![Page 1: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/1.jpg)
PRE-ENGINEERED BUILDINGS
NO COST OVERRUNS.NO DELAYS.NOW YOU CAN RELAX!
![Page 2: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/2.jpg)
PRE-ENGINEERED BUILDINGS
EVEREST PRE-ENGINEERED BUILDINGS
With Everest Pre-Engineered Buildings, we promise you a complete building solution that takes care of all your construction needs. We don’t just deliver, we do it the right way!
Earnestly committed to cultivate a system where the customer is kept ‘within the loop’, we are absolutely transparent and process-driven in our workflow. Everest Pre-Engineered Buildings are an example of systematic development. From structural design to installation, our customised ERP runs on SAPR3 platform that enable you to track the status of your project at any point of time. Timely performance, excellent service backup and a faster response time are the reasons that renowned companies like Vodafone, Ericsson, DLF, Walmart, GM, Britannia, Godrej, Ambuja and ACC have trusted only Everest for their Pre-Engineered Building needs.
Everest Steel Building Plant at RoorkeeInset of the Plant2 3
![Page 3: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/3.jpg)
PRE-ENGINEERED BUILDINGS
ON TIME,EVERY TIME!
Trusted for over 79 years
Complete transparency in working system
Galvanised Purlins
Constructed over 1000 buildings
System driven
Fast and On Time Deliveries
World class design & engineering softwares
Complete project management including erection
High tensile steel members (345MPa)
Completed site at RISHI FIBC Solutions Plant, Baroda
The Everest Edge
Everest ensures that timely delivery through systematic flow of processes. At every point in the construction process, checkpoints minimise errors thereby saving on time. Through our process-driven approach, reaction time decreases considerably; resulting in faster, accurate project completion.
RISHI FIBC Plant, Baroda during initial stages of construction
Roorkee Plant at night
4 5
![Page 4: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/4.jpg)
PRE-ENGINEERED BUILDINGS
Everest is one of the very few companies to effectively implement and practice ERP. Our in-house SPEED module, built on SAPR3, has been a sound contributor in streamlining the entire manufacturing process and maximising overall efficiency. This system helps us deliver high quality products, on time, every time!
A seamless integration of processes, from Request For Quotation (RFQ) to Project Handover
Sequential supply system for the various blocks comprising the overall building
Daily project updates for the customer
Absolute transparency in working for all stakeholders
Reduced reaction time to provide faster and accurate project completion
Dedicated section for uploading of all drawings so that they can be retrieved at any time for any requirement later
Ensures:
Design Section at Everest
Driven by
Winner of best SAP
implementationAward
6 7
![Page 5: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/5.jpg)
PRE-ENGINEERED BUILDINGS
ARHAM LOGISTICS
Two precision engineered buildings connected with well-designed PEB pathway
Innovative clear span construction
Span: 63ft
Key Features
Location: Bhiwandi/ MumbaiArea: 6,10,404 sqftUsage: WarehouseYear of Construction: 2009
M. J. LOGISTIC SERVICES LTD.
Intricate L-shaped building with more loading and unloading docks
One intermediate column for both buildings EMS1
Designed for future expansion
Key Features
Location: Palwal, Haryana Area: 1,93,680 sqftUsage: WarehouseYear of Construction: 2008
LOGISTICAL UNITS AND WAREHOUSES
8 9
BK TYRE
Intricate L-shaped building with more loading and unloading docks
One intermediate column for both buildings EMS1
Clear height: 39ft
Key Features
Location: Bhiwadi, Rajasthan Area: 1,42,032 sqftUsage: Warehouse for Finished GoodsYear of Construction: 2011
SHREE SHUBHAM LOGISTICS LTD.
