Download - Moderator: Hydropower Business Opportunities
Hydropower Business Opportunities
Moderator: Col. Don Degidio, USA (Ret.), Global Engineering SolutionsSpeaker: • Col. Aaron Dorf, P.E., USA, Deputy Commander, USACE Northwestern
Division
U.S. ARMY CORPS OF ENGINEERSHYDROPOWER BUSINESS OPPORTUNITIES
2021 SAME SMALL BUSINESS CONFERENCE COL Aaron DorfDeputy CommanderNorthwestern Division (NWD) November 19, 2021
File Name
McNary Powerhouse, New Spare GSU Transformer, Washington
2
National Hydropower Capacity: 101,200 MW (reference: EIA)– Federal Capacity: 40,700 MW = 40%
• USACE Capacity: 20,600 MW = 20%• Bureau of Reclamation Capacity: 14,800 MW = 15%• TVA Capacity: 5,400 MW = 5%
– Non-Federal Capacity: 60,500 MW = 60%
NATIONAL HYDROPOWER
Non-Federal60,500 MW
USACE Capacity
20,600 MW
Reclamation + TVA Capacity
20,100 MW
National Hydropower Capacity101,200 MW
3
HYDROPOWER WORK
Types of Equipment:– Turbines– Generators– Exciters– Governors– Transformers– Medium voltage equip.– Switchgear– Batteries & DC systems– Controls– Cranes
Turbine Runner – John H. Kerr Powerplant, VA
4
Scope: Increase load rating of Intake Deck Crane Rail Beams
Increase load rating of existing beams that span open areas on the Intake Deck
Repair current cracks, add reinforcing bar and concrete, to correct existing deficiency and support the required working loads for the Intake Crane
Requires modification of 44 beams
This project is currently in construction
MCNARY INTAKE DECK CRANE: UPRATE BEAM RAILS
Install Work Scaffold Install Work Scaffold Beam Prep Anchor Holes
Reinforcing Bars Installed
5
HYDROPOWER UPGRADES
Types of Work– Replace– Upgrade– Rehabilitate
Contract Types– Service– Supply– Construction
Acquisition Strategies– Design-Build– Design-Bid-Build– Task Order: SATOC/MATOC– Hybrid: Supply with/
Construction Installation
Denison, TX Fort Randall, SD
New Orleans, LA
6
USACE is developing long term capital asset plans
– The USACE-wide Hydropower Modernization Initiative (HMI) is creating a coordinated long-term asset strategy that:• Provides greatest economic benefit in its capital decision-making • Controls USACE’s asset risk exposure
– System Asset Plan (vs HMI) for Federal Columbia River Power System (20 years, includes Portland, Walla Walla & Seattle Districts)
– Omaha Hydropower Master Plan (20 years)
HYDROPOWER STRATEGIC PLANNING
7
COMMON HYDROPOWER NAICS CODES
237990 - Other Heavy And Civil Engineering Construction
238210 - Electrical Contractors & Other Wiring Installation Contractors
333611 - Turbine & Turbine Generator Set Units Manufacture
333923 - Overhead Traveling Crane, Hoist & Monorails System Manufacturing
335311 - Power, Distribution & Specialty Transformer Manufacturing
335312 - Motor & Generator Manufacturing
541330 - Engineering Services
541330 - Hazardous Waste Treatment & Disposal
https://sam.gov/content/home
8
USACE HYDROPOWER OPPORTUNITIES (HISTORICAL)
Small Business prime contracts:– Transformers (Supply)– Rehab – Cranes & Governors (Construction and Services)– Rehab Intake Gates, Bulkhead, Penstock Repair, Switchgear
Small Business set asides for hydropower requirements:– Motor Control Center – Supply & Installation– Cavitation Repair – Wicket Gates– Roof Repair – PowerHouse– Switchyard Modifications
Small Business Subcontracting opportunities– Painting– Asbestos Removal– Transportation– Shotcrete (Draft Tubes)
FY21 USACESmall Business Awards Totaled $7.7B (41%)
Bridge Crane Installation - Fort Randall, SD
9
HYDROPOWER FY22 – FY27 (CONUS)
10FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISION (BOOTH 1038)
FY22 focus is to maximize Small Business, particularly, Women Owned (WOSB), Hubzone and Veteran (SDVOSB) opportunities in NWD hydropower projects as prime contractors and as subcontractors where actions cannot be set-aside for small business.
