上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 0 of 67
Operation and maintenance regulation
of 150,000 ton / annual
rolling mill line for wire rod
RASHMI, INDIA
上海重矿冶金设备有限公司
SHANGHAI HEAVY MINING MACHINERY LTD
2010.12
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 2 of 67
Chapter 1. Regulation I. Parameter for equipment
1. Pinch roll before no-twist mill
Diameter of pinch roller: Φ295mm~Φ310mm
Max distance of pinch roller: 335mm
Min distance of pinch roller: 298mm
Motor model: Z4-160-31
Power: 22kw
Voltage: DC 440V
Rotary speed: 1000~2000 r/min
Ratio: 0.963
Rolling speed: 6~12m/s
Cylinder: Φ125x200mm
Working pressure: 0.4~0.63mpa
2. Crop shear
Motor model: ZFQZ-315-081
Power: 112kw;
Voltage: DC 440v;
Rotary speed: 500~1000 r/min
Rotary diameter of blade: 800mm
Ratio: 1
Overlap of blade: 0.25~0.75mm
Rolling speed: ≤15 m/s
Cutting temperature: ≥850 ℃
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 3 of 67
Cutting section: max Φ17
3. Chopping shear
Motor model: Z4-225-11
Power: 75kw;
Voltage: DC 440v;
Rotary speed: 1000~2000r/min
Distance between centers of
Rotary blade and pinch roller: 443.5mm
Diameter of pitch circle: Φ164mm
Ratio: 1
Distance between centers of
Rotary blade: 250mm
Diameter of pitch circle: 250mm
Ratio: 1
Diameter of piston: Φ160mm
Diameter of piston rod: Φ40mm
Stroke: 40mm
Diameter of rotary blade: 250mm
Overlap of blade: 0.25~0.75mm
Chopping length: 260mm
4. Side looper
Working pressure 0.4 ~0.6 MPa
Diameter of piston Φ130mm
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 4 of 67
Piston stroke 254 mm
Forming range: 300~600mm
5. Snap shear
Working temperature: >850℃
Rolling piece speed: 6~8 m/s
Cylinder diameter & stroke Φ63mm x 70mm
Cylinder working pressure ≥0.4Mpa
6. 8-stand heavy duty no-twist mill
Motor model: Z710-320
Power 1300KW
Rotary speed: 1000~1300 r/min
Voltage: DC 750V
Cascade connection for 2 motors
Roller ring size
N0.1~ N0.3 Φ210.5(max)~Φ189.5(min) x 72 mm
N0.4~ N0.8 Φ158.8(max)~Φ142.91(min) x 62 mm
Rolling torque
Φ200 rolling mill stand M = 2.86 KNm
Φ150 rolling mill stand M = 1.61 KNm
Rolling force
Φ200 rolling mill stand P = 152 KN
Φ150 rolling mill stand P = 107.8 KN
Rolling mill stand type and quantity: 45°top cross 8-stand centralized drive
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 5 of 67
Cooling water working pressure: 0.5 ~ 0.6 Mpa3
Cooling water consumption: max 30m³/h for each stand
Speed-up gear box:
Ratio for high speed output shaft 0.2866
Ratio for low speed output shaft 0.3503
Ratio for each stands:
Stands No. Ratio No1 Φ200 1.01206818 No2 Φ200 0.80487113 No3 Φ200 0.66878989 No4 Φ150 0.40239947 No5 Φ150 0.32262096 No6 Φ150 0.25726428 No7 Φ150 0.20520449 No8 Φ150 0.16346826
Lubrication: centre oil lubrication
Oil working pressure: 0.35mpa
Oil consumption: 800 l/min
Oil model: Mobil 525
Cleanliness: 10µ
Cooling water for roller:
Working pressure 0.5~0.6mpa;
Water consumption Max.8×30m³/h
Hydraulic system for protecting jacket:
Working pressure 15mpa;
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 6 of 67
System flow: 20 l/min
Working pressure for load the roller: max22.5mpa
Working pressure for unload the roller: max 60mpa
7. Pinch roll before lying head
Motor model: Z4-180-41
Power 55 KW ;
Voltage DC 440v;
Rotary speed 1500 ~3000 r/min
Gear box ratio: 1/4.247
Max pinch force: 3350 N
Cooling water pressure: 0.4~0.6 MPa
Water flow 10 m³/h
Lubrication oil pressure 0.35 MPa
Oil flow: 25L/min
Pressed air pressure: 0.4~0.6 MPa
Air flow: 10 m³/h
8. Lying head
Product size: Φ5.5mm ~ Φ16mm
Diameter of coil Φ1080mm
Max produce speed: 65 m/s
Motor model: Z4-200-31
Power : 90 KW;
Voltage DC 440V;
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 7 of 67
Rotary speed: 1500~3000 r/min
Ratio : 1.538
Diameter of cylinder piston: Φ200 mm
Diameter of cylinder piston rod: Φ50 mm
Cylinder stroke: 610 mm
Working pressure: 0.6 MPa
9. Cooling roller table
Roller table driven motor: YTSP132M-4;
Power 7.5KW ;
Rotary speed: 1480 r/min;
Quantity: 7 set;
Ratio: 7
Diameter of roller: Φ120mm
Roller center distance: 295mm
Lifting motor model: Y132M-4;
Power 7.5KW ;
Rotary speed: 1440 r/min
Ratio: 24
Diameter of roller Φ120mm
Roller center distance: 127mm
Push rod motor model: Y112M-6;
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 8 of 67
Power: 2.2KW ;
Rotary speed 1480 r/min
Diameter of roller: Φ120mm
Roller center distance: 295mm
Roller length: 1450 mm
Line speed of roller table: 0.25~1.5m/s
Drop height between sections 250mm
10. Blower
Motor model: Y2-315M-6;
Power : 90KW ;
Rotary speed: 980 r/min;
Quantity : 5 sets
Air volume: max 110000 m³/h
Air pressure: 1900 Pa
Cooling bearing water consumption 1.5~2t/h
Water pressure: 0.2~0.4 MPa
11. Reform station
Inside diameter of coil
collecting device: 1250 mm
Elevating distance: 50 mm
Air cylinder for finger:
Inside diameter of cylinder Φ200mm
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 9 of 67
Stroke: 320mm
Working pressure: 0.4~0.6 MPa
Hydraulic cylinder: φ40 x φ28mm
Stroke: 290mm
Coil plate lifting motor model: YTSZ280S-6
Power : 55KW;
Rotary speed: 975 r/min
Brake torque: 1600 NM
Ratio: I = 27.96
Hydraulic cylinder for coil plate:
Inside diameter of cylinder Φ80mm
Stroke 440mm
Double-support arm spindle
motor model YTSZE200L1-4;
Power : 30KW
Rotary speed: 1470 r/min
Brake torque 300 NM
12. Coil transport car
Coil transport car motor model: YTSZ225S-8;
Power : 22KW
Rotary speed: 735 r/min
Brake torque : 400 ~ 630 NM
Transport speed: 300 mm/s
Ratio : I = 9.75
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 10 of 67
13. Bundling machine
Tying coil motor model: Y100L1-4;
Power : 2.2KW;
Rotary speed: 1480 r/min;
Quantity : 4台
Driving supporting motor model: Y132S-4;
Power : 5.5KW
Rotary speed 1480 r/min
Diameter of hydraulic cylinder: φ200mm ;
Stroke: 1700mm
Force : 40 t ;
Max bundling length: 3650mm ;
Min bundling length: 600mm
14. Coil weighing scale
Hydraulic cylinder: Φ125 xΦ90 mm
stroke: 500mm
weigh range: 0 ~ 2500 Kg
accuracy: ±1 Kg
scale mark: 1 Kg
coil(outside diameter /
inside diameter / thickness) Φ1250/Φ850/Φ1800 mm
max coil weight: 2000 Kg
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 11 of 67
II. Regulation for operation
1. Pinch roll before no-twist mill
Feature
Pinch roll before no-twist mill located before crop shear, and it pinch the
rolling piece to no-twist mill while normally rolling. It consists of body,
gear shaft, arm and a pair of rollers, and the rollers could adjust by an air
cylinder. The air cylinder controlled by electromagnetic valve.
Function
1) Pinch roll pinch the rolling piece while the crop shear crop the head of
rolling piece by signal send from HMD, it will not release until the rolling
piece be conveyed into block mill.
2) Pinch the rolling piece the whole rolling time
3) Pinch the tail of rolling piece
1.1 Pinch roll’s speed is 100%~120% of rolling piece’s speed, and the
pinch force could adjust according to motor’s output torque. The setting
pinch force make the motor get the max output torque when motor
speed is 10% of rated motor speed.
1.2 It will pinch the rolling piece immediately while accident happens, and
it should release the rolling piece when the problem is solved.
1.3 It could choose whether pinch the rolling piece the whole rolling time
or not when normally rolling.
1.4 It should pinch the head of rolling piece after a time delay when HMD
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 12 of 67
detect the head of rolling piece.
1.5 It could release the rolling piece after the rolling piece be conveyed into
block mill.
1.6 When the lubrication oil flow detected by oil flow indicator is lower
than 3L/min, the system alarms, and the pinch roller must stop when
alarm last 2 minutes. When the lubrication oil flow detected by oil flow
indicator is lower than 1.5L/min and last 30s, pinch roll must stop
immediately.
1.7 When the lubrication oil pressure detected by pressure gauge is lower
than 0.25Mpa, system alarms, and the pinch roll must stop when the
alarm last 2 minutes. When the lubrication oil pressure detected by
pressure gauge is lower than 0.15MPa and last 30s, pinch roll must stop
immediately.
