma
4 PG Dip(Eq.Engg.)
Seismological studies anddesign of Earth and Rockfilldam
1995 Kh. IbophisakSingh
5 M. Phil.Instru.
Fabrication of interface unitbetween seismometer andrecorder
1998 Kiran Pal
6 M. Phil.Instru.
Background noisecharacteristics of groundusing broad bandseismometers
1998 C. R. Gautam
7 PG Dip(Eq.Engg.)
Design of an 8-storyedreinfoced cocrete officebuilding in NE India
1998 Umakant Singh
8 ME(Eq.
Design of an 10-storyedbuilding in NE India at
1999 Amit SahuG. C. Mishra
Engg.) location A, Assam P. V. Prasada Ra0
9 ME(Eq.Engg.)
Design of an 10-storyedbuilding in NE India atlocation B, Mehghalaya
1999 R. G. K. NathNarendra MishraSanjay S. Gupta
10 ME(Eq.Engg.)
Design of an 10-storyedbuilding in NE India atlocation C, Maharashtra
1999 S. PandaSubrata SarkarY. S. Kumar
11 ME(Eq.Engg.)
Development of Attenuationrelationship for Indian Region
2000 R. G. K. Nath
12 ME(CAD.)
Seismic hazard Analysis usingArtificial Neural network
2000 Venkata Raju
13 ME(Civil)
Remote sensing application inseismic hazard studies
2001 S. K. Gupta
14 ME(Eq.Engg.)
Seismic hazard Analysis usingGIS
2001 M. Khan
15 M.TechEarthSciences
Development of attenuationrelationship for Himalayanregion using Indian Strongmotion array data
2002 Satyndra Saini
16 ME(Eq.Engg.)
Seismic microzonation ofDelhi
2002 Samba Shiva Rao
17 ME(Eq.Engg.)
Seismic hazard analysis andrisk computation
2002 K. C. Joshi
TOP
DEPARTMENTAL CONSULTANCY PROJECTS TOP
Participated in 62 departmental consultancy projectsamounting to Rs.359.78 LakhsIn progress 16 projects amounting to Rs. 222.58 LakhsCompleted 46 projects amounting to Rs. 137.20 Lakhs
Sl No Title Name of fundingAgency
Amount(Rs. InLakhs)
1. Site specific earthquake parameter forNizmo Bazgo HE project
NHPC, Faridabad 4.00
2. Site specific earthquake parameter forChamera Stage III HE project
NHPC, Faridabad 4.00
3. Site specific earthquake parameter forKishanganga HE project, J&K
NHPC, Faridabad 4.00
4. Site specific earthquake parameter for URIStage II HE project, J& K
NHPC, Faridabad 4.00
5. Site specific earthquake parameter forRailways Nabinagar Joint Venture thermalpower plant site
NTPC, Noida 4.00
6. Site specific earthquake parameter forNTPC-TNEB joint venture thermal powerplant site at Ennore
NTPC, Noida 4.00
7. Site specific earthquake parameter forNational Capital Power Project, Stage II,Dadri UP
NTPC, Noida 4.00
8. Site specific earthquake parameter forDhanikhari dam, Andaman and Nicobar
NHPC, Faridabad 4.00
9. Site specific earthquake parameter forSewa II HE project site, Himachal Pradesh
NHPC, Faridabad 4.00
10. Site specific earthquake parameter forKahalgaon Site, Bihar
NTPC, NewDelhi
4.00
11. Site specific earthquake parameter forSerlui (B) HE site, Mizoram
4.00
12. Safety of AIMS building againstearthquake forces
DDA, New Delhi 7.50
13. Site specific earthquake parameter forTeesta Low dam Stage III
NHPC, Faridabad 2.00
14. Site specific earthquake parameter studiesfor HE sites in Siang and Subansiri basin,Arunachal Pradesh
NHPC, Faridabad 12.00
15. Site specific earthquake parameter forBargi dam and its appurtenant structures
4.00
16. Site specific earthquake parameter forTeesta Low Dam Stage IV
NHPC, Faridabad 2.00
17. Seismological network around Tehriregion
THDC,Rishikesh
15.00
18. Study of Reservoir induced seismicityemploying short term Micro earthquakenetwork around Kameng HE project site inArunachal Pradesh
NEEPCO,Assam
58.00
19. Micro earthquake survey around Shyomedam site in Arunchal Pradesh Phase II –Microearthquake equipment
NHPC, Faridabad 61.08
20. Micro earthquake survey around MiddleSiang dam site in Arunchal Pradesh PhaseI – Feasibility and Back ground noisesurvey
NHPC, Faridabad 5.00
21. Site specific earthquake parameter studiesfor three sites in Arunachal Pradesh
NHPC, Faridabad 12.00
22. Site specific earthquake parameters ParbitiStage III dam site, Himachal Pradesh
NHPC, Faridabad 4.00
23. Site specific earthquake parameters Barh NTPC, New 4.00
site, Bihar Delhi24. Discussion for the Kol dam JP Industries Ltd. 0.2025. Site specific earthquake parameters North
