Physicians’ Clinic
Wellness Center Hospital Main Entrance
Replacement Hospital Bond Issue Proposal
![Page 2: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/2.jpg)
Phased Masterplan PHASE 1 – 67,213sf PHASE 3 – 118,122sf PHASE 5 – 13,223sf Total 198,558sf
![Page 3: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/3.jpg)
Existing Medical Center
Original Built in 1962 Original built for 110 beds Hospital 109,000sf, Doctor’s Clinic
25,400sf 12 acre campus
134,400 sf
Permian Regional Medical Center
![Page 4: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/4.jpg)
PRMC Move
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
Design - 6 mos Construction - 12 mos
Permian Regional Medical Center
PHASE 1
Wellness Center Physician’s Clinic Physical Therapy
67,213 sf
![Page 5: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/5.jpg)
Demo - 2 mos
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
Permian Regional Medical Center
PHASE 2 Demolition of Doctor’s Clinic/Storage
Building Relocate gas/electrical in NE Hospital
Drive Close/demolish portion NE Hospital
Drive
![Page 6: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/6.jpg)
PRMC Move
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
Design - 8 mos Construction - 15 mos
Permian Regional Medical Center
PHASE 3
New Main Hospital construction
New Central Energy Plant construction
Connect Phase 1 Buildings to new CEP
118,122 sf
![Page 7: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/7.jpg)
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
Demo - 3 mos
Permian Regional Medical Center
PHASE 4 Demolition of 3-story hospital Demolition of existing Central
Energy Plant Demolish original hospital
parking/drive
![Page 8: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/8.jpg)
PRMC Move
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
Construction - 5 mosDesign - 4 mos
Permian Regional Medical Center
PHASE 5
Construction of Dining/Employee Services
Connect permanently to Skilled Nursing Facility
Connect to Central Energy Plant
13,223 sf
![Page 9: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/9.jpg)
Departmental Masterplan
![Page 10: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/10.jpg)
2012 2013 2014 20162015
Summary Timeline Permian Regional Medical Center
Construction12 mos
Design8 mos
Design4 mos
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6
Demo2 mo.s
Construction15 mos
Move In 1 mo.
Construction5 mos
Move In 1 mo.s
Design6 mos
6 7 8 9 10 11 12
Phase 5 - Dining/Connection
Phase 4 – Demolition
Phase 3 – Hospital/Central Plant
Phase 2 – Demolition
Phase 1 - Physician’s Clinic/Wellness
Demo3 mo.s
Move In 1 mo.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 6 7 8 9 10 11 12
![Page 11: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/11.jpg)
Construction Total $ 59,305,087
Project Cost Summary Permian Regional Medical Center
Building Construction• General Construction (198,588 sf)• Demolition• Site Work• Streetwork• Infrastructure• Landscaping
Other Costs• Bond Counsel Fees• Design Fees (architecture, engineering)• Printing Costs etc. • Testing• State Reviews and Inspections• Real Estate acquisition• PRMC Move-in expenses
![Page 12: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/12.jpg)
Interiors Permian Regional Medical Center
Wellness Area
Public Mall
![Page 13: Physicians Clinic Wellness Center Hospital Main Entrance Replacement Hospital Bond Issue Proposal](https://reader030.vdocuments.net/reader030/viewer/2022012918/551a0abb5503462e378b4c6b/html5/thumbnails/13.jpg)
Hospital Main EntranceWellness Center
Design & Graphics by Bundy, Young, Sims & Potter, Inc./Trinity Hughes, 2011
Hospital Entry Plaza