1.8 When the pressed air pressure detected by pressure gauge is lower than
0.35Mpa, system alarms, and pinch roll must stop when the alarm last 2
minutes.
1.9 Vulnerable part list:
No. description type / model drawing No. / standards material Qty remarks
1 entrance duct HC2010-004 Q235 1 piece welded part
2 exit duct HC2010-005 Q235 1 piece welded part
3 ogalloy HC2010-002-16 iron-base 2 pieces
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 13 of 67
No. description type / model drawing No. / standards material Qty remarks
4 ogalloy HC2010-002-25 iron-base 4 pieces
5 ogalloy HC2010-002-29 iron-base 2 pieces
6 liner HC2010-002-34 ZQA19-4 4 pieces
7 roller HC2010-002-54 45/alloy 2 pieces
8 sealing ring HC2010-002-56 Fluoro-rubber 2 pieces
9 joint bearing UG30 GB304-64 3 pieces product
10 sealing ring PD70x95x12 HG4-696-67 1 piece product
11 bearing 46211 Φ55xΦ100x21 GB293-64 4 pieces product
12 O ring d=3.1 L=6900 GB1235-76 rubber 1-2 1 piece product
13 O ring Φ70x3.1 GB1235-76 rubber 1-2 4 pieces product
14 bearing 32514 Φ70xΦ125x70 GB283-64 2 pieces product
15 O ring Φ165x3.1 GB1235-76 rubber 1-2 4 pieces product
16 bearing 3511 Φ55xΦ100x25 GB286-64 4 pieces product
17 nozzle ZG3/4 PZ86908 2 pieces product
18 pressure relief valve PJ-L25-51 1 piece product
19 electromagnetic valve AC220V 25D2-25-L1 1 piece product
20 one-way throttle valve LA-L25-L1 2 pieces product
21 triple unit 398-293 1 piece product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 14 of 67
2. Crop shear Feature
Crop shear located between pre-finishing mill and block mill, it using for
rolling piece’s head cut, rolling piece’s tail cut and accident cut. Crop shear
adopt rotary structure and driven by a 112Kw motor through gear coupling
without mechanical braking. Two blades assemble on two parallel shafts
which connected by a pair of gears. The gear ratio is 1:1, and that makes
the two shafts as same rotary speed but reverse rotary direction. The blades
overlap and cut the rolling piece once a cycle driven by motor through the
gear coupling. After cutting, the shaft hold in the prepare position
controlled by proximity switch and the location detector on motor.
2.1 Crop shear could operate automatic or manually.
Manual: controlled by operator press buttons
Automatic: controlled by computer for non-link cut and accident cut
2.2 The blades hold the prepare position at 90°in coordinates, when get
the cut signal, the blades start clockwise rotary and speed-up to the
cutting speed according to the rolling speed. The rolling speed about
6 ~ 12 m/s is detected from the exit of pre-finishing mill, and the
cutting speed could add a adjustable overspeed to the rolling speed.
Blades depart from rolling piece before it get 30°in coordinates, then
start braking by motor. Blades go to the prepare position with creeping
speed (motor rotary speed about 50~60 rpm) with precision ±1°.
2.3 There are an oil flow indicator and a pressure gauge for the crop shear
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 15 of 67
to ensure the normally lubrication. It will alarm while the oil flow and
oil pressure are lower than the setting value.
2.4 Rolling piece’s head cutting
While HMD detect the rolling piece’s head, the pulser which located
between duct and pinch roll starts to work. When the pulse counter
achieves the setting value, the HMD send the signal to crop shear, and
the crop shear starts the cutting period. When blades cut the rolling
piece, the blades' speed is 5~20% faster than the rolling speed and
adjustable. After the rolling piece’s head is cut, the rolling piece goes
into the switcher which located after crop shear. The switcher is on the
“crop position” before the rolling piece head into the block mill through
side looper. As soon as rolling piece enter into the block mill, the
switcher turn to the “chop position” and get ready for chopping if the
accident happens. While the rolling piece tail depart from pinch roll and
rolling normally, switcher turn back to “crop position” and ready for cut
the rolling piece’s tail and cut next rolling piece’s head.
2.5 Rolling piece’s tail cutting
While HMD detect the rolling piece’s head, the pulser which locate
between duct and pinch roll starts work. When the pulse counter
achieves the setting value, the HMD send the signal to crop shear, and
the crop shear starts the cutting period. When blades cut the rolling
piece, the blades’ speed is equal the rolling speed even slower than the
rolling speed. The switcher is on the “crop position” and the cut off
piece being guided to the chute.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 16 of 67
2.6 Accident cut
Accident cut start by detecting system automatic or manual. The cut
speed should 5~15% faster than rolling speed while accident cut, and
the switcher should turn to the “chop position” and ensure guide the
rolling piece to the chopping shear. It should set the cut speed by pulpit
when manual setting.
2.7 Non-link cut
There is a button in the local box that could act the non-link cut when
permissible. It could finish once cut period after press the button once,
and the cut speed is set by pulpit. This function is for test run usually.
2.8 Installation and adjustment for crop shear
2.8.1 Installation: It should follow technical requirement on drawings and
listed standards:
(1) Metallurgical mechanical equipment installation and acceptance
check standard – General: YBJ201-83
(2) Metallurgical mechanical equipment installation and acceptance
check standard - Hydraulic, pneumatic and lubrication system:
YBJ207-85
(3) Metallurgical mechanical equipment installation and acceptance
check standard – rolling equipment: YB9249-93
The crop shear installation precision adopt class I
(4) The installation of electrical equipment on crop shear should follow
the national standards or profession standards.
2.8.2 Adjustment: the adjust must after equipment installed completely
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 17 of 67
and acceptance check qualified. The adjustment should follow the
drawing and list requirement:
(1) The gap between two blades should in 0.2 ~ 0.25 mm, and the
overlap of two blades should less than 0.75 mm. It should adjust the
gear backlash of gear first, then adjust the gap to 0.2 ~ 0.25 mm by
regrinding the washer. The overlap of blades should adjust by
regrinding the blade and adding washer.
(2) The adjustment for entrance and exit guide plate should ensure the
rolling piece enter and exit crop shear smoothly.
(3) Each rotary part should act smoothly, and could adjust the bearing
gap if necessary.
(4) It should ensure the oil distribution system distribute the oil to each
lubrication point with right flow, and make sure there is no jamming
and leakage.
(5) Driven the crop shear several cycles manually, and make sure that
the blades not crash.
2.9 Examination
location aim part / place state period way
box body leakage seal place working each shift Human’s eye
bearing working bearing working each shift hear voice and
measure the temperature
lubrication pipes
pressure and leakage
pressure gauge and pipes working each shift human’s eye
blade wear blade’s edge unworking each shift Human’s eye
blade gap between blades unworking each shift feeler gauge
blade loose or not bolt unworking each shift human’s eye
blade loose or not bolt unworking each shift human’s eye
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 18 of 67
location aim part / place state period way
gear wear tooth face unworking half a year human’s eye
2.10. Vulnerable parts list
No. description model / specification
drawing No./ standard material Qty remarks
1 blade HB2100-007-04R 5cr5WM。Vsi
2 pieces
2 bearing 3053720 Φ100xΦ165x52 GB288-87 4
pieces product
3 sealing B170x200x15 GB9877.1-88 rubber I-1 3 pieces product
4 bearing 240308 Φ150xΦ225x75 NTN 2
pieces product
5 bearing 3003130 Φ150xΦ225x56 GB288-87 2
pieces product
6 sealing B22x40x7 GB9877.1-88 rubber I-1 1 piece product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 19 of 67
3. Switcher
Feature
Switcher located after crop shear and guides the rolling piece to side looper
while normally rolling and guide to chopping shear while accident happens.
Switcher consists of switcher body and air cylinder.
3.1 Switcher has two working positions, one is “crop position”, and another
is “chop position”, and switch position by a change valve. The rolling
piece will be guided to side looper while switcher is on “crop position”,
and will be guided to chopping shear while switcher is on “chop
position”. There are two proximity switches to detect the switcher’s
working position.
3.2 Vulnerable part list:
No. description model / specifications material quantity remarks
1 bearing 311 Φ55xΦ120x29 1 product
2 bearing 314 Φ70xΦ150x35 1 product
3 air cylinder JB160x80-S 1 product
4 scraper seal FA80x90x6.3 1 product
5 one-way throttle valve LA-L20-L1 2 product
6 electromagnetic valve 25D2-20-L1 1 product
7 triple-unit 399-283 product
8 muffler (M27x2) X5-L20-L1 2 product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 20 of 67
4. Chopping shear
Feature
Chopping shear chop the rolling piece while accident happens after
chopping shear on rolling line. Chopping shear consist of shear body and
motor. Three blades on both the blade base, that makes 3 cut while the shaft
run a cycle. The pinch roll on chopping shear driven by shaft through belt,
and pinch act by air cylinder.
4.1 Chop the rolling piece come from crop shear while accident happens.
4.2 Three blades on both the blade base, that makes 3 cut while the shaft
run a cycle. The pinch roll on chopping shear driven by shaft through
belt, and pinch act by air cylinder.
Chopping length: 260mm
Diameter of rotary blade: 380mm
4.3 Pulpit, MMI and local box near CT could control chopping shear, and
should have list functions
a. Pinch roll on chopping shear start button with lamp
b. Pinch roll on chopping shear stop button with lamp
c. Chopping shear start button with lamp
d. Chopping shear start bottom with lamp
4.4 Control and interlock
Chopping shear could operate automatic or manually.