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
2.6 Billion 47.4% $1.2 BillionIce Harbor RunnerWalla Walla District
Fort Randall PowerhouseOmaha District
Stockton DamKansas City District
https://www.nwd.usace.army.mil/Business-With-Us/
11FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISION (BOOTH 1038)Location Project Release
Date NAICS Range SBSA SolicitationType
Willamette Valley Big Cliff Dam, OR NWP
Trash rack & Intake Gate 2022 332312 Total SBSA TBD
Willamette Valley Foster Dam, OR NWP
Turbine & Gen Rehab 2023 237990 TBD UNR BVTO
John Day Dam, OR NWP Power Plant HVAC Upgrades 2022 332312 $10-25M TBD TBD
The Dalles Dam, OR NWP Power Plant Ice + Trash Sluiceway Spray Control 2021 $500K-$1M SB TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant 480V - SU1-4 2021 $1-5M TBD TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant SQ 4&5, SU 17-27 Replacement (units 17-27 480V)
2022 $5-10M TBD TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant Unit 1-16 Generator Rewind 2022 $100-250M TBD TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant Upgrade for Station Service Units SS01 & SS02
2022 $10-25M TBD TBD
Libby Dam, MT NWS Power Plant DC Boards & Bkrs Sys 1 & 2 2021 $1-5M TBD TBD
Ice Harbor Dam Burbank, WA NWW
Power Plant PH SER Annunciation & SC SCC Upgrades
2021 $5-10M TBD TBD
Ice Harbor Dam Burbank, WA NWW
Power Plant Intake Gate Hydraulic System Upgrades
2022 237990 $10-25M TBD TBD
Little Goose Dam Starbuck, WA NWW
Power Plant PH Roof Replacement 2021 $1-5M TBD TBD
12FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISION (BOOTH 1611)
FY22 focus is to increase the Small Business industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities for Small Business.
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
$1.7 Billion 44.0% $751 Million
Whitney Powerhouse
Table Rock Powerhouse
https://www.swd.usace.army.mil/Business-With-Us/
13FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISION (BOOTH 1611)Location Project Release
Date NAICS Range SBSA SolicitationType
Ozark, AR Runout Indicating Equipment Replacement
2021 TBD $500K-$1M TBD Lowest Priced Tech Acceptable (LTPA)
Table Rock Branson, MO Raw Water System Replacement 2022–24 TBD $1-5M TBD LTPA
Table Rock Branson, MO Draft Tube Gantry Crane Replacement 2021 TBD $1-5M TBD BVTO
Table Rock Branson, MO Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO
Greers Ferry, AR Powerplant Transformer Refurbishment 2021 TBD $500K-$1M TBD BVTO
Greers Ferry, AR Bridge Crane Replacement 2023 TBD $1-10M TBD BVTO
Greers Ferry, AR Powerhouse Generator Rewind 2023 TBD $10-25M TBD BVTO
Dardanelle, AR Turbine Cavitation Repairs 2023 TBD $5-25M TBD BVTO
Dardanelle, AR Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO
Sam Rayburn Jasper, TX
2 Kaplan Runner Repl, 180” D, 41,300 HP, 70’ Head, 85.7 RPM2 Rewinds, 31.5MVA
2025 333611 $25-100M TBD TBD
Sam Rayburn Jasper, TX SCADA System Installation 2022 238210 $1-5M TBD TBD
Sam Rayburn Jasper, TX Excitation Refurbishment/ Replacement 2022 238210 $1-5M TBD TBD
RS Kerr Sallisaw, OK Replace Intake Crane 2021 TBD $1-5M TBD TBD
Eufaula, OK Draft Tube Crane Replacement Ph II 2021 TBD $1-5M TBD TBD
14FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER (BOOTH 438)
FY22 focus is to heighten awareness of subcontracting opportunities through our Business Opportunities Open Houses , Industry Days, and various outreach events; as well as increase relationships with SBA Commercial Market Representatives. We will also focus on improving historic deficiencies in the SDVOSB and WOSB assigned targets.
Barkley Dam
St. Marys Falls Canal Hydroelectric Plant
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
$2.4 Billion 27.5% $673 Million
https://www.lrd.usace.army.mil/Business-With-Us/
15FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER DIVISION (BOOTH 438)Location Project Release
Date NAICS Range SBSA SolicitationType
Old Hickory, Hendersonville, TN
Turbine & Generator Rehab - 4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil
2022 333611 $25-100M Unrestricted TBD
Wolf Creek, Jamestown, KY DC/Preferred AC Systems Rehab 2022 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
Wolf Creek, Jamestown, KY Powerhouse Overhead Crane Refurbish
2023 335999 $1-5M Unrestricted Best Value Trade Off (BVTO)
Wolf Creek, Jamestown, KY Medium Voltage Cables 2024 335311 $5-10M Unrestricted Best Value Trade Off (BVTO)
Wolf Creek, Jamestown, KY Turbine and Generator Rehab - 6 Francis Runner Replacement (Potential Uprate):175” D, 160’ Head, 105.9 RPM6 Rewinds, Multi-turn Coil
2024 333611 $100-250M Unrestricted Best Value Trade Off (BVTO)
Cheatham, Charlotte, TN Intake Gantry Crane Replacement 2025 335311 $5-10M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
16FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION (BOOTH 539)
FY22 focus is to increase the industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities.