Karanpura site, BiharNTPC, NewDelhi
4.00
26. Site specific earthquake parametersDamme and Kameng site, ArunachalPradesh
NEEPCO, Assam 4.00
27. Site specific earthquake parameters ParbitiStage II dam site, Himachal Pradesh
NHPC, Faridabad 4.00
28. Site specific earthquake parametersMyntdue Leshka site, Meghalaya
Meghalaya StateElectricity Board,Shillong
4.00
29. Site specific earthquake parametersTalcher II Super Thermal Power Plantsite, Orissa
NTPC, NewDelhi
3.00
30. Geotechnical studies anf Groundfoundation for Talcher II Super ThermalPower Plant site, Orissa
NTPC, NewDelhi
1.50
31. Site specific earthquake parameters TeestaStage V dam site, Sikkim
NHPC, Faridabad 4.00
32. Updation of Site specific earthquakeparameters for Kol Dam site, H.P.
NTPC, NewDelhi
3.00
33. Site specific earthquake parameters Tuivaidam site, Meghalaya
NEEPCO, Assam 3.00
34. Site specific earthquake parameters MidVaitarna Dam, Maharashtra
Brihen MumbaiMahanagarPalika, Mumbai
4.00
35. Site specific earthquake parametersRehand power plant site,
NTPC, NewDelhi
3.00
36. Site specific earthquake parametersGhatghar dam, Maharashtra
TCE, Bombay 4.00
37. Site specific earthquake parameters NorthChennai power plant site, Tamilnadu
NTPC, NewDelhi
4.00
38. Seismological network around Tehriregion
THDC, Rishikesh 12.75
39. Seismic safety analysis of Tailing Dam atJadugoda, Uranium Corporation of India
UraniumCorporation of
11.50
Ltd., Bihar India Ltd., Bihar40. Site specific earthquake parameters Sipat
power plant site, MPNTPC, NewDelhi
2.50
41. Site specific earthquake parameters forKalpong dam site in Andaman andNicobar
NHPC, NewDelhi
2.50
42. Site specific earthquake parameters forAuriya Thermal Power Plant, UttarPradesh
NTPC, NewDelhi
2.50
43. Site specific earthquake parameters forAnta Thermal Power Plant, Rajasthan.
NTPC, NewDelhi
2.50
44. Site specific earthquake parameters forKawas Thermal Power Plant, Gujarat
NTPC, NewDelhi
2.50
45. Site specific earthquake parameters LowerKopili HE Project, Assam , NE India
NEEPCO, Assam 2.50
46. Site specific earthquake parameters forShillong Water Supply
North EasternInvest Div.CWC, Silcher
2.50
47. Site specific earthquake parameters forTuirial dam project, Mizoram
NEEPCO, Assam 2.50
48. Site specific earthquake parameters forSimahdari 1000 MW coal based powerplant, Andhra Pradesh
NTPC, NewDelhi
2.00
49. Site specific earthquake parameters forrefinery site in Gujarat
ReliancePetroleum Ltd.,Bombay
2.00
50. Seismological network around Tehriregion
THDC, Rishikesh 10.50
51. Interpretation of tiltmeter data fromHarabagh
BBMB,Sundernagar
1.25
52. Site specific earthquake parameters forMahadayi Hydel Project, Goa
NEERI Nagpur 2.00
53. Site specific earthquake parameters forBhira site, Distt. Raigarh, Maharashtra
TCE, Bombay 1.20
54. Site specific earthquake parameters forEssar Refinery site, Kutch, Gujarat
ESSAR Oil Ltd.,Bombay
1.20
55. Site specific earthquake parameters for a NTPC New Delhi 1.20
combined gas based power plant project atFaridabad
56. Site specific earthquake parameters forbridge site on river Ravi near Bhasoli,Jammu & Kashmir
PWD, J&K 1.00
57. Site specific earthquake parameters for a250 MW steam power plant at Neyvelli(Tamilnadu)
ABB Ltd. , NewDelhi
1.00
58. Site specific earthquake parameters forJegurupadu combined cycle power plantsite (Andhra Pradesh)
ABB Ltd. , NewDelhi
0.80
59. Site specific earthquake parameters forRenuka Dam site (Himachal Pradesh),
HPEB ,Himachal,Pradesh
0.80
60. Acquisition and interpretation ofseismological data for Tehri dam project
IRI, Rishikesh 3.00