Manual: controlled by operator press button
Automatic: controlled by computer with non-link cut and accident cut
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 21 of 67
4.4.1 Control
In manual model, chopping shear start by pressing the start button and
stop by pressing the stop button. The cutting speed is controlled by the
“speed-up / stop / speed-down” knob.
In automatic model, chopping shear start by pressing the start button
and will not stop while rolling. The cutting speed is same as the crop
shear’s cutting speed, which means cutting speed is faster 5-15% than
the rolling speed.
4.4.2 Interlock
A. When the lubrication oil pressure is lower than 0.3Mpa, the system
alarms, and block mill must stop when alarm last 2 minutes. When
the lubrication oil pressure is lower than 0.25Mpa and last 30s, block
mill must stop immediately.
B. When the lubrication oil flow is 0 and last 30s, block mill must stop.
C. When the pressed air pressure is lower than 0.3Mpa, system alarms,
and block mill must stop when alarm last 2 minutes. When the
pressed air pressure is lower than 0.25Mpa and last 30s, block mill
must stop immediately.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 22 of 67
4.5、Vulnerable part list:
No. description model / specifications Qty material drawing No. /
standard remarks
1 blade 6 5Cr5WMoVSi HB2200-024R
2 sealing PD125x60x4 2 JB2600-80 product
3 O ring Φ210x7 2 JB/ZQ4224-86 product
4 bearing 3053222
Φ110xΦ200x69.8
2 GB288-87 product
5 bearing 53518 Φ90xΦ160x40
2 GB288-87 product
6 air cylinder Φ160xS40 1 JB1448-74 product
7 belt B-13700mm 6 GB11544-89 product
8 bearing 53516 Φ80xΦ140x33
4 GB288-87 product
9 O ring Φ140x5 4 rubberⅠ-4 GB3452.1 product
10 sealing PD125x50x2 2 JB2600-80 product
11 O ring Φ170x6 4 rubberⅠ-4 JB/ZQ4224-86 product
12 O ring Φ160x5 2 rubberⅠ-4 GB3452.1 product
13 sealing PD100x30x2 2 JB2600-80 product
14 sealing PD70x50x2 2 JB2600-80 product
15 signaler YXG-20 0.5KW
1 GB/ZQ4596-86 product
16 indicator GZQ-10 2 GB/ZQ4597-86 product
17 one-way throttle valve
LA-L10-S1 2 product
18 electromagnetic valve
K25D-10 1 product
19 muffler XS-L10-L1 2 product
20 triple-unit 399-253 1 product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 23 of 67
5. Side looper
Feature
Side looper located between crop shear and block mill, it could provide
non-tension or micro-tension for rolling, and also provide a buffer space for
rolling piece. Looper consist of form roller, guide roller, looper body and
loop scanner, the looper acted by air cylinder and controlled by loop
scanner. Form roller has two positions, one is working position, and
another is unworking position. Rolling piece could go through the looper
straight while the form roller is on unworking position. Form roller will
cross the rolling line when turn to working position from unworking
position, and make rolling piece form a loop. The loop will be formed
while the rolling piece’s head into the block mill with right speed setting.
5.1 Form roller control
The form roller be controlled by signal send from detector at upstream
(such as looper scanner, HMD), and it should set the advance. The
automation system sends the delay signal according to the rolling speed.
Form roller could also controlled manual with “reach” and “regain”
button.
Form roller must stay at the unworking position until rolling piece’s
head into the block mill, it must turn to working position immediately
while the rolling piece’s head into the block mill. Form roller must stay
at the unworking position while accident happens at looper.
Form roller must stay at the working position until the rolling piece’s
tail depart from the block mill, and must turn to the unworking position
immediately while rolling piece’s tail depart from the block mill. It may
cause the loop fall down, rolling piece enter the guide after looper
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 24 of 67
overlapped and accident if form roller turn to unworking position while
rolling piece still in block mill.
5.2 Forming automatic control
Forming controlled by loop scanner and loop adjuster, loop scanner
detects the forming situation and generate location signal. This location
signal is compared with the base valve in the loop adjuster and get
deviation signal, and the deviation signal be transformed to speed signal.
Controlled by the speed signal, rolling speed be adjusted to make the
forming as a setting value.
5.3、 Vulnerable part list:
No. description quantity material drawing No. remarks
1 air cylinder 1 HC3001-021
2 roller assembly (1) 2 HC3001-034
3 roller assembly (2) 1 HC3001-035
4 form roller assembly 1 HC3001-036
5 roller assembly (3) 1 HC3001-038
6 roller assembly (4) 1 HC3001-039
7 one-way throttle valve 2 KLA-L25 product
8 electromagnetic valve 1 K25D2-25 product
9 muffler 2 FXS-L25 product
10 triple-unit 1 398-293 product
11 nozzle 2 Q235A HC3001-041-01
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 25 of 67
6. Snap shear
Feature
Snap shear located after the side looper. It will cut off the rolling piece
when block mill or equipment after block mill failure to prevent rolling
piece into the block mill. It also prevents the rolling piece into the block
mill for safety when protecting jacket for block mill is open. Snap shear
have two blades and the cutting acted by air cylinder. There is a spring in
the cylinder for cutting in case of non-pressure and a proximity switch in
the cutting position.
6.1 Control and operation
Snap shear could work manually by pulpit and local box or automatic.
In manual model, snap shear cut by press “close” button and release by
press “open” button.
6.2 Interlock
6.2.1 Snap shear must not open while any of list situation happens when
automatic model.
(1). Main motor for block mill is power off.
(2). Block mill lubrication system is failure.
(3). Air-oil lubrication system for entrance guide is failure.
(4). Protecting jacket for block mill is open.
(5). There is no flow of cooling water for roller or low pressure of
cooling water for roller.
(6). Protection jacket for laying head is open.
6.2.2 Snap shear could open while the all list situation are satisfied.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 26 of 67
(1). Protecting jacket for block mill is closed.
(2). Oil lubrication system for block mill is working normally.
(3). Air-oil lubrication system is working normally.
(4). Main motor for block mill is working normally.
(5). The situation of coiling water for roller is normal.
(6). Block mill is working normally, cobble detector is normal.
(7). Pinch roll before laying head and laying head are working normally.
(8). The “open” button be pressed.
6.2.3 Snap shear will stop when any of list situations happens when
automatic model:
(1). The “close” button be pressed.
(2). Main motor for block is stop or the rotary speed is slower than 200
rpm
(3). The motor for lubrication shut off suddenly or the pressure of oil is
low.
(4). Pinch roll before laying head is stop.
(5). The situation of cooling water for roller is abnormal.
(6). Protecting jacket for block mill is open.
(7). Accident happens in block mill.
(8). Block mill is abnormal.
(9). The cooling roller table is stop.
6.3 Interlock to other equipment
6.3.1 Protecting jacket for block mill must not open until the snap shear is
close. Snap shear must not open until protecting jacket for block mill
is close.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 27 of 67
6.3.2 Protecting jacket for laying head must not open until the snap shear
is close. Snap shear must not open until protecting jacket for laying
head is close.
6.3.3 The form roller in looper must stay the unworking position when
the snap shear is close.
6.3.4 The extractor must not eject the billet from the furnace when the
snap shear is close.
6.4 Control
While the accident happens at downstream in automatic model, the
chopping shear should chop the rolling piece and the snap shear should
cut the rolling piece. It should follow list process:
6.4.1 Snap shear must not close until chopping shear works.
6.4.2 Snap shear could close after chopping shear works 2s later. And this
time is adjustable.
6.4.3 Above process suit for manual model while press the “close” button
meanwhile HMD detect the rolling piece.
6.5 Vulnerable part list:
No. description Qty material Drawing No. remarks
1 Air cylinder 1 HC3002-008
2 Blade 2 5Cr5WMoVSi HC3002-013
3 ogalloy 4 Iron-base HC3002-024
4 electromagnetic valve 1 25ZVD-L15-L1 product
5 Muffler 2 XS-L15-L1 product
6 Triple-unit 1 398-263 product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 28 of 67
7. Block mill
Feature
Rolling piece be rolled by 8 stands heavy duty no-twist mill (Block mill)
from Φ13~Φ20 to product Φ5.5~Φ12. The design speed is 60m/s and the
guarantee speed is 50m/s.
These central driven 8 stands adopt 45° top cross structure, them consist of
3 stands of Φ200 which roller ring’s dimension is Φ210.5 / Φ189.5 ×
72mm and 5 stands of Φ150 which roller ring’s dimension is Φ158.75 /
Φ142.91 × 62mm. The last 2 stands of Φ150 are high speed stand. Block
mill consist of 8 stands, speed-up gear box, base plate, gear coupling, water
fender, protecting jacket and so on. The stands consist of gear boxes and
bevel gear boxes, and the roller is cantilever structure.
7.1 Feature for structure
7.1.1 Block mill consist of 3 stands of Φ200 and 5 stands of Φ150, and
that reinforce the intensity.
7.1.2 The last 2 stands of Φ150 are super-high speed stand, could increase
the exit speed and the guarantee speed could achieve 50m/s.
7.1.3 Stands adopt 45°top cross structure, which increase the stability
and decrease the equipment’s weight, and that make the operation and
maintenance easier.
7.1.4 The neighbor stands arrange 90°(perpendicular) to each other,
which makes the no-twist rolling.
7.1.5 The roller adopt cantilever structure, and using the taper sleeve to
fix the roller ring in the shaft end. The gear box using eccentric
mechanism which has oil-film bearing and roller shaft to adjust the
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 29 of 67
roller gap.