FY21Small Business Eligible $
SB %FY21 Small Business
Obligated $
$1.6 Billion 67.8% $1.1 Billion
Blakely Mountain Dam
Clarence Cannon Dam
https://www.mvd.usace.army.mil/Business-With-Us/
17FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION (BOOTH 539)
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
DeGray Dam Arkadelphia, AR
Power Plant Unit 2 Cavitation Repair 2021 333611 $250-500K TBD TBD
DeGray DamArkadelphia, AR
Power Plant Intake Cylinder Gate and Gate Hoist Repair and Upgrade
2022 237990 $500K-$1M TBD TBD
Narrows DamMurfreesboro, AR
Power Plant Trash Rack Vertical Gate Guide Replacement
2021 237990 $500K-$1M TBD TBD
Blakely Mtn DamMountain Pine, AR
Power Plant Unit 2 Raw Water System Replacement
2021 237990 $250-500K TBD TBD
DeGray DamArkadelphia, AR
Power Plant MOD and OCB Air Circuit Switches Replacement
2021 238210 $100-250K TBD TBD
Narrows DamMurfreesboro, AR
Power Plant Air Circuit Switches Replacement
2021 238210 $100-250K TBD TBD
Narrows DamMurfreesboro, AR
Power Plant Unit and Line Relay Replacement
2021 238210 $100-250K TBD TBD
18FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION (BOOTH 1409)
FY22 focus is identifying HUBZone, Service-Disabled Veteran Owned and Women Owned small business firms to satisfy our requirements as we continue to build the small business bench with capable firms.
J. Strom Thurmond Powerhouse
Millers Ferry Powerhouse Buford Powerhouse
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
$2.8 Billion 40.2% $1.1 Billion
https://www.sad.usace.army.mil/Business-With-Us/
19FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION (BOOTH 1409)
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
Hartwell Powerhouse Transformer Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Bridge Crane Rehab 2026 333923 $1-5M TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Draft Tube Crane Replacement 2024 333923 $1-5M TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Motor Control Center Replacement 2025 335311 $1-5M TBD B Value/ Open Competition
Richard B. Russell & J. Strom Thurmond Powerhouse
Generator Circuit Breaker Overhaul 2024 335311 $100-250K TBD B Value/ Open Competition
J. Strom Thurmond Powerhouse
Trash Rack Rehab (Units 1-7) 2024 333999 $250-500K TBD B Value/ Open Competition
J. Strom Thurmond Powerhouse
Penstock Coating Rehab 2022 237990 $250-500K TBD B Value/ Open Competition
J. Strom Thurmond Powerhouse
Station Service Feeder Replacement 2025 238210 $100-250K TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Dissolved Oxygen System Diffuser Replacement 2022 237990 $500K-$1M TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Replace Powerhouse Roof Covering 2021 237990 $1-5M TBD B Value/ Open Competition
20
QUESTIONS ?US Army Corps of Engineers Northwestern Division
21
NORTHWESTERN DIVISION ONLINE
Internet: www.nwd.usace.army.mil
22
The Hydropower Environment Next 30-50 years
CONTACTS FOR FURTHER INFORMATION REGARDING HYDROPOWER WORK AT EACH DIVISION/DISTRICT
Great Lakes and Ohio River Division (LRD) BOOTH 438– Nashville: Susan Nicholson [email protected] Mississippi Valley Division (MVD) BOOTH 539– Vicksburg: Demetric Erwin - [email protected] Northwestern Division (NWD) BOOTH 1038– Kansas City (NWK): Arthur Saulsberry - [email protected] – Omaha (NWO): Daniel Curado - [email protected] – Portland (NWP): Carol McIntyre - [email protected] – Seattle (NWS): John Solomon - [email protected] – Walla Walla (NWW): James Glynn - [email protected] – Hydroelectric Design Center (NWP): Carol McIntyre - [email protected] South Atlantic Division (SAD) BOOTH 1409– Charleston: Wayne Hiatt - [email protected] – Mobile: Linda Spadaro - [email protected] – Savannah: Jennifer Cavanagh – [email protected] – Wilmington: Jason Dalton – [email protected] Southwestern Division (SWD) BOOTH 1611– Little Rock: Lakisha Vance – [email protected]– Fort Worth: Carolyn Staten - [email protected] – Tulsa: Gene Snyman - [email protected]
23FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER (BOOTH 438)
FY22 focus is to heighten awareness of subcontracting opportunities through our Business Opportunities Open Houses , Industry Days, and various outreach events; as well as increase relationships with SBA Commercial Market Representatives. We will also focus on improving historic deficiencies in the SDVOSB and WOSB assigned targets.
Barkley Dam
St. Marys Falls Canal Hydroelectric Plant
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
$2.4 Billion 27.5% $673 Million
https://www.lrd.usace.army.mil/Business-With-Us/
24FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
St. Marys Falls Canal, Sault Ste. Marie, MI
Hydroelectric Plant Replace Medium Voltage Circuit Breaker
2020- 22 335311 $1-5M Set-Aside TBD
St. Marys Falls Canal, Sault Ste. Marie, MI
Hydroelectric Plant Replace rails for an overhead bridge crane
2020 333923 $500K-$1M TBD TBD
St. Marys Falls Canal, Sault Ste. Marie, MI
Hydroelectric Plant Repair / refurbish an overhead bridge crane
2021 333923 $500K-$1M TBD TBD
St. Marys Falls Canal, Sault Ste. Marie, MI
Hydroelectric Plant Replace potable water system
2021 237990 $500K-$1M TBD TBD
Center Hill Lancaster, TN Medium Voltage Cables 2021 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
Cheatham Charlotte, TN Medium Voltage Cables 2021 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
Old Hickory, Hendersonville, TN
Switchyard Control Cable and Conduit Replacement
2021 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
Wolf Creek, Jamestown, KY
Main Power Transformer Replacement (Supply and Install)
2021 335311 $10-25M Unrestricted Best Value Trade Off (BVTO)
Old Hickory, Hendersonville, TN
Main Power Transformer Install - Includes relocation from existing transformer yard to the north side of the switchyard in the empty bay.