61. Microearthquake studies around Kakraparasite, Gujarat
NPC, Bombay 10.30
62. Review of design of earthquakeparameters and ground motion data forevaluation of structures of Narrow AtomicPower Plant (NAPP) in Uttar Pradesh.
NPC, Bombay 1.00
TOP
DETAILS OFREVIEW/RESEARCH/DESIGN/FEASIBILITYREPORTS TOP
The reports are kept in the library, Department ofEarthquake Engineering
1. EQ: 2002-14 (2002) Site specific earthquakeparameters for Kahalgaon site, Bihar,(Members : S. Basu, M. L. Sharma, J. P.Narayan, M. Srikhande and J. Das)
2. EQ: 2002-13 (2002) Site specific earthquakeparameters for Rani Avanti Bai Saagar Dam(Bargi) site, Madhya Pradesh (Members : S.Basu, M. L. Sharma, M. Srikhande and J.Das)
3. EQ: 2002-11 (2002) Microearthquakeinvestigations in Siang and Subansiri basins,Arunachal Pradesh, Phase I- Feasibility andback ground noise survey for Middle SiangHE project (Members : H. R. Wason and M.L. Sharma)
4. EQ: 2002-08 (2002) Site specific earthquakeparameters for Upper Subansiri HE ProjectAunachal Pradesh, (Members : BrijeshChandra, S. Basu and M. L. Sharma)
5. EQ: 2002-07 (2002), BLT-25-2001(III),“Seismological Network around TehriRegion” Preliminary Seismological Bulletin(from July. 2001 to September 2001)(Members: Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
6. EQ: 2002-06 (2002) Site specific earthquakeparameters for Teesta Stage IV HE ProjectWest Bengal, (Members : S. Basu and M. L.Sharma, J. P. Narayan and J. Das)
7. EQ: 2002-05 (2002) Site specific earthquakeparameters for Teesta Stage III HE ProjectWest Bengal,, (Members : S. Basu and M. L.Sharma J. P. Narayan and J. Das)
8. EQ: 2002-04 (2002) Site specific earthquakeparameters for Middle Subansiri HE ProjectAunachal Pradesh, (Members : BrijeshChandra, S. Basu and M. L. Sharma)
9. EQ: 2002-01 (2002) Site specific earthquakeparameters for Middle Siang projectAunachal Pradesh, (Members : BrijeshChandra, S. Basu and M. L. Sharma)
10. EQ: 2001-15 (2001), BLT-24-2001(II),“Seismological Network around TehriRegion” Preliminary Seismological Bulletin(from Apr. 2001 to June 2001) (Members:Ashwani Kumar, A. D. Pandey and M. L.Sharma)
11. EQ: 2001-14 (2001) Site specific earthquakeparameters for Subansiri lower HE ProjectAunachal Pradesh, (Members : BrijeshChandra, S. Basu and M. L. Sharma)
12. EQ: 2001-13(2001) Site specificearthquake design parameters for SuperThermal Power plant site, NorthKaranpura,Bihar (Members : Brijesh Chandra, S. Basu, M. L. Sharma and J. Das)
13. EQ: 2001-12 (2001), BLT-23-2001(I),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from Jan 2001 to Mar 2001)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
14. EQ: 2001-11 (2001) Site specificearthquake design parameters for Super
Thermal Power plant site, Barh, Bihar(Members : Brijesh Chandra, S. Basu, M. L.Sharma and J. Das)
15. EQ: 2001-09 Report on processing &interpretation of seismological data collectedfrom Jan. 2000 to Dec. 2000. (MembersAshwani Kumar, A. D. Pandey and M. L.Sharma)
16. EQ: 2001-07 (2001), BLT-22-2000(IV),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from Oct. 2000 to Dec. 2000)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
17. EQ: 2001-05 (2001), BLT-21-2000(III),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from July. 2000 to September2000) (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
18. EQ: 2001-04 (2001) BLT-20-2000(II),“Seismological Network around TehriRegion” Preliminary Seismological Bulletin(from Apr. 2000 to June 2000) (Members:Ashwani Kumar, A. D. Pandey and M. L.Sharma)