Jack Beam provided to increase bay space by 49ft
IS-Standard building with heavy collateral loads
Multiple buildings with Louvers, Doors, Ridge Vents and Insulation
Key Features
Location: Alwar/ Deesa/ Jodhpur/ Rajkot/ Ramganj MandiArea: 5,64,900 sqftUsage: WarehouseYear of Construction: 2009
VIJAY LOGISTICS
Very large clear span building
Clear height: 30ft
Highly satisfied repeat customer
Key Features
Location: Betul/ Hisar/ PuneArea: 10,00,000 sqftUsage: Warehouse/ Satsang HallYear of Construction: 2008 - 2013
Span of building 72 m (EMS-II)
Intermittent Lean-to along side walls
Combination of ridge vent, turbo vents & louvers for efficient ventilation system
S. B. OVERSEAS
Key Features
Location: Kolkata, West Bengal Area: 1,21,094 sqftUsage: FMCG & Consumer Goods Storage Unit Year of Construction: 2011
![Page 6: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/6.jpg)
PRE-ENGINEERED BUILDINGS
MCNALLY BHARAT ENGG. CO. LTD.
50 MT crane in 4 spans (total 200 MT)
Ridge Height: 77ft
Mezzanine, Walkway, Roof Monitor and other accessories
Key Features
Location: Asansol, West BengalArea: 1,20,000 sqftUsage: Heavy Fabrication FactoryYear of Construction: 2008
FACTORY BUILDINGS
10 11
LOTUS TECH PARK (TRIDENT)
Building designed for temperature load of +/- 30 degrees
Structure arrangement for housing Air Humidifiers
Special arrangements to protect structure from rusting due to high humidity
Key Features
Location: Barnala, Punjab Area: 3,00,000 sqftUsage: Textile FactoryYear of Construction: 2010
BRITANNIA INDUSTRIES LTD.
Multi Gable with 40m clear span
A foolproof design for water discharge from the roof
A repeat customer with great satisfaction level
Key Features
Location: Bihar/ Gujarat/ Odisha Area: 6,50,000 sqftUsage: Biscuit Manufacturing FactoryYear of Construction: 2010 - 2013
NSSL LTD.
Curved Roof System
Multiple Crane and Mezzanine System (total 71 cranes)
Mezzanine floor integrated
Key Features
Location: Nagpur, Maharashtra Area: 1,25,000 sqftUsage: Factory for Valve ManufacturingYear of Construction: 2010
GODREJ AGROVET LTD.
Key Features
Location: Kharagpur/ Kanpur/ VaranasiArea: 10,17,384 sqftUsage: Manufacturing Unit for Animal FeedYear of Construction: 2013
32m high Process Building
Challenging, specially cladding installation
Intricate shaped building with high bay-low bay formation
Stiff requirement for Heavy Dead Loads, Deflection and Jack Beam
Large building accessories like Roll-up Doors, Louvers, Windows, Insulation, Crane Maintenance Platform and Lighting Arrestors
Unique Cladding Pattern
JOHN DEERE TRACTORS
Key Features
Location: Patiala, Punjab Area: 80,000 sqftUsage: Tractor Manufacturing UnitYear of Construction: 2011
![Page 7: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/7.jpg)
PRE-ENGINEERED BUILDINGS
KALPANA INDUSTRIES
78m width
Curved roof
High bay-low bay with 20m & 14m respective Clear height
Key Features
JEUMONT ELECTRIC INDIA LTD.
Heavy Crane Load design (60 MT x 2 nos./ 20 MT x 3 nos.)
Insulated Roof and Wall Cladding System
Clear height: 18m
Key Features
Location: Baroda, Gujarat Area: 75,320 sqftUsage: Manufacturing for Heavy ElectricalsYear of Construction: 2011
Location: Kolkata, West BengalArea: 85,810 sqftUsage: FactoryYear of Construction: 2012
OFFICES/ COMMERCIAL BUILDINGS
Multiple Crane System with large span
EOT 5 MT x 4 nos. with crane beams
All secondary members are pre-galvanised
NIRMAL WIRES
Key Features
Location: Kolkata, West Bengal Area: 1,16,380 sqftUsage: Manufacturing Facility for WiresYear of Construction: 2009
ANSAL API LTD.
