PM4WAT Preventive
Maintenance for Water Utilities
LEONARDO DA VINCI - Multilateral Project
Development of Innovation
Started in November 2009Duration: 24 months
PROWAT2 Meeting 23-24 March 2010 Thessaloniki, Greece
![Page 2: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/2.jpg)
• Maintenance is carried out only when a major breakdown (e.g. leak and a large volume of water) is observed. This is the most common policy used by urban water utilities today.
• The policy is time-consuming and costly as parts and components are often out of stock. Delays in procurement cause delays in restoration of service.
• Customer dissatisfaction is high and • The integrity of the water utility is low.
Traditional Maintenance
![Page 3: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/3.jpg)
Preventive Maintenance • Is the care and service of the network for the
purpose of maintaining it in good operating condition.
• PM provides systematic inspection and detection of incipient failures and proactive rehabilitation i.e. before faults develop into catastrophic events.
• Requires systematic record keeping, tests and measurements for fault prognosis, parts ordering and work scheduling to minimise operational disruption and water loss.
![Page 4: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/4.jpg)
Network Reliability• Object is to preserve and enhance
equipment reliability by replacing worn components (piping, connectors, joints etc.) before they fail.
• PM activities include scheduled branch inspection and partial replacements at regular intervals.
• Long-term benefits are reduced Life-Cycle Costs
![Page 5: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/5.jpg)
The PM4WAT Project• Fusion of national practices to
produce – a unified curriculum definition
and – a library of learning content
for a multi-lingual web-based training course on Preventive Maintenance of Urban Water Utilities.
![Page 6: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/6.jpg)
Project summary• VET programme for urban water utility
networks subject to: – ageing, – water losses, – seismic activity and– other natural hazards.
• Target group: – water utility personnel, – inspection engineers,– civil and hydraulic engineers
![Page 7: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/7.jpg)
Project ObjectivesTo provide urban water utility
personnel training in PM that will • lead to the adoption of state of the
art practices • offer training on pro-active
rehabilitation and • training on the effects of natural
hazards.
![Page 8: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/8.jpg)
Components of the VET
• The training program involves 2 components
![Page 9: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/9.jpg)
• a theoretical part which involves web-based courseware based on an e-learning platform (MOODLE) which provides embedded self-teaching and assessment capabilities.
![Page 10: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/10.jpg)
• and a practical part (based on an earlier FP5 project – SEISLINES) which involves software that integrates – GIS – Risk Analysis and – Database Management
to estimate the temporal degradation of branches of the network for different environmental scenarios.
![Page 11: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/11.jpg)
Scenario-Based Training• The training program will use real
data taken from a medium-sized urban water utility.
• The trainee will be able to examine the effects of different scenarios and learn the most appropriate rehabilitation procedures to use to rapidly mitigate any network problem.
![Page 12: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/12.jpg)
12
SEISLINES - Selection of network nodes
Network nodes
selection via GIS
Selected nodes
geometry Reliability calculation
Selected nodes
![Page 13: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/13.jpg)
13
SEISLINES – Visualization of results
Node Reliability curve over
time
Previous scenarios
resultsstored in
the database
![Page 14: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/14.jpg)
14
SEISLINES – Rehabilitation options
Link (pipe) between
two nodes
Rehabili-tation
options …
based on the
Reliability results
![Page 15: PM4WAT Preventive Maintenance for Water Utilities LEONARDO DA VINCI - Multilateral Project Development of Innovation Started in November 2009 Duration:](https://reader036.vdocuments.net/reader036/viewer/2022062423/56649f255503460f94c3c5e2/html5/thumbnails/15.jpg)
The Consortium• Coordinator:
– Research Academic Computer Technology Institute (RACTI), GR
• Partners– Center for Assessment of Natural
Hazards & Proactive Planning, GR
– Training 2000, IT– Pamukkale University, TR– Denizli Municipality, TR– HS Data Ltd, CY– Water Board of Lemessos, CY