2022 335311 $1-5M Unrestricted Best Value Trade Off (BVTO)
25FY22 HYDROPOWER OPPORTUNITIESGREAT LAKES & OHIO RIVER DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Old Hickory, Hendersonville, TN
Turbine & Generator Rehab - 4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil4 Kaplan Runner Replacement (Potential Uprate):264” D, 35,000 HP, 45’ Head, 75 RPM3 Rewinds, 36MVA, Multi-turn Coil
2022 333611 $25-100M Unrestricted TBD
Wolf Creek, Jamestown, KY DC/Preferred AC Systems Rehab 2022 335999 $1-5M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
Wolf Creek, Jamestown, KY Powerhouse Overhead Crane Refurbish 2023 335999 $1-5M Unrestricted Best Value Trade Off (BVTO)
Wolf Creek, Jamestown, KY Medium Voltage Cables 2024 335311 $5-10M Unrestricted Best Value Trade Off (BVTO)
Wolf Creek, Jamestown, KY Turbine and Generator Rehab - 6 Francis Runner Replacement (Potential Uprate):175” D, 160’ Head, 105.9 RPM6 Rewinds, Multi-turn Coil
2024 333611 $100-250M Unrestricted Best Value Trade Off (BVTO)
Cheatham, Charlotte, TN Intake Gantry Crane Replacement 2025 335311 $5-10M Unrestricted Invitation for Bid w/ Definitive Responsibility Criteria (DRC)
26FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION (BOOTH 539)
FY22 focus is to increase the industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities.
FY21Small Business Eligible $
SB %FY21 Small Business
Obligated $
$1.6 Billion 67.8% $1.1 Billion
Blakely Mountain Dam
Clarence Cannon Dam
https://www.mvd.usace.army.mil/Business-With-Us/
27FY22 HYDROPOWER OPPORTUNITIESMISSISSIPPI VALLEY DIVISION
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
DeGray Dam Arkadelphia, AR
Power Plant Unit 2 Cavitation Repair 2021 333611 $250-500K TBD TBD
DeGray DamArkadelphia, AR
Power Plant Intake Cylinder Gate and Gate Hoist Repair and Upgrade
2022 237990 $500K-$1M TBD TBD
Narrows DamMurfreesboro, AR
Power Plant Trash Rack Vertical Gate Guide Replacement
2021 237990 $500K-$1M TBD TBD
Blakely Mtn DamMountain Pine, AR
Power Plant Unit 2 Raw Water System Replacement
2021 237990 $250-500K TBD TBD
DeGray DamArkadelphia, AR
Power Plant MOD and OCB Air Circuit Switches Replacement
2021 238210 $100-250K TBD TBD
Narrows DamMurfreesboro, AR
Power Plant Air Circuit Switches Replacement
2021 238210 $100-250K TBD TBD
Narrows DamMurfreesboro, AR
Power Plant Unit and Line Relay Replacement
2021 238210 $100-250K TBD TBD
28FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISION (BOOTH 1038)
FY22 focus is to maximize Small Business, particularly, Women Owned (WOSB), Hubzone and Veteran (SDVOSB) opportunities in NWD hydropower projects as prime contractors and as subcontractors where actions cannot be set-aside for small business.
