KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS October 23, 2012

Eng. Andrew Kaywanga©2012

Scaffolding externally Straightening & re plastering to sunshades Fence (boundary wall)-on progress

Page 2: New KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS … · 2013. 1. 28. · KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS October 23, 2012 Eng. Andrew Kaywanga©2012 Scaffolding externally

KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS October 23, 2012

Eng. Andrew Kaywanga©2012

Covered walkway Steel column well erected Re plastered round column at the main entrance

Page 3: New KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS … · 2013. 1. 28. · KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS October 23, 2012 Eng. Andrew Kaywanga©2012 Scaffolding externally

KATANDALA-SUMBAWANGA PROJECT-PROGRESS PHOTOS October 23, 2012

Eng. Andrew Kaywanga©2012

Septic tank & soak pit construction Walling to septic tank