Key Features
Location: Lucknow, Uttar PradeshArea: 60,000 sqftUsage: Engineering InstituteYear of Construction: 2011
55,000sqft building constructed within 90 days from the date of LOI Smart Steel Product of 14 x 14 m span
Complete with false ceiling and partitions
2
12 13
BHARTI WALMART
Standing Seam Roofing and Puff Panel Wall Cladding System
Precise engineering to connect with RCC buildings
Designed to support heavy Air Conditioning and Utility Units from roof to different locations
Key Features
Location: Amritsar/ Jallandhar/ Lucknow/ Meerut/ Raipur Area: 2,50,000 sqftUsage: Cash Carry StoreYear of Construction: 2008 - 2011
FACTORY BUILDINGS
EVEREST DESIGN CENTRE
G+2 Building
Entirely built form EVEREST products
Setting an example of Green Building Solution
Key Features
Location: Roorkee, Uttarakhand Area: 27,987 sqftUsage: Multistorey OfficeYear of Construction: 2012
![Page 8: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/8.jpg)
PRE-ENGINEERED BUILDINGSSPECIALTY BUILDINGS
14 15
MULTI-STOREYED BUILDINGS
I.I.T. MUMBAI
G+3 Building
Laboratory & Office EVEREST- single point building supplier (Internal & External)
Key Features
Location: Powai - Mumbai, Maharashtra Area: 32,938 sqftUsage: Institutional BuildingYear of Construction: 2012
BP ERGO
Certified Green Building
Full area mezzanine
14 m high
Key Features
Location: Nalagarh, Himachal PradeshArea: 1,19,230 sqftUsage: FactoryYear of Construction: 2012
ACC LTD.
Key Features
Location: Roorkee, UttarakhandArea: 32,292 sqftUsage: FactoryYear of Construction: 2009
58 m clear span
25 m clear Height
Lower slope with Higher span
ABC BEARINGS
Double Skin Insulation in complete building
Curved eaves with ACP
Low-BOC water base Paint, certified for Green Building
Key Features
Location: Dehradun, Uttarakhand Area: 13,944sqftUsage: Production Unit for Bearing ManufacturingYear of Construction: 2012
G+4 Building
Removable floors design for Heavy Equipment Installation
Over 110 MT of vessel loading
KAVERI HIRE PURCHASE & DEPOSITS PVT. LTD.
Key Features
Location: Beawar, Rajasthan Area: 1,21,923 sqftUsage: Food Processing UnitYear of Construction: 2013
O. C. SPECIALTIES PVT. LTD.
2 nos. of G+2 Industrial Building
Industrial Louvers all around Pharmaceutical Manufacturing Unit
Over 1 T/sqm floor loading
Key Features
Location: Sholapur, Maharashtra Area: 23,358 sqftUsage: Pharmaceutical Manufacturing UnitYear of Construction: 2013
![Page 9: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/9.jpg)
PRE-ENGINEERED BUILDINGS
OVER 1,000 BUILDINGSACROSS 245 CITIES
IN 27 STATESOver 45 Million sqft covered area
and counting...THE FASTEST GROWING BUILDING SOLUTIONS COMPANY IN INDIA
Over the last five years, Everest Industries has grown in leaps and bounds. A strong order book and proliferating net sales ensured the same. Year after year, Everest Industries has recorded a considerable rise in Operating Profit, PAT, Return on Net and Volume Growth. Today it stands amongst the best in evolving business with innovation.
Turnover 229.65 253.06 325.79 285.14 529.45 680.90 721.59 886.86 1014.00
0
200
400
600
800
1000
1200
2004-05 2005-06 2006-07 2007-08
2008-09
2009-10 2010-11 2011-12 2012-13(July ‘08 - start of PEB
Business)
Everest Industries Limited Turnover (Rs. in Crore)
16 17
![Page 10: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/10.jpg)
PRE-ENGINEERED BUILDINGS
STRENGTH AND SAFETY
At Everest, the safety of employees is paramount. Training on safety is conducted at regular intervals and in addition, permanent safety officers are deployed at every unit to ensure maximum safety. Primary and Secondary fall protection is maintained and PPE is used at all sites for utmost safety. Every single employee at Everest is insured. All the safety practices at Everest are in accordance with the globally-acknowledged pre requisites, thereby giving you a perfect Building Solutions provider to partner with.