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
2.6 Billion 47.4% $1.2 BillionIce Harbor RunnerWalla Walla District
Fort Randall PowerhouseOmaha District
Stockton DamKansas City District
https://www.nwd.usace.army.mil/Business-With-Us/
29FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Bid BendChamberlain, SD NWO
Power Plant Depressing Air/Station Service Air System Rehab
2022 237990 $1-5M TBD Full & Open, BVTO
Garrison Dam Riverdale, ND NWO
Powerhouse Roof Replacement 2022 238160 $1-5M TBD Full & Open, BVTO
Fort Peck Dam Glasgow, MT NWO
Butterfly Valve Rehabilitation 2022 237990 $1-5M TBD Full & Open, BVTO
Fort Peck Dam Glasgow, MT NWO
Outside Station Service Transformer Installation 2022 237990 $5-10M UNR Full & Open, BVTO
Fort Peck Dam Glasgow, MT NWO
Draft Tube Stoplog Replacement 2022 237990 $1-5M TBD Full & Open, BVTO
Fort Randall DamPickstown, SD NWO
Raw Water Strainer Replacement 2022 238290 $1-5M SB Full & Open, BVTO
Oahe Dam Pierre, SD NWO
Powerhouse Roof Replacement 2022 238160 $1-5M TBD Full & Open, BVTO
Oahe Dam Pierre, SD NWO
Autotransformer and Transfer Bay Replay Replacement
2022 237990 $1-5M TBD Full & Open, BVTO
Oahe Dam Pierre, SD NWO
Switchyard Disconnect Switch Replacement 2022 238220 $1-5M TBD Full & Open, BVTO
Gavins Point Yankton, SD NWO
Power Plant Replace Generator Coolers & Raw Water Piping
2022 238220 $5-10M UNR Full & Open, BVTO
Gavins Point Yankton, SD NWO
Supply / Rehab Intake & Tailrace Gates 2021 237990 $5-10M UNR Full & Open, BVTO
30FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Bonneville, OR NWP Power Plant 1 Headgate Repair Pit Rehabilitation 2022 237990 $1-5M Total SBSA TBD
Bonneville, OR NWP Power Plant 1 Preferred AC/DC Improvement 2022 237990 $5-10M Total SBSA TBD
Bonneville, OR NWP Power Plant 1 Digital Governors 2022 237990 $5-10M UNR BVTO
Bonneville, OR NWP Power Plant 2 Bradford Island Service Building PRQ Switchgear Upgrade
2022 238210 $1-5M Total SBSA BVTO
Bonneville, OR NWP Bonneville – Powerhouse 2, 65-Ton Tailrace Gantry Crane Replacement
2022 333923 Total SBSA BVTO
John Day Dam, OR NWP Power Plant HVAC Upgrades 2022 238210 $5-$10M Total SBSA BVTO
John Day Dam, OR NWP Exciter Replacement 16 Units, under investigation 2023 335311 TBD TBD TBD
John Day Dam, OR NWP Turbine Replacement and Generator Rewind 2023 237990 Over $500M UNR BVTO
The Dalles Dam, OR NWP Control Room Modernization 2023 238210 TBD TBD BVTO
The Dalles Dam, OR NWP Exciter Control 21 Units, under investigation 2023 335311 TBD TBD
Willamette ValleyDetroit Dam, OR NWP
Intake Gates 2022 237990 $1-5M Total SBSA TBD
Willamette ValleyDetroit Dam, OR NWP
Transformers 2022 335311 TBD TBD
Willamette ValleyDetroit Dam, OR NWP
Trashrack and Intake Gate 2022 332312 Total SBSA BVTO
Willamette ValleyDetroit Dam, OR NWP
Transformer Install 2022 237990 TBD Total SBSA TBD
31FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
John Day Dam, OR NWP Turbine Replacement and Generator Rewind 2023 237990 Over $500M UNR BVTO
The Dalles Dam, OR NWP Control Room Modernization 2023 238210 TBD TBD BVTO
The Dalles Dam, OR NWP Exciter Control 21 Units, under investigation 2023 335311 TBD TBD
Willamette ValleyDetroit Dam, OR NWP
Intake Gates 2022 237990 $1-5M Total SBSA TBD
Willamette Valley Detroit Dam, OR NWP
Transformers 2022 335311 TBD TBD
Willamette Valley Detroit Dam, OR NWP
Trashrack and Intake Gate 2022 332312 Total SBSA BVTO
Willamette Valley Detroit Dam, OR NWP
Transformer Install 2022 237990 TBD Total SBSA TBD
Willamette Valley Cougar Dam, OR NWP
Main Unit Breakers & Electrical Reliability Upgrades 2022 238210 $1-5M UNR BVTO
Willamette Valley Foster Dam, OR NWP
Powerhouse and Transformer Oil Water Separator 2022 237990 $1-5M Total SBSA TBD
Willamette Valley Green Peter Dam, OR NWP
Main Unit Breakers and Electrical Reliability Upgrades
2022 238210 $10-25M UNR BVTO
Willamette Valley Green Peter Dam, OR NWP
Bridge Crane 2022 333923 TBD BVTO
Willamette Valley Hills Creek Dam, OR NWP
Main Unit Breakers & Electrical Reliability Upgrades 2022 238210 $5-10M UNR BVTO
32FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Willamette Valley Big Cliff Dam, OR NWP
Trash rack & Intake Gate 2022 332312 Total SBSA TBD
Willamette Valley Foster Dam, OR NWP
Turbine & Gen Rehab 2023 237990 TBD UNR BVTO
John Day Dam, OR NWP Power Plant HVAC Upgrades 2022 332312 $10-25M TBD TBD
