Page 1: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

PAUL L. SHANK P.E., C.M.CHIEF ENGINEER BWI MARSHALL AIRPORT

MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION

WHERE WE ARE – WHERE WE ARE GOINGNOVEMBER 20,

2013

Page 2: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

RSA IMPROVEMENTS, PMP & STANDARDS PROGRAM

Page 3: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

PROGRAM YEAR 2013TASK CONTRACT VALUE MBE

1Runway 15R-33L Standards Compliance Earthwork Project

$21,800,000 25%

2Runway 15R Deicing Pad Pavement Rehab. And Stnds. Compliance

$14,169,000 30%

3 Low Maintenance Grassing Test Plots

$133,000 25%

4 General Aviation Pavement Rehabilitation

$994,000 20%

5RSA Program Environmental Stream Restoration Project

$2,079,000 26%

6Runway 15L-33R Runway Safety Area Improvements

$4,960,000 20%

7Runway 15R-33L RSA, PMP and Standards Compliance Project

$83,235,000 20%

8Runway 10-28 and 15R-33L Obstruction Clearing Project

$413,000 4%

9* Runway 15R-33L NAVAIDS Project

$5,409,000 13%

*Graphic location same as Task 7

Page 4: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

15R 33L EARTHWORK

CONTRACT VALUE: $ 21,756,470

Contract Completes – Summer 2014

MBE: 25%

PROJECT OVERVIEW:

Clearing and grubbing. Storm drain installation. Box culvert installation. Sanitary sewer and underground fire hydrant relocation. Mass earthwork, grading and retaining wall.

Page 5: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

RUNWAY 15R DEICINGCONTRACT VALUE: $ 14,168,409

Contract Completes – November 2013

MBE: 30%

PROJECT OVERVIEW:

Removal of existing pavement. Installation of new glycol drainage infrastructure, lighting, diversion vaults. New concrete pavement and pavement markings.

Page 6: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

ENVIRONMENTAL STREAM RESTORATION

CONTRACT VALUE: $ 2,078,771

Contract Completes – July 2014

MBE: 26%

PROJECT OVERVIEW:

Grading of stream channels and placement of fill.

Construction of in-stream structures. Removal of invasive vegetation and plantings.

Page 7: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

RUNWAY 15L 33R RSA

CONTRACT VALUE: $ 4,959,398

Contract Completes – Spring 2014

MBE – 14%

PROJECT OVERVIEW:

New vehicle service road and airfield equipment access road. Drainage pipe, box culvert and structure installation. Preparation of site and infrastructure for future relocation of existing NAVAIDS.

Page 8: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

CONTRACT VALUE: $ 83,235,000

Proposed Schedule – September 2013 to April 2015

PROJECT OVERVIEW:

Comprehensive Pavement Rehabilitation. Runway Safety Area Grading and Improvements. NAVAID Relocations and Infrastructure Improvements. Runway and Taxiway Lighting Improvements. Taxiway Realignments. Runway Incursion Prevention Elements.

RUNWAY 15R 33L RSA

Page 9: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

PROGRAM YEAR 2014-2015

2014-2015 PROGRAM ELEMENTS

6Runway 10-28 Navaids & Runway 28 Displacement

15A

New T/W “Uniform” & T/W “Uniform 1” And South Portion De-ice Pad

15BRunway 4-22 Conversion To Taxiway “Papa”

15CNew Taxiway Construction (EB-75)

15DOld Taxiway “Delta” Demolition

PROGRAM VALUE 75-100M

15D

15B

15C

15A

6

Page 10: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

10

EXISTING TERMINAL - 2012

SECURITY CHECKPOINTS IN THE

THROAT OF THE CONCOURSES

RESTRICT EGRESS/ EVACUATION CAPACITY

CORRIDOR WIDTH IN ORIGINAL

PORTIONS OF CONCOURSES INADEQUATE

Page 11: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

11

LONG TERM TERMINAL PLAN UPPER LEVEL PLAN

NEW CHECKPOINTS

BETWEEN CONCOURSES BEHIND SECURITY

CONNECTORS ALLOW FOR LOAD BALANCING

AND CONNECTING FLIGHTS

Page 12: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

12

LONG TERM TERMINAL PLAN PHASING PLAN

CONCOURSE D ORIGINALLY FIRST

BECAUSE DEFICIENCIES WERE

GREATER DUE TO THE NUMBER OF GATES

SERVED.