19. EQ: 2001-03(2001) Site specific earthquakedesign parameters for Parbati HE projectstate III Dam site, Kullu, Himachal Pradesh.(Members : Brijesh Chandra, S. Basu & M.L. Sharma)
20. EQ: 2001-02 (2001) Site specific earthquakeparameters for Metntdu Leshka Project,Meghlaya, (Members : Brijesh Chandra, S.Basu and M. L. Sharma)
21. EQ: 2001-01 (2001) Site specific earthquakeparameters for Kamneg and Damwe Project,Arunachal Pradesh, (Members : BrijeshChandra, S. Basu and M. L. Sharma)
22. EQ: 2000-20 (2000), Final Report onProcessing and Interpretation ofseismological data from January 1999 toDecember 1999 of the project“Seismological Network around Tehriregion”, Earthquake Engineering Studies ofDepartment of Earthquake Engineering,University of Roorkee, Roorkee (Members :Ashwani Kumar, A. D. Pandey and M. L.Sharma)
23. EQ: : 2000-19 (2000), BLT-19-2000(I),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from Jan. 2000 to March 2000)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
24. EQ : 2000-15 (2000), Precaution indesigning of power plant foundation andstructures of Talcher II Super ThermalPower Plant site, Orissa (Members : D. K.Paul, Brijesh Chandra, S. Basu S. Mukharjiand M. L. Sharma)
25. EQ : 2000-14 (2000) Updation of sitespecific earthquake parameters for Kol dam,Himachal Pradesh, (Members : BrijeshChandra, S. Basu and M. L. Sharma)
26. EQ : 2000-13 (2000) Site specificearthquake parameters for Parbati dam stageII , Himachal Pradesh, (Members : BrijeshChandra, S. Basu, M. L. Sharma and J. P.Narayan)
27. EQ : 2000-12 (2000) Site specificearthquake parameters for Teesta Stage V H.E. Project, Sikkim (Members : BrijeshChandra, S. Basu and M. L. Sharma)
28. EQ : 2000-11 (2000), Site specificearthquake parameters Talcher II SuperThermal Power Plant site, Orissa (Members :Brijesh Chandra, S. Basu and M. L.Sharma)
29. EQ : 2000-10 (2000), Site specificearthquake parameters for Tuivai Dam site,Meghalaya (Members : Brijesh Chandra, S.Basu and M. L. Sharma)
30. EQ : 2000-08 (2000), Site specificearthquake parameters for Rihand SuperThermal Power Plant, UP (Members :Brijesh Chandra, S. Basu and M. L.Sharma)
31. EQ : 2000-07 (2000), BLT-18-99(IV),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from October 1999 to December1999) (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
32. EQ : 2000-06 (2000), BLT-17-99(III),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from July 1999 to September 1999)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
33. EQ : 2000-05 (2000), BLT-16-99(II),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from April 1999 to June 1999)
(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
34. EQ : 2000-03 (2000), Site specificearthquake parameters for Ghatghar pumpedstorage scheme, Maharashtra (Members :Brijesh Chandra, S. Basu and M. L.Sharma)
35. EQ : 2000-02 (2000), BLT-15-99(I),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from Jan. 1999 to March 1999)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
36. EQ : 2000-01 (2000), Site specificearthquake parameters for North ChennaiThermal Power Plant site, Tamilnadu(Members : Brijesh Chandra, S. Basu andM. L. Sharma)
37. EQ : 99-13 (1999), Final Report onProcessing and Interpretation ofseismological data from January 1998 toDecember 1998 of the project“Seismological Network around Tehriregion”, Earthquake Engineering Studies ofDepartment of Earthquake Engineering,University of Roorkee, Roorkee (MembersAshwani Kumar, A. D. Pandey and M. L.Sharma)
38. EQ : 99-12 (1999), Site specific earthquakeparameters for Mid Vaitarana Dam Site,Maharashtra (Members : Brijesh Chandra,S. Basu and M. L. Sharma)