7.1.6 Bevel gear box consist of body, driving shaft, bevel gear pair, and
synchronous gear pair. All gears are hard tooth gear with grade 5
precision to ensure the stable working in high speed.
7.1.7 Gear box and bevel gear box are connected with bolts. During
assembling, insert the head of bevel gear box to the gear box, make
sure two heads and two roller shaft gears mesh with each other.
7.1.8 By using the thrust bearing, could settle the roller shaft’s axial float
problem and ensure the dimensional precision of product
7.1.9 Adjustment of roller gap is realized with a screw bar with left and
right screw-thread, which will make the eccentric mechanisms rotate
in different direction, and the roller gap will change by the eccentric
movement of the eccentric mechanism relative to the rolling line, and
the location of the original rolling line and the guide are maintained.
7.1.10 The roller ring is made of tungsten carbide, and it is connected to
the shaft of roller through the taper sleeve. It should be reload with
special hydraulic tool, which makes the reload process easy and fast.
7.2 Assembling and test run
Rolling stand and other parts assemble at manufactory, it should follow
the standard YB/T036.18-92 and technical requirement on drawings.
Them will not allow to leave the factory until them pass the no-load test
run.
7.2.1 Preparation
1) Clean the parts, remove the dirty and rust, dredge the pipes and holes,
coat with rust preventative oil.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 30 of 67
2) Check the dimensional tolerance of fitting parts.
3) Prepare the measures and tools.
4) Mark the each stand’s number on because of the different ratio.
7.2.2 Stand assembling
1) bevel gear box
The assembling of bevel gear and shaft suggest adopt the pressing fit
because of the small range of interference and the disassembling
suggest adopt extracting. Adjust the contact pattern and backlash
carefully while installing the bevel gear. Increasing contact pattern
and suitable backlash will extend the gear’s life.
2) Oil-film bearing assembling
Heat the eccentric sleeve to 120℃, cool the bearing bush to -80℃ in
dry ice or liquid nitrogen.
Correspond the separation line of bearing bushes with the mark line
on the eccentric sleeve, and align the oil hole on bearing bush and oil
hole on the eccentric sleeve..
Push the bearing bushes into the eccentric sleeve with the guiding of
taper guide sleeve.
Check the alignment of oil hole on the bearing bush and oil hole on
the eccentric sleeve, make sure there is no damage on bearing
bushes.
3) Rolling bearing assembling in stands
The rolling bearing used in gear box and bevel gear box are all high
speed bearing made by MRC. The assembling of rolling bearing and
shaft suggesting the different temperature method.
The rolling bearing on roller shaft is thrust ball bearing, its backlash
should be 0.012~0.038 mm to guarantee the rolling product’s quality.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 31 of 67
4) Assembling and disassembling the roller ring
It should using assembly tools with 22.5MPa pressure for
assembling the roller ring.
It should using disassembly tools with <60MPa pressure for
disassembling the roller ring.
5) Other
There must no beating to the shaft shoulder and end of baffle ring
which using for axial locating while assembly.
It should adjust the axial compressing suitably for sealing ring in the
roller’s neck area, make sure not too tight cause the damage of the
sealing ring and not too loose cause leakage.
All lubrication pipes should be firm and will not be crashed by the
rotary parts. The lubrication pipes must lubricate the gears and
bearings well.
It should check the list dimensions and satisfy the requirements after
assembling
Φ200 stand Φ150 stand
A 836.6±0.08 836.6±0.08
B 432±0.06 380±0.012
C、D C≠D:<0.1mm
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 32 of 67
7.2.3 Block mill assembling
1) Assembling order
Install the base plate, speed-up gear box and main motor on their
position.
Install the No.1 – No.8 stands on the their position.
Install the coupling between motor and speed-up gear box, coupling
between speed-up gear box and No.7 stand, coupling between
speed-up gear box and No.8 stand and couplings between each
stands. Adjust the location accurately of main motor, speed-up gear
box and stands, then fasten all parts.
Install the water fender and buffer box.
Install the cobble detecting device.
Install the protecting jacket for block mill.
Install the pipes for oil lubrication, hydraulic system and cooling
water.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 33 of 67
2) Guarantee after assembling
Gradient of coupling’s both ends should less than 1/2000, radial
displacement should less than 0.06mm. The long shaft’s proper
alignment on whole length should less than 0.08mm after couplings
between stands be installed.
The displacement of the center line should less than Φ0.1mm for
neighbor stand, and should less than Φ0.3mm for whole stands.
7.2.4 No-load test run for single stand
1) It should driven by human’s hand firstly for each stand and speed-up
gear box after assembling, and make sure all parts run smoothly. The
adjustment of roller gap should flexible.
2) Each stand install on the base plate and connect with test run motor
after hand driving. The rotary speed of stand’s input shaft is 1000
r/min and last for 3 hours after all lubrication pipes be connected.
Check the joggling voice of gear, the contact pattern and backlash,
the temperature rise of oil-film bearing, and the leakage situation of
sealing places.
3) The roller should be cooled by cooling water while test run.
4) To make sure the lubrication oil volume is ~100 L/min,oil pressure is
0.35MPa, filter precision is 10μ and oil temperature is ~38℃ for
each stand.
5) Speed-up gear box connect with test run motor after hand driving.
The rotary speed of input shaft is 1000 r/min and last for 3 hours
after all lubrication pipes be connected. Check the joggling voice of
gear, the contact spot and backlash, the temperature rise of oil-film
bearing, and the leakage situation of sealing places.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 34 of 67
6) To make sure the lubrication oil volume is ~200 L/min,oil pressure is
0.35MPa, filter precision is 10μ and oil temperature is ~38℃ for
speed-up gear box.
7.2.5 No-load test run for block mill
It should run no-load test run after block mill assembling.
1) Necessary condition for block mill’s test run
All oil lubrication points get oil supply according to the requirement
of pressure, oil flow, temperature, cleanliness, and oil grade.
Apply lubrication grease on each coupling
Apply lubrication grease on all lubrication surfaces
Supply cooling water onto the roller.
Close protecting jacket while the test run.
2) Scheme of test run
Test run procedure: start manual operation first, then switch to auto
mode; stepping movement before continuous movement; low speed
running at first, then switch to middle speed and high speed.
No-load test run of the equipment should last for 4 hours
continuously for min.
Equipment and components should shuttle 5~10 times in stroke
range.
Adjustment region should be tested 5 times each for min.
3) Requirement for test run
Rotary speed of the speed-up gear box’s input shaft should be 1000
r/min during the test run.
Vibration strength of the block mill should be lower than 4.5mm/s.
Noise level should be lower than 85dB (checked at 10m length of the
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 35 of 67
block mill).
Temperature rise of each rolling bearing should be lower than 40 , ℃
and the highest temperature of each rolling bearing should not
exceed 80 .℃
There should be no oil leakage and water penetration.
7.3 Operation before DC motor start
7.3.1 Check the signals of lubrication system, cooling system, electrical
system, pneumatic system and so on. Check the pressure, flow,
temperature, cleanliness, oil grade, oil situation of lubrication system.
7.3.2 Apply lubrication grease on each coupling
7.3.3 Apply lubrication grease on all lubrication surfaces
7.3.4 Supply cooling water onto the roller.
7.3.5 Check the grooves’ abrasion and adjust them.
7.3.6 Make sure all guides clean, check the guide roller’s rotary situation.
7.3.7 Make sure the guides’ center line correspond with the rolling line.
7.3.8 Check the situation of cooling water for groove and nozzle’s
position.
7.3.9 Check the function of control system.
7.3.10 Check the alarm system, controlled by the pulpit.
7.3.11 Check the hydraulic system, and the interlock function to other
equipment.
7.3.12 Check the operation of cooling water system.
7.3.13 Check the leakage. (oil lubrication system, cooling water system,
hydraulic system, grease lubrication system and so on)
7.3.14 Make sure the parameters’ setting follow the rolling schedule list.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 36 of 67
7.3.15 DC motors could adjust speed in cascade model. The rolling speed
is accordant with the setting.
7.3.16 Protecting jacket is safe and trustworthy. It is close while rolling.
After all mentioned operations be done, the DC motor could start.
7.4 Operation while running
7.4.1 Stepping movement before continuous movement; low speed
running at first, then switch to middle speed and high speed.
7.4.2 Make sure the tension situation is normal, and check the situation of
cascade control and motor’s current.
7.4.3 Make sure the vibration intensity of block mill should ≤ 4.5mm/s.
7.4.4 Check the situation of rollers and guides, adjust the guides’ center
correspond with the rolling line.
7.4.5 Make sure the roller’s axial and radial adjustment smoothly.
7.4.6 Make sure the grooves and guides be cooled well.
7.4.7 There must no leakage and infiltration in joints, pipes and sealing
places.
7.4.8 The noise must ≤ 85dB (10m far away).
7.4.9 The temperature rise must ≤ 40℃, and the max temperature must
≤ 80℃
7.4.10 Check the situation of oil lubrication and air-oil lubrication every
1~2 hours.