The Dalles Dam, OR NWP Power Plant Ice + Trash Sluiceway Spray Control 2021 $500K-$1M SB TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant 480V - SU1-4 2021 $1-5M TBD TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant SQ 4&5, SU 17-27 Replacement (units 17-27 480V)
2022 $5-10M TBD TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant Unit 1-16 Generator Rewind 2022 $100-250M TBD TBD
Chief Joseph Dam Bridgeport, WA NWS
Power Plant Upgrade for Station Service Units SS01 & SS02
2022 $10-25M TBD TBD
Libby Dam, MT NWS Power Plant DC Boards & Bkrs Sys 1 & 2 2021 $1-5M TBD TBD
Ice Harbor Dam Burbank, WA NWW
Power Plant PH SER Annunciation & SC SCC Upgrades
2021 $5-10M TBD TBD
Ice Harbor Dam Burbank, WA NWW
Power Plant Intake Gate Hydraulic System Upgrades
2022 237990 $10-25M TBD TBD
Little Goose Dam Starbuck, WA NWW
Power Plant PH Roof Replacement 2021 $1-5M TBD TBD
33FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Little Goose Dam Starbuck, WA NWW
Power Plant Headgate Repair Pit Upgrade 2021 $1-5M TBD TBD
Little Goose Dam Starbuck, WA NWW
Power Plant DC System and LV Switchgear Upgrade
2022 238210 $10-25M TBD TBD
Little Goose Dam Starbuck, WA NWW
Power Plant Trashrake Crane & Rake Upgrade 2021 $5-10M TBD TBD
Little Goose Dam Starbuck, WA NWW
Power Plant MU 4-6 Wicket Gate Locks 2021 $500K-$1M TBD TBD
Lower Granite Dam Garfield Co., WA NWW
Power Plant Restore Lindsay Creek & 380 Drainage Lines
2021 $1-5M TBD TBD
Lower Granite Dam Garfield Co., WA NWW
Power Plant Turbine Maintenance Platform 2021 $500K-$1M TBD TBD
Lower Granite Dam Garfield Co., WA NWW
Power Plant Trashrake Crane & Rake Upgrade 2021 $5-10M TBD TBD
Lower Granite Dam Garfield Co., WA NWW
Power Plant MU 4-6 Wicket Gate Locks 2021 $500K-$1M TBD TBD
Lower Granite Dam Garfield Co., WA NWW
Power Plant MU2 Blade Sleeve Upgrade & Rehab 2021 $5-10M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant PH SER Annunciation & DG Ctrls Upgrade
2022 $5-10M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant Turbine Maintenance Platform 2021 $500K-$1M TBD TBD
34FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Lower Monumental Dam Kahlotus, WA NWW
Power Plant Headgate Repair Pit Upgrade 2021 $1-5M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant DC System & LV Switchgear Upgrade 2022 238210 $10-25M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant MU4 Scroll Case Repair & Water Stop 2021 $1-5M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant Trashrake Crane & Rake Upgrade 2021 $5-10M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant PH Bridge Crane Wheel & Drive System Upgrade
2021 $5-10M TBD TBD
Lower Monumental Dam Kahlotus, WA NWW
Power Plant Station Service Compressed Air System Upgrade
2021 $500K-$1M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Digital Governor Upgrade 2021 $10-25M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Exciters Upgrade 2021 $10-25M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Gov Mechanical Sys Rehab (McMod) 2021 $5-10M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant GSU T1-T7 Oil Leak Repair 2021 $1-5M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Iso-phase, HV Bus & Switch Upgrade McMod
2021 $25-100M TBD TBD
35FY22 HYDROPOWER OPPORTUNITIESNORTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
McNary Dam Umatilla, OR NWW
Power Plant Powerhouse Control System Upgrade 2021 $10-25M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Levee Drainage Pump Station Upgrades
2021 $10-25M TBD TBD
McNary Dam Umatilla, OR NWW
Spillway Gate Rehab and Gate Hoist Uprate 2021 $10-25M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Wastewater Upgrade - Connection to City of Umatilla
2021 $1-5M TBD TBD
McNary Dam Umatilla, OR NWW
Headgate Repair Pit Upgrade 2020 $1-5M TBD TBD
McNary Dam Umatilla, OR NWW
Headgate System Rehabilitation (McMod) 2021 $25-100M TBD TBD
McNary Dam Umatilla, OR NWW
Trash Rack Rehabilitation (McMod) 2021 $10-25M TBD TBD
McNary Dam Umatilla, OR NWW
Power Plant Station Service Turbine Rehab 2021 $5-10M TBD TBD
36FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION (BOOTH 1409)
FY22 focus is identifying HUBZone, Service-Disabled Veteran Owned and Women Owned small business firms to satisfy our requirements as we continue to build the small business bench with capable firms.
