PDD Development Small-scale CDM
Carbon Markets – CDM project development, 8. August 2011
Jørgen Fenhann
PROJECT DESIGN DOCUMENT FORM (CDM‑SSC-PDD)VERSION 03 - IN EFFECT AS OF: 22 DECEMBER 2006
CONTENTS
A. General description of the small scale project activity
B. Application of a baseline and monitoring methodology
C. Duration of the project activity / crediting period
D. Environmental impacts
E. Stakeholders’ comments
Annexes
Annex 1: Contact information on participants in the proposed
small scale project activity
Annex 2: Information regarding public funding
Annex 3: Baseline information
Annex 4: Monitoring Information
SECTION A. General description of small-scale project activity
A.1. Title of the small-scale project activity:
Chilinga Mini Hydro Project
A.2. Description of the small-scale project activity:
- Background, Purpose (tco2 eq displaced over project life time i.e.
generating CERs, General description (installed capacity, projected annual
average eneration(GWh), main component of h.e.p. plant etc) & SD
A.3. Project participants: (Project developer - Chilinga Mini Hydro Co.)
A.4. Technical description of the small-scale project activity:
Chilinga catchment areaLuangwa River
Dam wall
Chilinga River
Canal
Penstock
Power House
A.4.1.4.Details of physical location, including information allowing
the unique identification of this small-scale project activity
A.4.3.Estimated amount of emission reductions over the chosen crediting period:
• A.4.2. Type and category(ies) and technology/measure of the small-scale project activity:
• Type I – Renewable Energy Projects
Category I.D. – Grid connected renewable electricity generation
• A.4.3. Estimated amount of emission reductions over the chosen crediting period:
No Yrs Electricity generated (KWh)
Estimation of annual emission reductions in tonnes of CO2e
1 2012 1,439,880 1152
2 2013 2,167,665 1734
3 2014 2,900,791 2321
4 2015 3,063,168 2451
5 2016 …… …..
6 2017 ……. …..
7 2018 …… …..
8 2019 …… ……
9 2020 ……. ….
10 2021 4,277,477 3422
Total 25587
Further required details – ”to mesmerise you”
• A.4.4. Public funding of the small-scale project activity: (No FDI funding)• A.4.5. Confirmation that the small-scale project activity is not a debundled
component of a large scale project activity:
• SECTION B. Application of a baseline and monitoring methodology - B.1.Title and reference of the approved baseline and monitoring methodology applied to the small-scale project activity:
- TYPE I – Renewable Energy Project. AMS-I.D. – Grid connected renewable electricity generation (V. 13), EB 36 (December 2007). - The AMS-I.D. methodology also refers to the "Tool to calculate the emission
factor for an electricity system" (version 01.1) for the calculation of the baseline emissions.
- B.5. Description of how the anthropogenic emissions of GHG by sources are reduced below those that would have occurred in the absence of the registered small-scale CDM project activity: (Additionality – investment, technical barriers; financial analysis etc)
- B.6. Emission reductions: B.6.1. Explanation of methodological choices: The emission reduction ERy by the project activity during a given year y is the difference
between baseline emissions (BEy), project emissions (PEy) and emissions due to leakage (Ly).
ERy = BEy – PEy – Ly
B.2. Justification of the choice of the project category:
• The Project’s nominal installed capacity is 1.0 MW, which will not increase beyond 15 MW over time. Therefore, the Project will comply with CDM rules for small-scale project activities every year over its 10-year crediting period.
B.3. Description of the project boundary:
The project boundary, defined in Appendix B of the Simplified Modalities and Procedures, encompasses the physical, geographical site of the renewable generation source.
B.4.Description of baseline and its development:
The Project will generate electricity without emitting GHGs and supply it to a regional isolated grid, displacing fossil fuel based electricity generation that would otherwise be supplied to this region.
B.6.2. Data and parameters that are available at validation:
• Data / Parameter EFgrid,y: (Tonne of CO2e/MWh ): The emission factor for the diesel generator system providing electricity within the baseline project boundary
• Data / Parameter:EGy (MWh) - Net electricity supplied to the grid by the project
• B.6.3. Ex-ante calculation of emission reductions: • B.6.4. Summary of the ex-ante estimation of emission reductions: • B.7. Application of a monitoring methodology and description of the
monitoring plan: - B.7.1.Data and parameters monitored: • B.7.2. Description of the monitoring plan:
B.8. Date of completion of the application of the baseline and monitoring methodology and the name of the responsible person(s)/entity(ies)
SECTION C: Duration of the project activity / crediting period: Starting date, Expected operational lifetime (30yrs); Choice of the crediting period
and related information; etc etc
SECTION D: Environmental impacts:
SECTION E: Stakeholders’ comments: