Design
Design
Design
Design
Design
Design
Design
Design
Construction
Construction
Construction
Construction
Construction Construction
Construction
Construction
Procurement
Procurement
Procurement
ProcurementProcurement
Installation
Installation
Installation
Installation
Installation Installation
Power systems’ development planning
Power systems’ development planning
Power systems’ development planning
Power systems’ development planning
Energy efficiency
Energy efficiency
Energy efficiency
Energy efficiency
Energy efficiency
Adjustment
Adjustment
Adjustment
Adjustment
Expert examination of industrial safety
Expert examination of industrial safety
Research and development
Research and development
32 www.etsgp.ru
Design
Installation
Development planning
Research and development
Expert examination of industrial safety and integrated survey
Energy efficiency and energy audit
ETS Group renders comprehensive engineering services in the power engineering sector. Each company of the group is highly competent in its field of activities. In addition to the main types of activities, our specialists have high expertise in the field of power plants’ operation and energy sales. All this enables us to provide our services in a comprehensive manner.
Our aim is a long-term cooperation with the client. ETS Group uses leading-edge technologies including in the field of project management. We have introduced quality management, occupational safety and environmental management systems and are constantly improving them. We use our own highly qualified personnel, most advanced instruments, equipment, software, certified laboratories and automate our production processes to the fullest extent.
ABOUT US
Construction
Adjustment
54 www.etsgp.ru
2007
2008
2010
2012
2012
Design of facilities up to 110 kV
Design of ultrahigh voltage facilities
Integrated surveys and expert examination of industrial safety
Consulting and research in power engineering
Construction and installation
HISTORY OF DEVELOPMENT
ETS Group was formed in the course of reforming “RAO “Unified Energy Systems of Russia”, OJSC based on ambitious and highly qualified personnel of Gorky Branch of Research, Design and Survey Institute “Energosetproekt” founded in 1962. The Group’s first line of business was design of power transmission lines and power substations of high and ultrahigh voltage, elaboration of power systems’ development plans for the European part of Russia, Ural and Siberia. In proportion to the development of new competencies, new companies were formed within ETS Group specializing in related types of services. It resulted in the promptness of decision making and closeness to the client with a considerable expansion of scope of works done and increase in the scale of business.
Later, such lines of business were formed as inspection of construction structures, expert examination of industrial safety of buildings and constructions, engineering services in the field of construction of power facilities including highly dangerous, unique and technically complex facilities.
The lines of cogeneration, information and analytic services, and consulting in power engineering are actively developing. Such lines of business as land and cadastral works, heat and gas supply, aerial photography and making orthophoto plans are successfully developed. A great scope of works is done in the field of R&D under orders of governments of regions and relevant ministries of the Russian Federation.
76 www.etsgp.ru
Each company of the Group has its own distinct area of works performed, while our joint capabilities enable us to accomplish all our clients’ potential tasks in the most comprehensive way.
The main line of ETS Group’s business is a comprehensive design and construction of power grid facilities of any complexity including unique, highly dangerous and technically complex, as well as the performance of research and development, design and survey, and engineering works.
More than 410 projects completed
20EMPLOYEES
120EMPLOYEES
338EMPLOYEES
CONSULTING
DESIGN LINE OF BUSINESS
CONSTRUCTION LINE OF BUSINESS
OUR CAPABILITIES
98 www.etsgp.ru
EFFICIENCY AND RESPONSIBILITY
Responsibility to customers:• Always determine customer’s needs
• We do not merely meet customers’ requirements but seek to exceed their expectations
• Quality is the main principle of our activities
Responsibility to employees:• We appreciate our employees
• We provide opportunities for professional development
• We provide opportunities for doing sports
• We provide supplementary medical insurance
• Our production processes are organized with account of modern occupational safety requirements
Responsibility to the society:• We partnered the relay athletic race dedicated to the 68th anniversary of
Victory in the Great Patriotic War and XXVII World Summer Student Games in Kazan in 2013
• We provide financial support to men’s volleyball team of Nizhny Novgorod State Technical University “VK NGTU”
• We provide sponsor support to Remedial School No. 56 for children having health limitations
High responsibility for the final outcome
Flexible approach to planning and perfor-mance of works
Strict observance of project budgets
Building effective and mutually beneficial relations with customers
Highly developed corpo-rate structure
Highly qualified personnel having vast practical experience
Efficiencyfactors
Corporate responsibility is an important component of ETS Group’s business strategy. It is formed under the commonly accepted ethic, legal and economic requirements.
We are constantly introducing advanced technologies in our activities and work on the development of team spirit and performance of our employees.
