First Beam
LCLS commissioned a new injector with beam
AND commissioned a new Control System
![Page 3: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/3.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Overview
This presentation summarizes which control system components are currently working for the injector commissioning phaseScreen shots from EPICS show functionality of each systemData from the Elog is shown to illustrate acquisitionComments on what works and what doesn’t are includedSummary includes lessons learned and what still needs to be done
![Page 4: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/4.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Everything is accessible from this screen
![Page 5: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/5.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Beam line graphic used for most GUIse.g. injector vacuum summary
![Page 7: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/7.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
BCS Summary status display: - Calibration of detectors not completed yet - SubBooster Interface timing “difficult”
![Page 8: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/8.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
MPS- working with SLC processor and timing
- ion chambers do trip beam
- several MPS inputs (limit switches on obstructions) not available yet
New optical fiberLoss monitor
screen
![Page 9: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/9.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Conventional facilities- interfaced to EPICS controls- gun LCW temp feedback working ok at 30 Hz
- need to add alarm interface for temperatures, flows etc.
![Page 10: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/10.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Timing System- see separate presentation by S. Allison
- LCLS Event system and SLC Timing working in consort
![Page 11: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/11.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Laser Systems- Image Acquisition and Steering Feedback
![Page 14: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/14.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Gun RF Feedback in Operation - closing the loop between PAD and PAC
![Page 15: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/15.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
RF Phase Scans
Data acquired with Matlab
Data acquired with SCP Correlation Plot
(diagnose a satellite peak from laser)
![Page 16: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/16.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Profile monitors - control and diagnostics through EDM screens
![Page 17: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/17.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Image acquisition with MatlabGun spectrometer YAG Profile Monitor Screen
• Using physicist’s scripts up till now• ImageManager package coming online now
![Page 18: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/18.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Beam Position Monitors- see separate presentation from S. Smith
![Page 19: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/19.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Asynchronous Beam Acquisition via SCPe.g. Gun charge vs. laser power
Measured on the SCP Correlation Plot
But some people still plotting data offline
![Page 20: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/20.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Beam Synchronous Acquisition is working through Matlab – example of orbit display
- BSAP via the SCP coming next
![Page 21: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/21.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Motion control-BC1 chicane movers in use
- next to be commissioned: wire scanners, collimators
![Page 22: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/22.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Generic Tools that are working
SCPConfiguration save and restore
EPICS Channel Watcher
Correlation plots
Strip chart toolsArchive ViewerAlarm handlerElectronic logbookMatlab for higher level applications
![Page 23: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/23.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Strip Tool monitoring gun temperatures during RF trips
![Page 24: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/24.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Electronic logbook gives instant overview
![Page 25: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/25.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Control Room Conditions Still a Bit Cramped (first beam to end of BC1!)
Reorganizing the control room layout
Purchasing more workstations
Injector commissioning involved 12 or more in the room, so its likely to increase as the linac and undulator systems are commissioned
![Page 26: Patrick Krejcik LCLS FACpkr@slac.stanford.edu April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d405503460f94a19b46/html5/thumbnails/26.jpg)
Patrick Krejcik
LCLS FAC [email protected]
April 16-17, 2007
Summary and lessons learned
Remarkable commissioning achievement for the control systemControls commissioning time was squeezed
How do we ask for more?
Planned BC2–linac installation is tight Improve liaison with mechanical engineeringWe are still learning how to handle large number of IOCs and the huge number of PVs
e.g. Restoring after a reboot
Large number of EDM displays can confuse operators at times (looking for a screen that may be already open)Controls group is a great TEAM!