39. Seismological network in and around Tehriregion (Members Ashwani Kumar, A. D.
Pandey and M. L. Sharma) , THDCRishikesh (1999)
40. Final report (1999), Report on Modeling ofearthquake source and earth structure in theGearwheel Kaman Himalayan region usingbroad band seismic data, Submitted toDST.(Members : H. R. Wason, S. K.Upadhyay, M. L. Sharma, I. Sarkar and S.Mukhopadhaya)
41. EQ : 99-10 (1998), BLT-11-98(IV),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from October 1998 to December1998) (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
42. EQ : 99-07 (1999), Site specific earthquakeparameters for Sipat Super Thermal PowerPlant, Madhya Pradesh (Members : BrijeshChandra, S. Basu and M. L. Sharma)
43. EQ : 99-06 (1999), Site specific earthquakeparameters for Kalpong H. E. Project,Andaman and Nicobar (Members : BrijeshChandra, S. Basu and M. L. Sharma)
44. EQ : 99-05 (1999), BLT-13-98(III),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from July 1998 to September 1998)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
45. EQ : 99-03 (1999), BLT-12-98(II),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from April 1998 to June 1998)(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
46. EQ : 99-01 (1999), Site specific earthquakeparameters for Auriya II power Plantstructures, Uttar Pradesh (Members :Brijesh Chandra, S. Basu and M. L.Sharma)
47. EQ : 98-19 (1998), Site specific earthquakeparameters for Anta II power Plantstructures, Rajasthan (Members : BrijeshChandra, S. Basu and M. L. Sharma)
48. EQ : 98-17 (1998), Final Report onProcessing and Interpretation ofseismological data from January 1997 toDecember 1997 of the project“Seismological Network around Tehriregion”, Earthquake Engineering Studies ofDepartment of Earthquake Engineering,University of Roorkee, Roorkee (MembersAshwani Kumar, A. D. Pandey and M. L.Sharma)
49. EQ : 98-16 (1998), Site specific earthquakeparameters for Kawas II power Plantstructures, Gujarat (Members : BrijeshChandra, S. Basu and M. L. Sharma)
50. EQ : 98-15 (1998), BLT-11-98(I),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from January 1998 to March 1998),(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
51. EQ : 98-09 (1998), BLT-10-97(IV),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from October 1997 to December1997), (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
52. EQ : 98-06 (1998), Site specific earthquakeparameters Lower Kopili HE Project, NEIndia (Members : Brijesh Chandra, S. Basuand M. L. Sharma)
53. EQ : 98-05 (1998), Site specific earthquakeparameters for Shillong Water Supply,Meghalaya (Members : Brijesh Chandra,S. Basu and M. L. Sharma)
54. EQ : 98-01 (1998), BLT-9-97(III),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from July 1997 to September1997), (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
55. Design Basis report for the digitaltelemetered seismic array around NaroraAtomic Power Plant site, UP (MembersAshwani Kumar, A. D. Pandey and M. L.Sharma), NAPP/NPC Bombay (1998)
56. EQ : 97-16 (1997), BLT-8-97(II),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from April 1997 to June 1997),(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
57. EQ : 97-13 (1997), BLT-7-97(I),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin, (from January 1997 to March1997), (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
58. EQ : 97-11 (1997), Final Report onProcessing and Interpretation ofseismological data from January 1996 toDecember 1996 of the project
“Seismological Network around Tehriregion”, Earthquake Engineering Studies ofDepartment of Earthquake Engineering,University of Roorkee, Roorkee. (MembersAshwani Kumar, A. D. Pandey and M. L.Sharma)