J. Strom Thurmond Powerhouse
Millers Ferry Powerhouse Buford Powerhouse
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
$2.8 Billion 40.2% $1.1 Billion
https://www.sad.usace.army.mil/Business-With-Us/
37FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
St Stephen Powerhouse Motor Control Center Replacement 2021 238210 $500K-$1M TBD B Value/ Open Competition
St Stephen Powerhouse Station Unwatering Sump Rehab 2021 238210 $500K-$1M TBD B Value/ Open Competition
Allatoona Powerhouse Turbine Replacement (Units 1-2) 2027 333611 $25-100M TBD B Value/ Open Competition
Carters Powerhouse Turbine Replacement (Units 1-4) 2026 333611 $25-100M TBD B Value/ Open Competition
Carters Powerhouse Generator Rewind (Units 1-2) 2025 335312 $10-25M TBD B Value/ Open Competition
Millers Ferry Powerhouse 15 kV Switchgear Installation (Units 1-3) 2021 238210 $1-5M TBD B Value/ Open Competition
Jones Bluff Powerhouse Turbine Replacement (Units 1-4) 2026 333611 $25-100M TBD B Value/ Open Competition
Millers Ferry Powerhouse Turbine Replacement (Units 1-3) 2027 333611 $10-25M TBD B Value/ Open Competition
Woodruff Powerhouse Excitation System Replacement (Units 1-3) 2023 335311 $10-25M TBD B Value/ Open Competition
West Point Powerhouse Turbine Replacement (Units 2-3) 2023 333611 $10-25M TBD B Value/ Open Competition
West Point Powerhouse Generator Rewind, Excitation System, Switchgear, & Transformer Replacement (Unit 1)
2023 335312 $1-5M TBD B Value/ Open Competition
Allatoona Powerhouse Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition
Buford Powerhouse Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition
Buford Powerhouse Generator Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition
Buford Powerhouse Powerhouse Controls Upgrade 2026 238210 $1-5M TBD MATOC
38FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
Buford Powerhouse Governor PLC Replacement 2026 238210 $250-500K TBD B Value/ Open Competition
Carters Powerhouse Generator Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition
Carters Powerhouse Powerhouse Controls Upgrade 2027 238210 $1-5M TBD MATOC
Jones Bluff Powerhouse Generator Fire Suppression Sys Replacement 2023 333999 $100-250K TBD B Value/ Open Competition
Jones Bluff Powerhouse Powerhouse Controls Upgrade 2026 238210 $1-5M TBD MATOC
Millers Ferry Powerhouse Powerhouse Controls Upgrade 2025 238210 $1-5M TBD MATOC
Jim Woodruff Powerhouse Powerhouse Controls Upgrade 2025 238210 $1-5M TBD MATOC
West Point Powerhouse Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition
West Point Powerhouse Powerhouse Controls Upgrade 2023 238210 $1-5M TBD MATOC
Walter F. George Powerhouse
Headgate Machinery and Controls Rehab 2024 238210 $500K-$1M TBD B Value/ Open Competition
Walter F. George Powerhouse
Powerhouse Controls Upgrade 2021 238210 $1-5M TBD MATOC
Walter F. George Powerhouse
Governor PLC Replacement 2022 238210 $250-500K TBD B Value/ Open Competition
Jim Woodruff Powerhouse Replace Powerhouse HVAC System 2021 237990 $1-5M TBD B Value/ Open Competition
Buford Powerhouse Replace Fisherman's Warning Horn System 2021 238210 $250-500K TBD B Value/ Open Competition
39FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
Hartwell Powerhouse Transformer Fire Suppression Sys Replacement 2023 333999 $250-500K TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Bridge Crane Rehab 2026 333923 $1-5M TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Draft Tube Crane Replacement 2024 333923 $1-5M TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Motor Control Center Replacement 2025 335311 $1-5M TBD B Value/ Open Competition
Richard B. Russell & J. Strom Thurmond Powerhouse
Generator Circuit Breaker Overhaul 2024 335311 $100-250K TBD B Value/ Open Competition
J. Strom Thurmond Powerhouse
Trash Rack Rehab (Units 1-7) 2024 333999 $250-500K TBD B Value/ Open Competition
J. Strom Thurmond Powerhouse
Penstock Coating Rehab 2022 237990 $250-500K TBD B Value/ Open Competition
J. Strom Thurmond Powerhouse
Station Service Feeder Replacement 2025 238210 $100-250K TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Dissolved Oxygen System Diffuser Replacement 2022 237990 $500K-$1M TBD B Value/ Open Competition
Richard B. Russell Powerhouse
Replace Powerhouse Roof Covering 2021 237990 $1-5M TBD B Value/ Open Competition
40FY22 HYDROPOWER OPPORTUNITIESSOUTH ATLANTIC DIVISION
Location Project ReleaseDate NAICS Range SBSA Solicitation
Type
Hartwell Powerhouse Powerhouse Controls Upgrade 2021 238210 $1-5M TBD MATOC
Richard B. Russell Powerhouse
Powerhouse Controls Upgrade 2022 238210 $1-5M TBD MATOC
J. Strom Thurmond Powerhouse
Powerhouse Controls Upgrade 2024 238210 $1-5M TBD MATOC
Island Creek Pump Station Transformer Replacement 2022 335311 $250-500K TBD B Value/ Open Competition
Philpott Powerhouse Turbine Replacement & Generator Rewind (Units 1-2)
2020 333611 $10-25M TBD B Value/ Open Competition
John H. Kerr Powerhouse Powerhouse Controls Upgrade 2022 238210 $1-5M TBD MATOC
Philpott Powerhouse Powerhouse Controls Upgrade 2023 238210 $1-5M TBD MATOC
Jones Bluff Powerhouse 15kV Switchgear Installation (Units 1-4) 2019 238210 $500K-$1M B Value/ Open Competition
Hartwell Powerhouse Generator Rewind (Units 3-4) 2020 335312 $10-25M B Value/ Open Competition
41FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISION (BOOTH 1611)
FY22 focus is to increase the Small Business industrial base at each District, especially for Service-Disabled Veteran Owned Small Businesses, Women Owned Small Businesses and to increase Subcontracting Opportunities for Small Business.