7.4.11 It should stop the cooling water supply before stop the equipment
and stop the supply of oil lubrication and air-oil lubrication after
equipment been stopped 5 minutes.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 37 of 67
7.5 Vulnerable part list
7.5.1、Φ200 gear box(HB3111-000)
No. Description model/material Qty Drawing No. remark
1 Half bushing of oil-film bearing 172050JA Load-bearing end 6 MRC
2 Half bushing of oil-film bearing 172050KA Unload-bearing end 6 MRC
3 Half bushing of oil-film bearing 172050A Load-bearing end 6 MRC
4 Half bushing of oil-film bearing 172050B Unload-bearing end 6 MRC
5 Protecting sleeve 2Gr13 6 HB3111-022
6 O ring Oil resistant and high-temperature
resistant rubber Ⅲ-2 6 GB3452.1-82
7 Sealing ring Oil resistant and high-temperature
resistant rubber Ⅲ-2 12 HB3111-037
8 O ring 25×3.55 Oil resistant and high-temperature
resistant rubber Ⅲ-2 16 GB3452.1-82
9 O ring 195×3.55 Oil resistant and high-temperature
resistant rubber Ⅲ-2 6 GB3452.1-82
10 O ring 185×3.55 Oil resistant and high-temperature
resistant rubber Ⅲ-2 6 GB3452.1-82
11 washer Oil resistant rubber asbestos plate
3 HB3111-0012
12 Damping washer Product 12 HB3111-011
13 Sealing 38×56×12 Oil resistant and high-temperature
resistant rubber Ⅲ-2 6
7.5.2、Φ150 gear box(HB3112-000)
No. description Model/material Qty Drawing No. remarks
1 Half bushing of oil-film bearing 172050E Load-bearing end 10 MRC
2 Half bushing of oil-film Unload-bearing 10 MRC
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 38 of 67
No. description Model/material Qty Drawing No. remarks
bearing 172050FB
3 Half bushing of oil-film bearing 172050A Load-bearing end 10 MRC
4 Half bushing of oil-film bearing 172050BB Unload-bearing 10 MRC
5 Cover (protecting sleeve) ZG1Cr17Ni2 10 HB3112-001
6 O ring 28×3.1 Oil resistant and high-temperature
resistant rubber Ⅲ-2 10 GB3452.1-82
7 Reinforce sealing ring assembly 10 GB9877.1-88
8 Sealing ring Oil resistant and high-temperature
resistant rubber Ⅲ-2 10 HB3112-019
9 O ring 140.6×2.2 Oil resistant and high-temperature
resistant rubber Ⅲ-2 10 GB3452.1-82
10 O ring 88.9×2.2 Oil resistant and high-temperature
resistant rubber Ⅲ-2 10 GB3452.1-82
11 Asbestos pad Oil resistant rubber asbestos plate
5 HB3112-022
12 Washer assembly 20 HB3112-010
7.5.3、couplings between stands
No. description material Qty Drawing No. remark
1 coupling (1) assembly 6 HB3115-000
2 coupling (2) assembly 1 HB3116-000
3 coupling (3) assembly 1 HB3116-000A
7.5.4、Stand
No. description Model/material Qty Drawing No. remark
1 Entrance duct(1) Welded part 1 HB3117-001
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 39 of 67
No. description Model/material Qty Drawing No. remark
2 Exit duct(1) Welded part 2 HB3117-018-03
3 Exit duct(2) Welded part 2 HB3117-018-06
4 Guide duct(1) 16Mn 1 HB3117-018-01-01
5 Guide duct (2) 16Mn 1 HB3117-018-01-02
6 Guide duct (3) 16Mn 1 HB3117-018-01-07
7 Guide duct (4) 16Mn 1 HB3117-018-01-08
8 Lower guide duct(1) QT600-3 1 HB3118-005
9 Upper guide duct (1) QT600-3 1 HB3118-006
10 Lower guide duct (2) QT600-3 1 HB3118-009
11 Upper guide duct (2) QT600-3 1 HB3118-008
12 Hose unit 25Ⅰ-1100 A 8 JB1885-77 cooling
13 Hose unit 38Ⅲ-1800 8 JB/T6142.1-92 lubrication
14 Hose unit 25Ⅲ-2000 8 JB/T6142.1-92 lubrication
15 Pressure gauge YX-100 21 lubrication
16 Pressure gauge switch KF-L8/20E 21 lubrication
17 Hydraulic cylinder C25ZB100/70 2 Protecting jacket
18 Proximity switch YB-D-C20L 2 Protecting jacket
19 bearing XQZD-050 8 0-1MPaDC24V Protecting jacket
7.5.5、Speed-up gear box
No. description Model/material Qty Drawing No./ standard remark
1 Rolling bearing 6226 2 SKF
2 Rolling bearing N128VAA 4 ROIIWay
3 Rolling bearing QJ234N2 1 SKF
4 Rolling bearing NU234EC 1 SKF
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 40 of 67
No. description Model/material Qty Drawing No./ standard remark
5 Rolling bearing NU1040 1 SKF
6 Rolling bearing NU228EC 2 SKF
7 Rolling bearing QJ228N2 1 SKF
8 O ring 38.7x2.65 1 GB3452.1-82 butadiene-nitrile rubber
9 Pressure relief valve PJ-25-S1 1 pneumatic
pipes
10 Electromagnetic valve 22JD-25-Wx1 1 pneumatic
pipes
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 41 of 67
8. Pinch roll before laying head and laying head
Feature
Pinch roll before laying head and laying head located after the cooling
water box. Rolling piece be pinched into the laying head by pinch roll
before laying head and be laid onto the cooling roller table as Φ1080mm
coils by laying head’s movement.
Pinch roll before laying head and laying head are independent equipments
to another. Pinch roll before laying head located before the entrance of
laying head.
The pinch rollers are cantilever structure, and arranged horizontally.
Rolling piece could be pinched and released by upper roller and lower
roller acted by a pneumatic cylinder through a link mechanism. The rollers
are driven by a DC motor through a gear box. The open width for rollers is
adjustable, and the body of pinch roll is welded. The gears, oil-film
bearings and high-speed rolling thrust bearing are lubricated by centralized
lubrication. While normally working, the pinch roller always rotary with
the speed set according to the rolling technology. Pinch roll could pinch the
rolling piece’s head, rolling piece’s tail and the rolling piece whole the time
according to the rolling technology.
Laying head is inclined 10°to horizontal. It consists of laying pipe which
fixed on the rotary hollow shaft unit and transmission unit. The hollow
shaft unit is driven by DC motor through a pair of bevel gears. The laying
pipe rotary with setting speed and lay the coils out with satisfied size.
Rotary hollow shaft unit consist of hollow shaft and pipe support
assembly which used to fix the laying pipe. Hollow shaft is driven through
bevel gear. There has sleeve unit between the hollow shaft and duct which
in the hollow shaft, the sleeve unit could cool the duct and prevent the heat
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 42 of 67
from rolling piece to the bearings on the hollow shaft.
The gear box is welded structure, the gears and bearings which in the gear
box are lubricated by centralized lubrication.
Protecting jacket of laying head is outside of the pipe support assembly. It
is barrel structure and incline 10°to horizontal same as the laying head.
The upper part could open by hydraulic cylinder when change the laying
pipe. But the upper part must close when normally working.
It should do the static balancing test first for the rotary hollow shaft unit
and parts which assembled on the rotary hollow shaft. According the test
result, adjust the balance of shaft assembly. Then do the dynamic balancing
test with rotary speed 2000r/min, the precision of dynamic balance should
≥ grade G2.5. Do the test run after equipment assembling. Measure the
vibration at the front bearing cover and the back bearing cover, make sure
the vibration both are ≤ 5mm/s.
After the adjustment, weld the stop dog on the base plate to keep the laying
head’s gear box.
8.1 Assembling and test run
Pinch roll before laying head and laying head assemble at manufactory,
it should follow the standard JB/T5000.10-1998, standard
JB/T5000.11-98 and technical requirement on drawings. Them will not
allow to leave the factory until them pass the no-load test run.
8.1.1 Preparation
1) Clean the parts, remove the dirty and rust, dredge the pipes and holes,
coat with rust preventative oil.
2) Check the dimensional tolerance of fitting parts.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 43 of 67
3) Prepare the measures and tools.
8.1.2 Assembling
1) Bevel gear assembling
The assembling of bevel gear and shaft suggest adopt the pressing fit
consider of the small range of interference, and the disassembling
suggest adopt extracting.
Adjust the contact area and backlash carefully while installing the
bevel gear. Increasing contact pattern and suitable backlash will
extend the gear’s life. The backlash should be Cn=0.30~0.592mm,
and the contact pattern should ≥ 75%.
2) Oil film bearing assembling for upper roller
Heat the shaft sleeve of upper roller to 120℃, and cool the bearing
bush to -80℃ with dry ice or liquid nitrogen.
Correspond the separation line of bearing bushes with the mark line
on the eccentric sleeve, and align the oil hole on bearing bush and oil
hole on the eccentric sleeve..
Push the bearing bushes into the eccentric sleeve with the guiding of
taper guide sleeve.
Check the alignment of oil hole on the bearing bush and oil hole on
the eccentric sleeve, make sure there is no damage on bearing
bushes.
3) Rolling bearing assembling
The rolling bearing be used in gear box made by FAG, MRC, SKF.
The assembling of rolling bearing and shaft suggesting the different
temperature method.
The rolling bearing on roller shaft for pinch roll is thrust ball bearing,
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 44 of 67
its backlash should be 0.012~0.038 mm to guarantee the rolling
product’s quality. The axial float should ≤0.05mm, and the radial
runout should≤0.08mm.
8.1.3 Assembling and disassembling the roller
1) It should using assembly tools with 22.5MPa pressure for assembling
the roller ring.
2) It should using disassembly tools with <60MPa pressure for
disassembling the roller ring.
3) It should use the special tool for assembling and disassembling.
