Hydrokinetic TurbineFeaturing Variable Flux Generation
October 1, 2009
Sean CurranVanessa Kohler
Erik MinnisMichael Perry
C. Taylor PetersonAlex Quintal
![Page 2: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/2.jpg)
Introduction• Direct drive power generation at low flow velocities• Magnets engage with coils • Axial displacement is relative to drag on the rotors
![Page 3: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/3.jpg)
Objectives
Design and construct a hydrokinetic turbine to utilize low velocity tidal currents for power generation.
VFG Wind Turbine:4.7m diameter
![Page 4: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/4.jpg)
Approach• Water is 830 times denser than air
– Turbine blades will encounter higher forces• Model tested in tow tank • Demonstration model turbine to be deployed under
General Sullivan Bridge
![Page 5: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/5.jpg)
Major Tasks• Stator Development
– Includes coils specified to generate a certain amount of electricity at certain frequency
• Rotor Design– Formed by turbine blade assembly– Turns magnetic ring assembly in generator
• Blade Selection– Shape, angle of attack & material
![Page 6: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/6.jpg)
Major Tasks (cont.)• Water Proofing and Corrosion Resistance
– Salt water application– Component isolation from water
• Generator Actuation– Magnetic rotor– Fixed coils– Magnetic rotor can move axially
• Deployment Structure– Based from barge– Based from pier– Based from platform in Tow Tank
![Page 7: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/7.jpg)
TimelinePLAN OF ATTACK
September Proposal, Conceptual design analysisOctober Create parts in CADNovember Analyze CAD parts using FEA
December
Analyze CAD parts using FEA, and consider parts procurement /manufacturing
Break Begins Order Parts, rough draft of final report
Break Ends Prototype partially assembled
FebruaryPrototype fully assembled- testing in Tow Tank
March Testing in tow tank and in salt water
April Review Progress- finish report
MayPresent Report, poster, and final product
![Page 8: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/8.jpg)
Write Proposal
Compile Gantt Chart
Conceptual Designs
Conceptual Design Report
Pro/ENGINEER Drawings
Pro/ENGINEER Report
Analysis
FEA Report
Price Report
Parts & Materials Ordered
Build Report I
Tank Testing
Build Report II
Prototype Conmplete
Build Report III
Ocean Testing
Testing Report
Final Report/Poster/URC
9/1/2009 10/21/2009 12/10/2009 1/29/2010 3/20/2010 5/9/2010
Start Date 4/3/2010
VFG Project Timeline
![Page 9: October 1 , 2009](https://reader036.vdocuments.net/reader036/viewer/2022062310/568161de550346895dd1ef14/html5/thumbnails/9.jpg)
Fiberglass Resin Magnets Generator
Seals Housing Bearings
Shafts Steel
Budget