FY21 Small Business Eligible $
SB %FY21 Small Business
Obligated $
$1.7 Billion 44.0% $751 Million
Whitney Powerhouse
Table Rock Powerhouse
https://www.swd.usace.army.mil/Business-With-Us/
42FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Ozark, AR Runout Indicating Equipment Replacement
2021 TBD $500K-$1M TBD Lowest Priced Tech Acceptable (LTPA)
Table Rock Branson, MO Raw Water System Replacement 2022–24 TBD $1-5M TBD LTPA
Table Rock Branson, MO Draft Tube Gantry Crane Replacement 2021 TBD $1-5M TBD BVTO
Table Rock Branson, MO Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO
Greers Ferry, AR Powerplant Transformer Refurbishment 2021 TBD $500K-$1M TBD BVTO
Greers Ferry, AR Bridge Crane Replacement 2023 TBD $1-10M TBD BVTO
Greers Ferry, AR Powerhouse Generator Rewind 2023 TBD $10-25M TBD BVTO
Dardanelle, AR Turbine Cavitation Repairs 2023 TBD $5-25M TBD BVTO
Dardanelle, AR Bridge Crane Rehabilitation 2023 TBD $1-10M TBD BVTO
Sam Rayburn Jasper, TX
2 Kaplan Runner Repl, 180” D, 41,300 HP, 70’ Head, 85.7 RPM2 Rewinds, 31.5MVA
2025 333611 $25-100M TBD TBD
Sam Rayburn Jasper, TX SCADA System Installation 2022 238210 $1-5M TBD TBD
Sam Rayburn Jasper, TX Excitation Refurbishment/ Replacement 2022 238210 $1-5M TBD TBD
RS Kerr Sallisaw, OK Replace Intake Crane 2021 TBD $1-5M TBD TBD
Eufaula, OK Draft Tube Crane Replacement Ph II 2021 TBD $1-5M TBD TBD
43FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Denison, TX Switchyard Power Circuit Breaker Replacement (Phases I & II)
2021 TBD $500K-$1M TBD TBD
Broken Bow, OK Exciter Voltage Regulator Replacement (Phases I & II)
2021 TBD $500K-$1M TBD TBD
Fort Gibson, OK Exciter Voltage Regulator Replacement (Phases I & II)
2021 TBD $500K-$1M TBD TBD
Eufaula, OK Roof Replacement (Phases I & II) 2021 TBD $500K-$1M TBD TBD
Denison, TX Generator Air Cooler Replacement (Phase I & II)
2021 TBD $500K-$1M TBD TBD
RS Kerr Sallisaw, OK Sewage System Rehabilitation(Phases I & II)
2021 TBD $250-500K TBD TBD
Tenkiller, OK 15-kV Cable & Pothead Replacement (Phases I & II)
2021 TBD $1-5M TBD TBD
Webbers Falls, OK Station Battery Replacement (Phases I & II)
2021 TBD $100-250K TBD TBD
Broken Bow, OK Station Battery Replacement (Phases I & II)
2021 TBD $100-250K TBD TBD
Denison, TX Draft Tube Crane Rehabilitation 2021 TBD $500K-$1M TBD TBD
Tenkiller, OK Butterfly Valve Replacement 2021 TBD $1-5M TBD TBD
44FY22 HYDROPOWER OPPORTUNITIESSOUTHWESTERN DIVISIONLocation Project Release
Date NAICS Range SBSA SolicitationType
Broken Bow, OK Oil Containment 2021 TBD $500K-$1M TBD TBD
Keystone, OK Bridge Crane Rehab or Replace 2022 TBD $1-5M TBD TBD
Eufaula, OK Turbine Maintenance Platform Replace 2022 TBD $100-250K TBD TBD
Fort Gibson, OK Turbine Maintenance Platform Replace 2022 TBD $100-250K TBD TBD
Denison, TX Powerhouse Roof Replacement 2022 TBD $500K-$1M TBD TBD
SWPA RegionAR,MO, TX
MATOC for Electrical Equipment, 125V AC/ DC, 600V class, 15kV class bus & switchgear
2022-2025 w/ option for 2 addl. yrs.
238210 $25-100M TBD- $50M capacity
Beaver Eureka Springs, AR
Powerhouse Penstock Rehabilitation (Penstock coating)
2022 TBD $1-5M TBD LTPA
Norfork, Mountain Home, AR Potable Water and Waste Water Rehab 2021 TBD $500K-$1M TBD BVTO
Norfork, Mountain Home, AR 2 Francis Runner Repl, 145.5” D, 42,000 HP, 160’ Head, 128.6 RPM Generator Rewind, Excitation Replacement
2022 333611 $25-100M Unrestricted BVTO
Norfork, Mountain Home, AR Fire Protection & Detection 2024 $500K-$1M TBD BVTO
Norfork, Mountain Home, AR Generator Bay Doors 2025 $500K-$1M TBD BVTO
Norfork, Mountain Home, AR Powerhouse HVAC System 2025 $500K-$1M TBD BVTO
ENTER SESSION TITLE
Thanks for Joining us for
Today’s Session!