8.1.4 Other
1) There must no beating to the shaft shoulder and end of baffle ring
which using for axial locating while assembly.
2) It should adjust the axial compressing suitably for sealing ring in the
upper roller’s neck area, make sure not too tight cause the damage of
the sealing ring and not too loose cause leakage.
3) All lubrication pipes should be firm and will not be crashed by the
rotary parts. The lubrication pipes must lubricate the gears and
bearings well.
8.1.5 No-load test run
1) It should driven by human’s hand firstly after assembling, and make
sure all parts run smoothly. The adjustment of roller gap should
flexible.
2) The rotary speed are 1500 r/min for pinch roll and laying head both,
and last for 3 hours after all lubrication pipes be connected. Check
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 45 of 67
the joggling voice of gear, the contact pattern and backlash, the
temperature rise of oil-film bearing, and the leakage situation of
sealing places.
3) The roller should be cooled by cooling water while test run, and the
water flow should ≥ 6.75Ton/h
4) To make sure the lubrication oil volume is ~50 l/min,oil pressure is
0.35MPa, filter precision is 10μ and oil temperature is ~38℃ for
pinch roll and laying head both.
8.1.6 No-load test run
It should run no-load test run after pinch roll before laying head and
laying head assembling.
1) Necessary condition for test run
All oil lubrication points get oil supply according to the requirement
of pressure, oil flow, temperature, cleanliness, and oil grade.
Apply lubrication grease on each coupling
Apply lubrication grease on all lubrication surfaces
Supply cooling water onto the roller.
Close protecting jacket while the test run.
2) Scheme of test run
Test run procedure: start manual operation first, then switch to auto
mode; stepping movement before continuous movement; low speed
running at first, then switch to middle speed and high speed.
No-load test run of the equipment should last for 4 hours
continuously for min.
Equipment and components should shuttle 5~10 times in stroke
range.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 46 of 67
Adjustment region should be tested 5 times each for min.
3) Requirement for test run
Rotary speed of the pinch roll before laying head and laying head
should be 1500 r/min during the test run.
Vibration intensity of the block mill should be lower than 5mm/s.
Noise level should ≤ 85dB (checked at 10m far away from
equipment). (noise level should ≤ 105dB at 1m far away from
equipment)
Temperature rise of each rolling bearing should be lower than 40 , ℃
and the highest temperature of each rolling bearing should not
exceed 80 .℃
There should be no oil leakage and water penetration.
8.2、Vulnerable part list
8.2.1. Vulnerable part list for pinch roll before laying head(HC4100-000)
No. description Qty Material / specific Drawing No. Remark
1 O ring 87.5×2.65 4 SF7433 GB3452.1-82 2 O ring 185×3.55 1 HN7443 GB3452.1-82 3 O ring 132×3.55 1 HN7443 GB3452.1-82 4 O ring 30×2.65 1 JM7443 GB3452.1-82 5 6″ oil-film bearing 2 Product 7381651 MRC 6 6″ oil-film bearing 2 product 7381652 MRC 7 Reinforce sealing
B90.120.12 1 SN7443 GB9877.1-88
8 Electromagnetic valve
2 23JD-24V Product
9 Pressure relay 1 HED10A-20/5 Product 10 Cooling nozzle 2 HC4100-006-05R Welded part
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 47 of 67
8.2.2. Vulnerable part list for laying head(HC4200-001)
No. description Qty Material / specific Specific / drawing
No.
Remark
1 O ring 1 515X7 Oil resistant rubber GB3452.1-82 2 Rubber plate 1
2.5X280X500 Oil resistant rubber
plate GB5574-85
3 O ring 1 307X7 RubberⅠ-1 GB3452.1-82
4 O ring 2 95X2.65 RubberⅠ-1 GB3452.1-82
5 O ring 1 487X7 Oil resistant rubber GB3452.1-82
6 O ring 1 307X7 Oil resistant rubber GB3452.1-82
7 Sealing 1 PG85X110X12 Oil resistant rubber JB7600-80
8 O ring 1 175X5.3 Oil resistant rubber GB3452.1-82
9 O ring 2 60X3.1 RubberⅠ-4 JB/ZQ4433-86
10 O ring 1 Φ106x2.65 neoprene Product
11 O ring 1 Φ400x5.30 neoprene Product
12 Bearing 1 568906 FAG 400x500x46
13 Bearing 1 N226EC SKF 130x230x40
14 Bearing 2 7040MPUA FAG 200x310x51
15 Reinforce
sealing
1 110x140x15 Product
16 Sealing 1 GVA002000 NBR 180x15x25
17 Reinforce
sealing
2 GSC30130 NBR 130x160x15
18 O ring 1 25x2.5 NBR GB3452.1-82
19 spring 6 65 Mn HC4200-001-47 Nonstandard part
8.2.3. Vulnerable part list for protecting jacket for laying head
(HC4100-000)
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 48 of 67
No
.
description Qty Material / specific Drawing No. /
standard
Remark
1 Pneumatic cylinder
QGBⅡ
1 200x610-MP2 Product
2 Bearing 30E 1 8x38x45 FZ1360 Product
3 Joint bearing 1 GE45DS GB9163-90 Product
4 Bearing 60G 2 7x70x60 FZ1360 Product
5 One way throttle valve 2 KCA-L20 (pneumatic) Product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 49 of 67
9. Cooling roller table
Feature
The chain type cooling roller table convey the coils to reform station. It
could use the standard cooling model and retarded cooling model to cool
the coil.
Standard cooling model: faster convey speed with blowers;
Retarded cooling model: slower convey speed without blower.
This chain type cooling roller table adopt standard cooling model, and
convey the Ф1200mm~Ф1250mm coil formed by laying head to the
reform station uniformly.
By adjusting the air volume and quantity of blowers, cool the coil to get
coil which satisfy the requirement.
The 7 sections are entrance section (1 set), main cooling section (5 sets)
and exit section (1 set).
Each section driven by a VVVF motor independently through chain.
Each section’s roller could adjust speed independently.
The rollers supported by bearing supports.
The entrance section which next the laying head supported by an elevator
with motor. The angle of rake of roller table could adjust by elevation of
elevator, to get the suitable form of coil. The elevation stroke is 200mm,
and be controlled by 2 sets of proximity switch which located at the highest
position and lowest position to prevent damage by incorrect operation.
There are 2 steps in main cooling section, the step height is 250mm. The
step makes the coil’s tensile strength uniformity.
There have a independent blower with motor for both 1st and 4th section in
main cooling section.
There have 3 independent blowers with motor for 2ed and 3rd section.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 50 of 67
There has no blower for 5th section (retarded cooling zone)
Blowers connect to cooling roller table through air chambers.
The exit section which before reform station has wheels and is supported
by rails. The exit section could traverse that driven by a pushing rod with
motor to adjust the distance between end of exit section and coil collecting
device’s center. The traversing stroke is ±150mm. The side aprons which
on the exit section could align the coil’s center and the roller table’s center,
to ensure the coil fall into the coil collecting device smoothly.
The coil pressing device located at the end of exit section could make sure
the coil fall into the coil collecting device horizontally. A proximity switch
connected with the signal rod on cantilever could send the signal of coil’s
head and tail coming.
9.1 Preparation
9.1.1 Make sure all lubrication points be lubricated
9.1.2 Make sure all proximity switches work normally
9.1.3 Make sure all reducers’ oil level are normal.
9.1.4 Make sure the coil pressing device has suitable distance to rollers.
It will not allow running the rollers until mentioned requirements are
satisfied.
9.1.5 Start run the rollers after the signal ring ( long-time ) in jogging
model. It will restart after everything is normal.
9.1.6 Check the function of all electric equipments, make sure they are
same as the instruction. Make sure the order of action is correct. Make
sure all interlock and self-lock are effective.
9.1.7 Make sure each section’s convey speed is satisfy the requirement
and match for each other. Send the signal after check.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 51 of 67
9.1.8 Make sure all lubrication points on blower are lubricated well.
Make sure the rotary direction of motor for blower is correct. Adjust
the air volume and quantity of blower according to the requirement of
technical process.
9.2 Vulnerable part list for cooling roller table
9.2.1、Vulnerable part list (1)
No. description Drawing No. Qty Material Remark
1 Bearing 6308-2LS SM1002.2.1.1.00 8 Φ40×Φ90×23
2 Bearing support SM1002.2.1.1.00 58 Cast steel
3 SM1002.2.1.2.00 112
4 SM1002.2.1.3.00 100
5 SM1002.2.1.4.00 56
6
Bearing support
SM1002.2.1.5.00 28
Cast steel
7 SM1002.2.1.3.00 8
8 Bearing with
support SM1002.2.1.5.00 6 Assembly
9 SM1002.2.1.3.00 8
10 Bearing with
support SM1002.2.1.5.00 6 Assembly
11 Bearing with support UCP205 SM1002.2.1.5.00 2 Product
12 Roller chain 12A-Ⅰ-42 SM1002.2.1.3.00 12 Product
With transition
chain
13 Roller chain 08B-Ⅰ-43 SM1002.2.1.1.00 29 Product
With transition
chain
14 Roller chain 08B-Ⅰ-46 SM1002.2.1.5.00 8 Product
With transition
chain
15 Roller chain 12A-Ⅰ-50 SM1002.2.1.5.00 6 Product
With transition
chain 16 SM1002.2.1.2.00 56
17 SM1002.2.1.3.00 48
18
Roller chain 12A-Ⅰ-52
SM1002.2.1.4.00 28
Product With transition
chain
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 52 of 67
No. description Drawing No. Qty Material Remark
19 SM1002.2.1.5.00 8
20 SM1002.2.1.2.00 56
21 SM1002.2.1.3.00 50
22 SM1002.2.1.4.00 28
23
Roller
SM1002.2.1.5.00 14
Welded part
9.2.2、Vulnerable part list (2)
No. description Drawing No. Qty material remark
1 Roller SM1002.2.1.1.00 29 QT500-7
2 SM1002.2.1.3.00 4
3 Roller
SM1002.2.1.5.00 2 Welded part
4 Roller SM1002.2.1.3.00 4 Welded part
5 Roller SM1002.2.1.5.00 2 Welded part
6 Roller SM1002.2.1.5.00 2 Welded part
7 Alignment roller SM1002.2.1.3.00 12 QT500-7
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 53 of 67
10. Reform station
Feature
(1) Coil collecting device after cooling roller table consist of upper barrel
body, lower barrel body, nose cone, fingers and hydraulic supporting
device. The nose cone is inside of the barrel. The hydraulic supporting
device is used for support the nose cone, and the fingers are used for hold
the coils.