Where Safety is a Priority
18 19
Cladding with Boom LiftSite Erection with Boom lift
![Page 11: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/11.jpg)
PRE-ENGINEERED BUILDINGS
Everest Pre-Engineered Steel Buildings are 100% custom designed to provide maximum space utilisation, excellent strength and highest safety standards.
Our basic architectural measures include:
Building Width: the distance from the outside of the eave strut of one sidewall to the outside of the eave strut of the facing wall
Building Length: the distance between the outside flanges of endwall columns in the facing endwall
End Bay Length: the distance from the outside of the outer flange of endwall columns to the centre line of the first interior frame columns
Interior Bay Length: the distance between the centre lines of two adjacent interior main frame columns, which usually range from 6m, 7.5m and 9m to 15m
Frame Cross Section
Anchor Bolt Plan Everest Lean - TO (ELT)
Everest Roof System (ERS) Everest Multi Gable (EMG)
Everest Multi Span (EMS-2) Everest Multi Span (EMS-3)
Everest Clear Span (ECS) Everest Multi Span (EMS-1)
The Building Height is the eave height, which is the length from the foot of the main frame column base plate to the top outer point of the eave strut and can measure up to a height of 30m. In the case of columns that are recessed or elevated from the finished floor, the eave height is the distance from the finished floor to the top of the eave strut. The Roof Slope is the angle that the roof forms with respect to the horizontal and is commonly 1/10. Everest buildings are designed to meet every stringent local and international code - IS (Indian Standard), AISC (American Institute of Steel Construction), AISI (American Iron & Steel Institute), MBMA (Metal Building Manufacturers Association) and AWS (American Welding Society).
FRAMING SYSTEMS
Everest Mono Slope (EMS)20 21
![Page 12: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/12.jpg)
PRE-ENGINEERED BUILDINGS
BUILDINGS WITH CRANES
Everest Pre-Engineered Steel Building Systems are ideal for factory buildings and manufacturing facilities that require installation of cranes for material handling. Our buildings can be designed to support various crane systems up to 300 MT.
Jib Crane and Monorail Crane Underhung Crane
Top Running Crane in a Clear Span Building
Joist to Beam Connection at EndwallJoist Connection at Intermediate Beam Mezzanine Beam Connection to Rigid Frame Column
BUILDINGS WITH MEZZANINES
Everest Standard Mezzanine Floor Systems consist of Galvanised Steel Decking supported by joists that are connected to the main mezzanine beams. A reinforced concrete slab (not supplied by Everest) is cast in-situ on top of the steel decking. The primary mezzanine beams usually run across the width of the building and the joists mostly run lengthwise (parallel to the roof purlins).
Mezzanine Plan
22 23Gantry Crane
Semi-Gantry Crane
![Page 13: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/13.jpg)
PRE-ENGINEERED BUILDINGS
ROOF AND WALL CLADDING PANELS
Metal Panels are one of the most aesthetic features of a Metal Building System. ‘Panel’ refers to the metal skin used as roof and wall panels, interior roof and wall liners, partition panels, fascia panels and soffit panels etc.
Everest Steel PanelsThe base metal is high tensile steel with high grade Aluminum Zinc alloy coating, comprising 55% Aluminum and 45% Zinc and weighing 150g/m spread over both sides. This coating offers four times higher resistance to corrosion as compared to galvanised coating.
Everest Colour Coated Steel Panels have a 5-micron primer paint and a 20-micron silicon modified polyester paint applied at the mill on the weather (exterior) face. Everest also offers Pvf 2 (Fluro Polymer) using minimum 70% Kynar/ Hylar - 500 Resin, which ensures that your building continues to look beautiful for a lifetime.
Roof and Wall ProfilesEverest offers a wide variety of modern profiles to suit all applications.
