NEWARE | GETTING STARTED
Neware Technology Limited | Battery Testing System Provider
neware.co
Hello
We’d first like to say thanks for your interest in Neware!
Over the next few pages, we’ve included some tips to help you use Neware battery testing system to discover
more about the batteries. As you get more acquainted with our battery testing system, we hope its
combination of simplicity and powerful features meets whatever needs you require when testing the batteries.
Best Regards,
The Neware Team
1
Contents
Electricity ConnectionSoftware Installation
& OperationBattery Connection
2
Electricity Connection
Correct Power Supply
You need to make sure the power supply you are going to
connecting the tester with meets requirements listed on the
information label of the tester.
And also, if the tester comes with a power cable, connect
correct leads to the power system.
Information Label
Power cable leads with function marked
(PE, N, L or L1/L2/L3)
3
Battery Connection
Kelvin Connection System
Each channel of Neware battery tester has at least four sensing
terminals – I+/V+ and I-/V-.
1. The voltage sensing should not be connected on the current
leads.
2. The current sensing should be connected tightly to improve
current passing capability.
Custom battery fixture available from us.
Kelvin Connection System
neware.co
Neware Tester
V+ I+ I- V-
4
Software Installation
LAN-based System
Neware battery tester functions a LAN device, using
TCP/IP to transfer data. Additionally there is SERVER IP to
be configured on the tester, identifying only the hosting
computer having an IP address of SERVER IP can control
this tester.
LAN-based System
5
Software InstallationSoftware Installation & Configuration
You may refer to below link for software package.
neware.co/community/software-packages
General BTS Server/Client
After the installation, you will have BTS Server and BTS Client on the computer. You may
also deploy BTS client and BTS server on separated computers.
Advanced Reporter/MES/LIMS for different scenarios.MySQL and BTS Service registered as Server
BTS Client installed
Application Tier User Interface BTSClient Reporter MES LIMS
Data Tier BTSServer/MySQL Commands Interpreter
Data Organization & Management Database
Hardware Tier
Middle Machine Flash Buffer / Commands / Uploaded
Data / Capacity Calculation
Bottom Machine Commands Output
Basic Data Acquisition
6
Software Installation
Channel Mapping
After you have SERVER IP set, you will see connected
testers on the left tree menu from BTS Client. You still
need to map the channels before you can operate each
one.
1. Click on the target number of the tester.
2. Choose Reset Map(M) *on the right click menu of the
right area from BTS Client.
3. You can choose 1*8 or 1*16 for Main channel mapping.
Channel Mapping
* User logged-in required. admin/neware for default.
7
Software Operation
Start a Test
After channels be mapped, you are now able to start a test
on selected channels.
Work steps can also be saved as a step file in XML file format
for future load.
Start a test
8
Software Operation
Data View
You can use View Data on right click menu of the selected
channel to view data. This will download data from the
server to your local file system and launch BTSDA to open.
BTSDA opens NDA data, rendering data in 2 parts – left is
the plotted curves and right is detailed records.
Data view by BTSDA
9
www.neware.co
Neware Technology Limited | Battery Testing System Provider