Coil collecting device collect the coil and store for a short time, and it will
provide a buffer time for transportation.
(2) Coil plate assembly consist of elevation device, main support
assembly, transmission device, idler assembly, coil plate acted by hydraulic
cylinder, chain wheel, chain and so on.
Coil plate collect the coil come from coil collecting device, while get the
“full of coil” signal, coil plate descend to the unload position with fast
speed.
(3) Double arm spindle receive the coil and transport from vertical
position to horizontal position by the two arms which are perpendicular.
The rotary shaft is 45°to horizontal, and this make one arm move from
vertical to horizontal and another arm move form horizontal to vertical
while shaft rotate half-cycle.
(4) Transport car consist of coil basket device, elevation device, car
assembly, base assembly and towline.
Transport car transport the coil from double arm spindles to hook, and the
car’s lifting by hydraulic and moving by motor.
10.1 Operation for coil collecting device
10.1.1 make sure all lubrication points get lubricated well.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 54 of 67
10.1.2 Make sure all oil, air, electric lines are correct and smooth.
10.1.3 Make sure all oil pipes, air pipes and electric wires are fastening,
and the function is same as the introduction.
10.1.4 Make sure the equipment’s action is same as design.
10.1.5 A group of fingers hold the coils, they will retract when coil is full
and will not stretch out until the collected coils all unload. All fingers
are linked and acted by an air cylinder. The nose cone could go up and
down acted by 3 sets of hydraulic cylinder for rotary action of double
arm spindles.
10.2 Operation for coil plate assembly
10.2.1 Make sure all chains could work normally.
10.2.2 Make sure the elevating device could elevate smoothly without tilt.
10.2.3 Make sure the coil plate could open and close smoothly.
10.2.4 Make sure the hydraulic cylinder could work normally.
10.2.5 Make sure all oil pipes and joints are tight without damage.
10.2.6 Make sure all chains are lubricated well.
10.2.7 Make sure the braker could work well.
10.2.8 Make sure all electric parts all work well.
10.2.9 Make sure the idler mesh well with chain.
10.3 Operation for double arm spindle
10.3.1 Make sure all lubrication points get lubricated well.
10.3.2 Make sure all oil, air, electric lines are correct and smooth.
10.3.3 Make sure all oil pipes, air pipes and electric wires are fastening,
and the function is same as the introduction.
10.3.4 Make sure the equipment’s action is same as design.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 55 of 67
10.3.5 Make sure the interlock could work well.
10.3.6 The two arms are perpendicular.
10.3.7 The rotary shaft is 45°to horizontal, and this make one arm move
from vertical to horizontal and another arm move form horizontal to
vertical while shaft rotate half-cycle.
10.4 Operation for transport car
10.4.1 Make sure all lubrication points get lubricated well.
10.4.2 Make sure all oil, air, electric lines are correct and smooth.
10.4.3 Make sure all oil pipes, air pipes and electric wires are fastening,
and the function is same as the introduction.
10.4.4 Make sure the equipment’s action is same as design.
10.4.5 Make sure the interlock could work well.
10.4.6 Operation must follow the instruction.
10.4.7 The arm spindle, transport car and hook must not interfere with
each other.
10.5 Vulnerable part list
10.5.1 Vulnerable part list (1)
No. description Drawing No. Qty material remark
1 Coil collecting device SM1002.2.3
2 Block SM1002.2.3.1.00 3 42CrMo
3 Sleeve SM1002.2.3.1.00 6 ZCuAl10Fe3
4 Sleeve SM1002.2.3.1.00 6 ZCuAl10Fe3
5 Cushion SM1002.2.3.1.00 6 H62
6 Joint bearing GE40ES SM1002.2.3.1.00 10 Φ40/Φ62-28
7 Angle contact ball bearing SM1002.2.3.1.00 12 Assembly
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 56 of 67
No. description Drawing No. Qty material remark Φ125×Φ70-24
8 Sleeve SM1002.2.3.1.00 2 ZCuAl10Fe3
9 Cushion SM1002.2.3.1.00 2 H62
10 Joint bearing GEG50E SM1002.2.3.1.00 1 Φ50/Φ90-56
11 Double arm spindle assembly SM1002.2.3
12 Wear resistant plate SM1002.2.3.2.2.00 3 QT420-12
13 Wear resistant plate SM1002.2.3.2.2.00 3 QT420-12
14 Wear resistant plate SM1002.2.3.2.2.00 3 QT420-12
15 Coil plate assembly SM1002.2.3
16 Wear resistant plate SM1002.2.3.3.00 4 40CrMnMo
17 Bearing 32026X/DF SM1002.2.3.3.00 2
18 Cushion SM1002.2.3.3.00 2 Asbestos plate
19 Cushion SM1002.2.3.3.00 2 Q235-A
20 Bearing 6313 SM1002.2.3.3.00 8
21 Bearing 6313 SM1002.2.3.3.00 8
22 Bearing 22214E SM1002.2.3.3.00 4
10.5.2、Vulnerable part list (2)
No. description Drawing No. Qty material remark
1 Transport car SM1002.2.3
2 Wear resistant plate SM1002.2.3.4.1.00 2 16Mn
3 Wear resistant plate SM1002.2.3.4.1.00 2 16Mn
4 Bearing with
support (GB/T7810-1995)
SM1002.2.3.4.1.00 4 UCFLU313
5 Wear resistant plate SM1002.2.3.4.1.00 2 20Mn
6 Wear resistant plate SM1002.2.3.4.1.00 1 20Mn
7 Bush SM1002.2.3.4.1.00 2 ZCuAl10Fe3
8 Bush SM1002.2.3.4.1.00 4 ZCuAl10Fe3
9 Bearing NUTR40 SM1002.2.3.4.1.00 12 Product
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 57 of 67
No. description Drawing No. Qty material remark
10 Bearing NUTR25 SM1002.2.3.4.1.00 8 Product
11 Eccentric shaft SM1002.2.3.4.1.00 4 45
12 Roller shaft SM1002.2.3.4.1.00 4 Welded part
13 Bush SM1002.2.3.4.2.00 8 ZCuAl10Fe3
14 Shaft sleeve SM1002.2.3.4.2.00 2 Seamless pipe 20
15 Bearing GE70ES SM1002.2.3.4.2.00 1 Product
16 Bearing with
support (GB/T7810-1995)
SM1002.2.3.4.2.00 2 UCP322
17 Bearing with
support (GB/T7810-1995)
SM1002.2.3.4.2.00 2 UCP322
18 Bearing 23122CC/W33 SM1002.2.3.4.3.00 1 Product
19 Bearing 23022CC/W33 SM1002.2.3.4.3.00 1 Product
20 Bearing NH2210 SM1002.2.3.4.3.00 4 Product
21 Bearing 32015 SM1002.2.3.4.3.00 8 Product
22 Wheel SM1002.2.3.4.3.00 4 45
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 58 of 67
11. Bundling machine
Feature
Bundling machine compact the coil come from the reform station, tie the
coil, and bundle the coil.
Bundling machine consist of base assembly, compact device and
supporting roller device. Base assembly is welded structure and fixed on
the ground. Compact device consist of support, hydraulic cylinder, wheel
and car. The wheel is support by the base assembly and the shaft which
fixed on the car through rolling bearing. Supporting roller device which
fixed on the ground consist of gearmotor, roller and support.
Supporting roller device should not work until compact device is not
working, and compact device should not work until the supporting roller
device is not working.
After the coil convey to bundling machine by crane, tying device works
when it get the signal send by the compactor, and compactor will not stop
compacting until the coil be compacted. After the coil be bundled manually,
compactor release, and the crane take the compacted coil away when get
the signal sent by compactor.
11.1 Operation
11.1.1 Make sure all lubrication points all get well lubricated, and
hydraulic system is normal.
11.1.2 Adjust the position of proximity switch according to the traverse
speed.