Sheeting Pattern above 3m brick wall
Roof Panels* ER - Everest Roof
Wall Panels* EW - Everest Wall
Sheeting Pattern starting from Finished Floor Level (FFL)
ER - SS - 1750 ER - SS - 2000 ER - SS - 2500 ER - 32 - 251
EW - 30 - 250 EW - 25 - 250 EW - 32 - 251
Sheeting Pattern above 1m brick wall24 25
![Page 14: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/14.jpg)
PRE-ENGINEERED BUILDINGS
Rishi FIBC Solutions Pvt. Ltd. I KBK Polymers Pvt. Ltd. I Babaji Shivram Clearing & Carriers Pvt. Ltd. Nirlon Ltd. I Everest Industries Ltd. I Vodafone Essar South Ltd. I Amanora Park Town City Corporation Ltd. I Tristar Infrastructure Pvt. Ltd. I Radico Khaitan Ltd. I Aqua Infra Projects Ltd. I Rashtriya Chemicals & Fertilisers Ltd. I Lohia International Ericsson India Pvt. Ltd. I Mcnally Bharat Engineering Co. Ltd. I Aquarius Educational Academy Pvt. Ltd. I HT Press I Tristar Infrastructure Pvt. Ltd. I Jaichandra Hitech Engineering Pvt. Ltd. I Ramkay Enviro Engineers Ltd. I DLF Home Developers Ltd. Agrawal Warehouse & Logistics I Sarla Performance Fibres I M.K.U Holdings Pvt. Ltd. I K.J.V Alloy Conductors Pvt. Ltd. I Angel’s Resort I Shreenidhi Realtors Pvt. Ltd. I Special Engineering Services Ltd. I Jazzcon Engineers I West Bengal Waste Management Ltd. I Tirupati Industries
Cima Shyam Springs Pvt. Ltd. I Eastern Copper Manufacturing Co. I Radha Madhav Industries I Nanda Glass Industries I Agro Shine I Reliance MediaWorks Ltd./Adlabs Films Ltd. I Intertouch Metal Buildings (P) Ltd. I Ashoka Precon Pvt. Ltd. I Arcvac Forgecast Ltd. I Apex Industries I Orient Polymer Pvt. Ltd. I Lion Vidya Mandir I Manmohan Minerals & Chemical Pvt. Ltd. I Instruments A. Chemicals Pvt. Ltd. I Sawan Kirpal Ruhani Mission I Aesthetics Exports (Pvt.) Ltd. I Wolkem India Ltd. I Om Logistics Ltd. I Marine Electricals Pvt. Ltd. I Abhimani Publications Ltd. I Hissar Udyog Pvt. Ltd. I Bhadani Associates I KSE Electricals Pvt. Ltd. I Topez Piping Industries I IFB Industries Ltd. I Met Trade India Ltd. I A C Polycoaters Pvt. Ltd. I Soneko Warehousing Ltd. I Intertouch Metal Buildings (P) Ltd. I Harish Arora I Vijay Logistics Pvt. Ltd. I Ganpati Earthmovers Pvt. Ltd. I Adani Power Ltd. I Indo Asian Fusegear Ltd. I V Kanjana I Raja Ramanna Centre for Advanced Technology I Basukinath Food Processors Pvt. Ltd. I Ganesh Wheat Products Pvt. Ltd. I Easy Mats Private Ltd. I Har International Pvt. Ltd. I Twilight Litaka Pharma Ltd./ Loreal India Pvt. Ltd.