SWA / AIRTRAN MERGER AND CONSOLIDATION ON

CONCOURSES A/B/C SHIFTED PRIORITIES TO

BC CONNECTOR

A B

C

E

Page 13: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

13

CONCOURSE C WIDENING

B/C CONNECTOR

BC CONNECTOR PROGRAM TWO CONSTRUCTION PROJECTS

Page 14: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

14

BC CONNECTOR FINAL UPPER LEVEL PLAN

9 LANE CHECKPOIN

T

Page 15: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

BC CONNECTORCONTRACT VALUE: $ 43,937,000

MBE: 20%

PROJECT OVERVIEW:

Secure passenger corridor connecting Concourse B and C. Nine (9) Lane Security Checkpoint. Observation Deck improvements. Concessions and Office Spaces.

Page 16: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

BC CONNECTOR

Page 17: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

NEW BC SECURITY CHECKPOINT

Page 18: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

NEW BC CONNECTOR

Page 19: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

CONCOURSE C WIDENING

CONTRACT VALUE: $ 28,799,512

Completion Date – January 2013

MBE: 31%

PROJECT OVERVIEW:

Renovate Concourse C to include larger passenger hold rooms and a wider corridor and exit.

New passenger boarding bridges. New baggage handling system. New public restrooms. Modify mechanical & electrical systems.

Page 20: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE CONNECTOR

CONTRACT VALUE: $ 75-100M

Proposed Design Schedule: September 2013- September 2014

Proposed Construction Schedule: January 2015- November 2016

Page 21: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE CONNECTOR

Page 22: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE CONNECTOR ARRIVAL LEVEL PLAN

Page 23: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE CONNECTOR DEPATURE LEVEL PLAN

Page 24: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

NEW DE SECURITY CHECKPOINT

Page 25: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE SECURITY CHECKPOINT VIEW FROM TERMINAL D

Page 26: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE SECURITY CHECKPOINT VIEW FROM TERMINAL E

Page 27: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE CONNECTOR

Page 28: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

DE CONNECTOR

VIDEO OF PROJECT OVERVIEW:

BWI CONFORM.wmv

Page 29: PAUL L. SHANK P.E., C.M. CHIEF ENGINEER BWI MARSHALL AIRPORT MARYLAND TRANSPORTATION BUILDERS AND MATERIALS ASSOCIATION WHERE WE ARE – WHERE WE ARE GOING

*Program

**Advertised

***BidsDue

****Bid Opening

Contract Number & Title Proposed Date Project Value

MAA-CO-13-020Parking Access and Revenue Control System (PARCS)

***May 2013 $8M-$11M

MAA-CO-14-0012015 Airfield Capacity Enhancement Project

**April 2014 $80M

MAA-CO-14-005International Building Expansion

**December 2013 $7M

MAA-CO-14-007Comprehensive Interior/Exterior Modification 2014

**November 2013 $25M

MAA-CO-14-008Long Term Parking Lot B Pavement Rehabilitation

**November 2013 $1.7M

MAA-CO-14-009Pedestrian Walkway from CRCF to the East Tenant Lot *October 2013 $.5M

MAA-CO-14-010Public Parking Area Pavement Rehabilitation **November 2013 $1M

MAA-CO-14-011Central Terminal Third Floor Elevator Upgrades **November 2013 $.5M

MAA-CO-14-012Air Cargo Drive Pavement Rehabilitation *February 2014 $1.7M