59. EQ : 97-07 (1997), Site specific earthquakeparameters for Tuirial dam project, Mizoram(Members : Brijesh Chandra, S. Basu and M.L. Sharma)
60. EQ : 97-05 (1997), Site specific earthquakeparameters for Simahdari 1000 MW coalbased power plant, Andhra Pradesh(Members : Brijesh Chandra, S. Basu andM. L. Sharma)
61. EQ : 97-04 (1997), BLT-6-96(IV),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from October 1996 to December1996), (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
62. EQ : 97-03 (1997), Interpretation ofTiltmeter data from Harabagh undergroundvault across Shali thrust (Members P. N.Agrawal and M. L. Sharma)
63. EQ : 97-02 (1997), BLT-5-96(III),“Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from July 1996 to September1996), (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
64. EQ : 96-19 (1996), BLT-4-96(II),“Seismological Network around TehriRegion” -Preliminary Seismological Bulletin(from April 1996 to June 1996), (Members
Ashwani Kumar, A. D. Pandey and M. L.Sharma)
65. EQ : 96-12 (1996), BLT-3-96(I),“Seismological Network around TehriRegion” -Preliminary Seismological Bulletin(from January 1996 to March 1996),
66. EQ : 96-09 (1995), Site specific earthquakeparameters for refinery site in Gujarat(Members : Brijesh Chandra, S. Basu and M.L. Sharma)
67. EQ : 96-06 (1996), Final Report onProcessing and Interpretation ofseismological data from January 1995 toDecember 1995 of the project“Seismological Network around Tehriregion”, Earthquake Engineering Studies ofDepartment of Earthquake Engineering,University of Roorkee, Roorkee. (MembersAshwani Kumar, A. D. Pandey and M. L.Sharma)
68. EQ : 96-04 (1996), BLT-2-95(II),Seismological Network around TehriRegion” -Preliminary Seismological Bulletin(from October 1995 to December 1995),(Members Ashwani Kumar, A. D. Pandeyand M. L. Sharma)
69. EQ : 96-02 (1996), Site specific earthquakeparameters for Mahadayi Hydel Project, Goa(Members : A. R. Chandrasekaran and M.L. Sharma)
70. EQ : 96-01 (1996), BLT-1-95(I),Seismological Network around TehriRegion” - Preliminary SeismologicalBulletin (from July 1995 to September
1995), (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
71. EQ : 95-23 (1995), Site specific earthquakeparameters for Bhira site, Distt. Raigarh,Maharashtra (Members : A. R.Chandrasekaran and M. L. Sharma)
72. EQ : 95-20 (1995), Site specific earthquakeparameters for Essar Refinery site, Kutch,Gujarat (Members : A. R. Chandrasekaranand M. L. Sharma)
73. EQ : 95-19 (1995), Final Report on theproject “Digital Telemetered Seismic Arrayin Ganga Yamuna Valley for Monitoring ofLocal Seismicity”, Earthquake EngineeringStudies of Department of EarthquakeEngineering, University of Roorkee,Roorkee. (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma)
74. EQ : 95-17 (1995), Site specific earthquakeparameters for a combined gas based powerplant project at Faridabad (Members : A. R.Chandrasekaran and M. L. Sharma)
75. EQ : 95-15 (1995), Site specific earthquakeparameters for bridge site on river Ravi nearBhasoli, Jammu & Kashmir, (Members : A.R. Chandrasekaran and M. L. Sharma)
76. EQ : 95-14 (1995), Site specific earthquakeparameters for a 250 MW steam power plantat Neyvelli (Tamilnadu) (Members : A. R.Chandrasekaran and M. L. Sharma)
77. EQ : 95-10 (1995), Report on theseismological data from April 93-March 94obtained at observatories in Ganga YamunaValley, Vol. XIV, Department of
Earthquake Engineering, Roorkee (Members: R. C. Agrawal and M. L. Sharma)
78. EQ : 95-02 (1995) Station seismologicalbulletin for Tehri and NarendranagarObservatory for the period April 93 to March94, Department of Earthquake Engineering,Roorkee (Members R. C. Agrawal, and M.L. Sharma)