2009 2010 2011 2012 2013
D.S. Group I Cadbury India Ltd. I JMP Industry Pvt. Ltd. I IL & FS Invironmental Infrastr. Services Ltd. I BLA Power Pvt Ltd. I Zebulon’s Warehousing I Hero Motors Ltd. I Patial Builder & Contractors Pvt. Ltd. I Kellogg India Pvt. Ltd. I Spirotech Heat Exchangers Pvt. Ltd. I Ganesh Grains Ltd. I IPF Vikram India Ltd. I Sona Sati Organics Pvt. Ltd. I Prakash Industries Ltd. I Kisan Phosphates Pvt. Ltd. I Archean Chemical Industries Pvt. Ltd. I Crystal Packaging I Crox Oil & Gas Pvt. Ltd. I GSPL Casting Industries I My Home Industries Ltd. I Bharti WalMart I AAP Autowheels Pvt. Ltd. I Sesa Goa I Sunfrost Frozen Foods Pvt. Ltd. I Godrej Agrovet Ltd. I Essar Projects (India) Ltd. I Komarla Feeds & Foods Pvt. Ltd. I Rich Land Developers I OMP India Pvt. Ltd. I Century Pulp & Paper I Aphrodite 4 Wheels Pvt. Ltd. I Crown Weldcare Pvt. Ltd. I Acrysil Ltd. I Caparo Engineers & Construction Ltd. I Garg Acrylics Ltd. I Caparo Engineers & Construction Ltd. I Hindustan Construction Company I Sarda Energy & Food Pvt. Ltd. I Yash Construction I Dhuleva Industries I Apollo Mobikes I Redefine Tech Services Pvt. Ltd. I Amricon Agro Vet Pvt. Ltd. I Mcnally Bharat Engg. Ltd. I Shankar Equipments Ltd. I Kanoria Africa Textiles Plc I JMD Enterprises I Shri Ramji Warehouse I Salasarhanumanji Grains Pvt. Ltd. I Vipasana Industries Pvt. Ltd. I Savair Energy Ltd. I Kajaria Ceramics Ltd. I Sara Automobiles Pvt. Ltd. I Everest Industries Ltd. I Sahara Pure Eatables Corporation Ltd. I Angelique International Ltd. I Pearl Global Industries Ltd. I Om Sai Udyog I Mangala Pundalik Shejul I KNY Projects Pvt. Ltd. I Sunil Hitech Engineers Ltd. I Dhakalia Investment Ltd. I Ventilation Engineering Company I Acrysil Steel Ltd. Servokon System Ltd. I Bhutan Hydro Power Services Ltd. I Sai Enterprises I Aspet Technoplast Pvt. Ltd. I K.K. Breweries Pvt. Ltd. I Vision Parental Pvt. Ltd. I Hindustan Vidyut Products Ltd. I Shilpi Kumar Aggarwal I Maurya Motors Ltd. I Ajay Kumar Agarwal I Radhe Radhe Oil Industries I Ashapura Minechem Ltd.I Adani Power Ltd. I Varivas Properties Ltd. I Lotus Wireless
Tantia Chemicals Pvt. Ltd. I Om Logistics I Adani Power I Sumash Developers Pvt. Ltd. I Maharashtra Shetkari Sugar Ltd. I S M Auto Engg. Pvt. Ltd. I LG Extractions Pvt. Ltd. I SKH MM I Ashapura Group of Industries I Standard International P Ltd. I Honda Siel Car India I Ficus Pax Pvt. Ltd. I Suri Auto Products I Carrfour WC & C Pvt. Ltd. I Lotus Intergrated Taxpark Ltd. I Grindwel Norton I Ravi Steel Pvt. Ltd. I Ranbaxy Laboratory Ltd. I Jeumont Electric India Pvt. Ltd. I Galaxy Cables Pvt. Ltd. I Metflow Controls Pvt. Ltd. I Grindwel Norton I Shree Salasar Polyflex Pvt. Ltd. I CMM Logistics Pvt. Ltd. I Lanxess India Pvt. Ltd. I Excel Paper Packaging Pvt. Ltd. I Integrated Equipments & Infraservices Pvt. Ltd. I HLL Lifecare Ltd. I Padmavathi Agro Mills (P) Ltd. I Krishidhan Seeds Pvt. Ltd. I India Glycols Ltd. I Pipe Hangrs & Supports Pvt. Ltd. I Zest Auto Ltd. I Gateway Impax Pvt. Ltd. I Kiwi Commodities Pvt. Ltd. I Spirotech Heat Exchangers Pvt. Ltd. I Amrit Feeds Ltd. I Minda Investment Ltd.Everton Tea India Ltd. I Leena Maggon I Palu Brothers I Senghani & Senghani Exim Pvt. Ltd. I PSL Ltd. I Vedanta Medicare I Vijay Technocrats Pvt. Ltd. I IndoChem Industries I GTR Aluminium I Celware Logistic Pvt. Ltd. I ABC Bearing Ltd. I Nilkamal Eswaran Plastic. Pvt Ltd. I Capitol Nonwoven Pvt. Ltd. I Standard International Precision I Shreem Electric Ltd. I KJS Concreate I GKP Merchants Pvt. Ltd. I Surya Laxmi Industries I Global Aqua Pvt. Ltd. I BPA Project