11.1.3 Make sure all function and action are same as instruction, the order
of action is correct, the interlock and self lock are effective.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 59 of 67
11.2、Vulnerable part list
No. Description Drawing No. Qty material remark
SM1002.2.4.1.00 1 1
Hydraulic cylinder CD250E200/125-1525A10/02C
GDMA SM1002.2.4.2.00 1 With collar
GA110
SM1002.2.4.1.00 2 2 Cooper sleeve
SM1002.2.4.2.00 2 ZCuAl10Fe
3
3 Gearmotor YCJ132-75-Y100L1-4-B3-Ⅰ SM1002.2.4.1.00 1 2.2KW
4 Gearmotor YCJ132-75-Y100L1-4-B8-Ⅰ SM1002.2.4.1.00 1 2.2KW
5 Gearmotor YCJ132-75-Y100L1-4-B3-Ⅲ SM1002.2.4.1.00 1 2.2KW
6 Gearmotor YCJ132-75-Y100L1-4-B8-Ⅲ SM1002.2.4.1.00 1 2.2KW
SM1002.2.4.1.00 4 7 Wheel
SM1002.2.4.2.00 4 45
SM1002.2.4.1.00 8 8 Bearing NJ1026
SM1002.2.4.2.00 8 130/200-33
9 Gearmotor YCJ180-66-Y132S-4-B3-Ⅰ SM1002.2.4.4.00 1 Motor
132S-4
10 Chain 20A-1-44 SM1002.2.4.4.00 2 Product
11 Bearing 22214CC/W33 SM1002.2.4.4.00 4 70/125×31
12 Bearing NUTR40 SM1002.2.4.4.00 4
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 60 of 67
12. Coil weighing scale
Feature
The coil weighing scale will weigh the coil and print the label, and the
label will be hang on the coil manually.
Coil weighing scale consist of base plate and coil support unit. The welded
structure base plate is fixed on the ground. The coil support unit is
connected with base plate through link mechanism and bearing with
support. There is a set of weigh device assembled on the coil support unit.
The weight get by weigh device send to the label printer as signal, and print
out on label.
After crane take the coil to the weigh position, coil support elevate and hold
the coil by elevation hydraulic cylinder acting. When the coil non-contact
with the hook, weigh device works. After get the weight, the coil support
descend to the unworking position and send signal, hook take the coil away
from weigh position.
Interlock: The coil must not move out until coil support finish the period of
elevating, descending and weighing. The coil support must not elevate and
weigh until the coil stop at the weighing position stability.
12.1 Operation
12.1.1 Make sure all lubrication points all get well lubricated, and
hydraulic system is normal.
12.1.3 Make sure all function and action are same as instruction, the order
of action is correct, the interlock and self lock are effective.
12.1.4 Make sure the weighing system is precise.
12.2、Vulnerable part list
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 61 of 67
No. Description Drawing No. Qty Material Remark
1 JMX-3 weighing module SM1002.2.5 4 Product
2 Bearing with support UCP216 SM1002.2.5 4 Product
3 Bearing with support UCP213 SM1002.2.5 2 Product
4 Hydraulic cylinder
HSGK-125/90E2511-500×952
SM1002.2.5 1 Φ125×Φ90-500
5 Spherical hinge collar GA45 SM1002.2.5 2 M45×1.5,L1=105
6 Spherical hinge collar GA45 SM1002.2.5 2 M45×1.5LH,L1=105
7 Bearing 6010-Z SM1002.2.5 4 Φ50×Φ80-16
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 62 of 67
III. Regulation for shifting of duty
1. Operator on duty should resume duty ahead of time for handover work
with operator off-duty at post, to comprehend the condition of running
equipments and report to relevant department if abnormal condition
discovered.
2. After taking over the duty, the operator should start patrol inspection on
the equipments which he is in charge of, and make the record. To request
electrician or mechanical workers for eliminating the hidden trouble if
discovered.
3. The job of duty shift covers tracking the defection development of
running equipments, to acknowledge the fault solved on last shift, to check
the bearing temperature, lubrication system, and all the instruments and
signal which are connected with operation control room and etc.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 63 of 67
Chapter 2. General maintenance regulation 1. Daily maintenance
Daily maintenance is important for normally working, and the maintenance
items and frequency see the list.
No. Maintenance item Each shift
Each day
Each week
Each month
Each quarter
Each half of year
1 Leakage(pipe, joint place, sealing place for rotary shaft)
√
2 Tightening of fastener (bolt, nut)
√
3 Lubrication for gear and bearing(oil pressure, valve) √
4 Reliability for electrical element, pressure switch √
5 Mesh of gear(wear、contact pattern)
√
6 Wear of rolling bearing, shaft sleeve √
7 Washing for filter, vent hood √
8 Washing for coupling √
9 Wear of important part, vulnerable part √
10 Pressure of oil, air-oil, air √
11 Pressure of hydraulic oil √
12 Wear of entrance duct, exit duct √
13 Cleaning off scale, dust √
14 Crosshead of universal spindle √
15 Vibration and temperature rise of motor and reducer √
2. Daily maintenance schedule
2.1 General maintenance guide
Clean all spare parts, remove the rust and grease, paint the rust
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 64 of 67
preventative oil, mark the label and store. The important parts such as
oil film bearing, gear and rolling bearing should pay more attention.
Remove the rust preventative oil before using
2.2 Make sure there is no crack and scuffing on sealing parts, clean them
with clear water to prevent distortion.
2.3 Keep the oil and grease clean, and make sure there is no pollution when
sealed store.
2.4 Read the drawings and technical files before replacing, make sure the
new parts have the same precision of fit tolerance as the old parts.
3. Principle of daily maintenance
It is important to set up a reasonable maintenance schedule. It will know
the condition of equipments well if check the equipments follow the
maintenance schedule, and that make the maintenance easier and the solve
faster. Meanwhile the maintenance record could provide data to improve
the operation and maintenance, to make the equipment work better.
4. Maintenance
4.1 Make sure the condition of equipment, sealing parts and lubrication
points are well. Make sure the electrical cabinet, electrical elements,
current, voltage are normal, sensitive and reliable. Solve the anomaly
immediately if discovered.
4.2 Make sure the condition of equipment, sealing parts and lubrication
points for stands and reducers are well. Solve the anomaly immediately
if discovered. The sealing ring on mill roll should be changed when
change the mill roll. The slight leakage is allowed. It must change all
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 65 of 67
sealing parts when maintenance.
4.3 It should wrap the pipes for lubrication and hydraulic system with
plastic film to seal the oil hole. Keep the oil hole of pipes without
pollution especially the pipes for oil film.
4.4 Each shift must be done
4.4.1 Each shift must check the lubrication points once, make sure no
leakage on joints.
4.4.2 Each shift must check the oil level of reducer.
4.4.3 Each shift must clean the equipments.
4.4.4 Each shift must clean equipment’s round.
4.4.5 Each shift must check the electrical elements, signal, and proximity
switch.
4.4.6 Each shift must lubricate the transmission part manually.
4.4.7 Each shift must lubricate the lubrication points which are not
centralized grease lubrication manually.
4.4.8 Each shift must check the condition of fastener
4.4.9 Each shift must make the record, and make sure the equipment
work normally.
4.5 Matters need attention of safety for maintenance
4.5.1 The operation and maintenance must executed by trained staff.
4.5.2 The operator and maintainer must cooperate when maintenance,
repair and cleaning. The power must shut off before maintenance,
repair and cleaning. The power switch must can be touched by related
operator only.
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 66 of 67
4.5.3 It must under the professional’s supervise if the equipment need to
run when solving the problem of mechanical or electrical.
4.5.4 It must shut and unload all valves before maintain the hydraulic
and lubrication system.
4.5.5 It should collect the tools and used parts to avoid lost after
maintenance.
4.5.6 Make sure there is no people in the unsafe zone when restart the
equipment after maintenance. The operator must follow the command
to start the equipment.
5. Institution for oil testing and replacing
5.1 The oil used in the lubrication station should be replaced according the
quality which tested periodically.
5.2 The replacement for oil tank should according the result of test, and
follow the standard for oil’s quality.
5.3 It should test the oil if find the oil’s quality go bad or water in oil. (test
in the middle of tank)
5.4 The test result for oil should be record immediately.
5.5 The new oil should purchase ahead of time.
5.6 The oil to be fill into the tank must pass through 3 grades of filter. The
filters must be clean periodically.
6. Periodical maintenance
6.1 Check the fasteners, lubrication points and electrical equipments
thoroughly and periodically. Solve the problem if discovered.
6.2 Maintain the equipment as minor repair periodically, it includes
changing the worn bearings, worn parts, broken electrical elements,
上 海 重 矿 冶 金 设 备 有 限 公 司 SHANGHAI HEAVY MINING MACHINERY LTD.
版权©上海重矿冶金设备公司 Copyright©SHMM Rev : 0 地址:中国上海市中山北一路 705号 6楼 200083, Web: www.shme.com.cn Date: 6/27/2011 ADD:6F, 705 Zhongshan North 1Rd. HaiJian Building, Shanghai P.R. China Item: TEL:86-021-51089131 FAX:86-021-55396312 E-mail: [email protected] Page: 67 of 67
cleaning the pipes and inside body of equipment.
6.3 Check and replace the lubrication oil and hydraulic oil for equipment
periodically.
6.4 It should follow standard and requirement to disassemble, clean and
reassemble the equipment. Make the record of maintenance.
7. Major repair (overhaul)
7.1 The major repair must follow the technical standard and regulation. The
motors, hydraulic system, lubrication system, pneumatic system must
shut down when major repair.
7.2 Make sure there is no leakage after replacing the instruments for
hydraulic system, lubrication system and pneumatic system. Make sure
the electrical wiring for instruments are correct. The new pipes must
clean especially the pipes for filter system.
7.3 It should do the AC voltage withstand test and insulation test for
transformer, insolating switch of high voltage switch cabinet, oil switch,
control cabinet and high voltage line. The test should follow the
technical standard and regulation for major repair.
7.4 It should replace the oil, sealing parts, worn bearings, gears, shafts,
chains and rollers in major repair. Check and replace the proximity
switches and electrical elements. Maintain and replace the motors,
reducers and couplings.