79. Seismological network in and around Tehriregion (Members Ashwani Kumar, A. D.Pandey and M. L. Sharma) , THDCRishikesh (1995)
80. EQ : 94-10 (1994), Site specific earthquakeparameters for Renuka Dam site (HimachalPradesh), Department of EarthquakeEngineering, Roorkee (Members : P. N.Agrawal, A. R. Chandrasekaran, B. C.Mathur and M. L. Sharma)
81. EQ : 94-08 (1994), Site specific earthquakeparameters for Jegurupadu combined cyclepower plant site (Andhra Pradesh),Department of Earthquake Engineering,Roorkee (Members : A. R. Chandrasekaranand M. L. Sharma)
82. EQ : 94-07 (1994) Station seismologicalbulletin for Tehri and NarendranagarObservatory for the period April 92 to March93, Department of Earthquake Engineering,Roorkee (Members R. C. Agrawal, and M.L. Sharma)
83. EQ : 94-06 (1994), Report on theseismological data from April 92-March 93obtained at observatories in Ganga YamunaValley, Vol. XIII, Department of
Earthquake Engineering, Roorkee (Members: R. C. Agrawal and M. L. Sharma)
84. Status report (1994), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members AshwaniKumar, A. D. Pandey and M. L. Sharma)
85. EQ : 93-21 (1993), Report on theseismological data from April 90-March 92obtained at observatories in Ganga YamunaValley, Vol. XII, Department of EarthquakeEngineering, Roorkee (Members R. C.Agrawal, and M. L. Sharma)
86. EQ : 93-19 (1993) Station seismologicalbulletin for Tehri and NarendranagarObservatory for the period April 90 to March91, Department of Earthquake Engineering,Roorkee (Members R. C. Agrawal, and M.L. Sharma)
87. Status report (1993), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members AshwaniKumar, A. D. Pandey and M. L. Sharma)
88. Monitoring of microearthquake activityaround Tehri region using telemeteredseismic array (Members Ashwani Kumar, A.D. Pandey and M. L. Sharma) , DST, NewDelhi (1992)
89. Final report (1992), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members L. S.Srivastava, and M. L. Sharma)
90. Status report (1991), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members L. S.Srivastava, and M. L. Sharma)
91. EQ : 90-03 (1990), Data management andsoftware for short aperture Telemetereddigital seismic array in Ganga Yamunavalley, Department of EarthquakeEngineering, Roorkee (M. L. Sharma)
92. Status report (1990), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members L. S.Srivastava, and M. L. Sharma)
93. Status report (1989), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members : L. S.Srivastava, H. R. Wason, Kirat Pal andM. L. Sharma)
94. EQ : 88-03 (1988), Report on review ofdesign of earthquake parameters and groundmotion data for evaluation of structures ofNarora Atomic Power Plant site (Members :L.S. Srivastava, B. C. Mathur, S. Basu, A. R.Chandrasekaran, A. Sinhval and M. L.Sharma)
95. Status report (1988), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST (Members : L. S.Srivastava, H. R. Wason, Kirat Pal andM. L. Sharma)
96. Status report (1987), Deployment of ShortAperture Digital Telemetered SampleSeismic Array in Ganga-Yamuna Valley,submitted to the DST, (Members : L. S.Srivastava, H. R. Wason, Kirat Pal and M.L. Sharma)
97. Status report (1986), Short ApertureTelemetered Digital Seismic Array in GangaYamuna Valley (Members: L. S. Srivastava,H. R. Wason and M. L. Sharma) , DST,New Delhi
98. EQ : 86-12 (1986), Status report on Shortaperture telemetered sample seismic array inGanga Yamuna Valley, Department ofEarthquake Engineering, Roorkee,(Members : L. S. Srivastava, H. R.Wason, Kirat Pal and M. L. Sharma)
TOP