Whirlpool India Ltd. I Precision Manufacturing Pvt. Ltd. I Noble Natural Resources (I) P Ltd. I Radhe Agro Industries India Pvt. Ltd. I Hero Motors Ltd. I A One Tex Tech P. Ltd. I Mahipal & Brothers I Metra Agri Industries I M P Khaitan I Krifor Industries Ltd. I Krypton Industries Ltd. I Tender Heart Senior Secondary School I RN Gupta & Co. Ltd. IDhongade Logistics I Abhishek Enterprises I Tata Chemicals Ltd. I Shri Radharasbihari Steel P Ltd. I Lal Chand Rajneesh Kumar I J.K. Paper Ltd. I Sleek International I Hentech Agrovet Pvt. Ltd. I Patial Builder & Contractors P Ltd. I Gajanan Sidhivinayak Foods P Ltd. I Gati KWE Ltd. I Angelique International Ltd. I Rockman Industries Ltd. I Garg Acrylics Ltd. I Kisan Phosphates Pvt. Ltd. I Dabur India Ltd. I Amrit Hatcharies Ltd. I Britannia Industries Ltd. I Micro Polypet P. Ltd. I Crystal Packaging I Enco Engineers Combie I Gadre Autocon I Pentair Water India Pvt. Ltd. I Flexituff International Ltd. I Rahul Internation P. Ltd. I Magicrete Building Solution P. Ltd. I SAPA Profiles India Pvt. Ltd. I Machino Plastics Ltd. I Metro Agri Industries Ltd. I Alkem Laboratories I Bergwerff Organic India Pvt.Ltd. I IQRA Steel & Tube Pvt. Ltd. I Padamshree Inc. I Sneh Quality Spices Pvt. Ltd. I New Holland Fiat (India) Pvt. Ltd. I Noble Natural Resources (I) P Ltd. I Khanna Polyrib Pvt. Ltd. I Fastbuild Blocks Pvt. Ltd. I AAP Autowheels Pvt. Ltd. I TES AMM Recyclers India I SS Sales Corporation Cummins Technologies India Ltd. I Gokuldas Warehousing Corporation I Uttar Banga Sambad I Spaceage Multiproduct Pvt. Ltd. I Elite Electronics Pvt. Ltd. I Cosmic Grace Auto (India) Pvt. Ltd. I Sachdeva Textiles I Transmart India Pvt. Ltd. I Josch Systems
26 27
1,000
200
400
600
800
YEAR
NO
. OF
PR
OJE
CTS
![Page 15: NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! · 2016-07-12 · NO COST OVERRUNS. NO DELAYS. NOW YOU CAN RELAX! PRE-ENGINEERED BUILDINGS ... Walmart, GM, Britannia, Godrej, Ambuja](https://reader033.vdocuments.net/reader033/viewer/2022042201/5ea1fb642159f27ab05e27e7/html5/thumbnails/15.jpg)
Presentations in the brochure or any other Everest Industries Limited publications are correct to the best of the knowledge of the company, at the time of preparation. Everest Industries Limited provides this information in an advisory capacity only and reserves the right to change the specifications without prior intimation.
EVEREST INDUSTRIES LIMITED: Genesis A-32 Mohan Co-operative Industrial Estate Mathura Road New Delhi 110044 India Tel: +91-11-41731951/52 Fax: +91-11-46566370
FOR MORE DETAILS, CONTACT: New Delhi - 9810054479, 9650031191 Mumbai - 9987788005, 9920395301 Pune - 9503058299 Kolhapur - 9987987785 Bengaluru - 9731011497, 9900428148 Kolkata - 9748779833, 9748462052 Bhubaneshwar - 9937170233 Chandigarh - 9779094498, 8283835943 Chennai - 9900428148, 8220276622 Hyderabad - 9652480910 Coimbatore - 8220010050 Jamshedpur - 9771430112 Patna - 9771456152 Nashik - 9867202273 Indore/ Bhopal/ Nagpur/ Raipur/ Ahmedabad/ Vadodara/ Gandhidham - 9987788005
Helpline: 09958037777 I [email protected] I www.everestind.com