1110 www.etsgp.ru
QUALITY
ETS GROUP COMPANIES EMPLOY:
• Occupational health management system (OHSAS 18001)
• Quality management system (ISO 9001)
• Environmental management system (ISO 14001)
• Power management system (ISO 50001)
• Automated project management system based on Microsoft Project
OUR COMPANIES ARE MEMBERS OF THE FOLLOWING ORGANIZATIONS AND ASSOCIATIONS DIRECTLY OR THROUGH THEIR EMPLOYEES:
• International Council on Large Electric Systems – CIGRE (Conseil International des Grands Reseaux Electriques – CIGRE)
• Committee for the Reliability of Power Systems of President of the Russian Federation
• Industrial partner of Alekseev Nizhny Novgorod State Technical University in the priority line “Energy Efficiency, Power Supply and Nuclear Power Engineering” under the Federal Targeted Program “Research and Development in the Priority Areas of Development Lines of the Russian Scientific and Technological Complex in 2014-2020”
• Self-Regulating Organization Nonprofit Partnership “Inter - Regional Association of Special Construction Organizations”
• Self-Regulating Organization Nonprofit Partnership “Association of Design Engineers”
• Self-Regulating Organization Nonprofit Partnership “Association of Prospecting Engineers”
• Self-Regulating Organization Nonprofit Partnership “Association of Power Engineers”
• Self-Regulating Organization Nonprofit Partnership “Association of Construction Engineers”
• Self-Regulating Organization Nonprofit Partnership “Association of Organizations Conducting Expert Examination of Industrial Safety”
• Association “Nonprofit Partnership Market Council”
• Scientific and Methodological Council of Federal Service of State Statistics
1312 www.etsgp.ru
Design
FIELD OF ACTIVITIES
• Comprehensive engineering surveys and approvals
• Design of substations 6-10 kV, 35-750 kV
• Design of cable lines and overhead lines 6-10 kV, 35-750 kV
• Design of emergency control systems, automated process control systems and automated power consumption information and fiscal metering systems
• Development of cost estimate documents, designs of construction and disassembly
• Special sections of design documents
• Private expert examination of design estimate documents
• Preparation of procurement documents
Substation 500 kV “Enisey” with approach overhead lines 500 kV and 220 kV
Overhead line 500 kV Zagorskaya Pumped Storage Power Plant – Yartsevo with reconstruction of “Yartsevo” Substation 500 kV
Reconstruction of outdoor switchgear 330 kV in Leningrad Nuclear Power Plant (metalclad substation)
Data Processing and Storage Support Center of “Concern Rosatom”, OJSC
Reconstruction of cable lines 220 kV of Thermal Power Plant-23 Elokhovskaya 1,2 and overhead lines 330 kV Tikhvin-Petrozavodksya
External power supply of construction base of Kursk Nuclear Power Plant-2. Preparatory stage. Substation 330/10 kV
Enhancing the reliability of waterfront’s power supply, Facility 931, Murmansk Region
PROJECTS
1514 www.etsgp.ru
FIELD OF ACTIVITIES
Consulting
• Development of information analysis reports on the operation of fuel and power complexes of regions of the Russian Federation
• Development of trade patterns of power plants’ operation
• Substantiation of investments in construction
• Development of programs for innovative development of power engineering sector’s companies
• Conduction of marketing research based on benchmarking and adaptation of best world practices of operating efficiency of power grid and power generating companies
• Optimization of spending by big consumers for procurement of power resources
• Monitoring and analysis of power markets’ operation
• Making retrospective and prospective fuel and power balance statements of constituent entities of the Russian Federation
PROJECTS
Analysis of operation and development prospects of fuel and power sector of Moscow
Development of trade pattern of “Tereshkovo” Gas-Turbine Thermal Power Plant
Expert examination of operating efficiency’s benchmarking of structural subdivisions of “Federal Grid Company of Unified Energy System”, OJSC
Design of power supply scheme of grids 110 kV and higher of Troitsky and Novomoskovsky Administrative Districts (TiNAO) of Moscow
Research of best practices for the provision of efficiency and reliability of power plants’ equipment operation. Development of indicators and criteria for the introduction of best operation of power plants’ equipment (benchmarking). Development of recommendations for the improvement of technical and economic parameters of power plants’ operation “INTER RAO”, PJSC
1716 www.etsgp.ru
Construction
FIELD OF ACTIVITIES
• Investment project management, organization of financing
• Formalization of initial permissive documents
• Providing construction sites with equipment and materials
• Electrical installation works related to substations, overhead lines (cable lines) 6-10 kV, 35-750 kV and cogeneration facilities
• General construction works
• Commissioning works
• Exercising the functions of a general contractor
• Technical supervision
• Putting facilities into operation
• New equipment training of customer personnel
• EPC-contracts
Central Power Distribution Station No. 7 of Catalytic Cracking Complex 2 of “Lukoil - Nizhegorodnefteorgsintez”, LLC
Comprehensive technical re-equipment and reconstruction of “Zarechnaya” Substation 220 kV
Retail electrical energy market accounting system for “Tula City Electrical Grids”, OJSC
Utility connection of facility “Storage Areas No. 1, 2, 3 of Troop Unit 11931” (codes 17/837-1, 2, 3) for “Volgo - Vyatsky” Branch of “Oboronenergo”, OJSC
Electrical installation and assembly works related to APCS, I&CE, software and hardware complexes and weak-current systems for the implementation of project “Construction of Power Unit – Combined Cycle Gas Turbine 800 MW of Perm Hydroelectric Power Plant”
Construction of pile foundations for a 45,000 capacity stadium in the city of Nizhny Novgorod, Betankur Street Quarter
Additional equipment of waterfront facilities, Facility 931, code 2/46-358 for the needs of “Kolsky” Branch of “Oboronenergo”, OJSC
Arrangement of Air Base 7054 in Chkalovsk Settlement of Kaliningrad Region, remote facilities – LOM-90,LOM-270 (code KOP/4-13/2) for “Kaliningradsky” Branch of “Oboronenergo”, OJSC
PROJECTS
1918 www.etsgp.ru
• Survey of building structures of industrial facilities including highly dangerous facilities and high-rise facilities
• Survey of building structures of power facilities
• Survey of building structures of oil and gas sector’s facilities
• Survey of antenna and mast structures
• Expert examination of industrial safety of industrial facilities
• Expert examination of industrial safety of power sector’s facilities
• Expert examination of industrial safety of oil and gas sector’s facilities
• Energy audit
Expert examination of industriala safety, integrated survey
FIELD OF ACTIVITIES
Technical examination of production premises and structures of
Branches of “Tyumenenergo”, OJSC: “Nizhnevartovsk Electrical
Grids”, “Uray Electrical Grids”, “Energocomplex”
Technical examination of buildings and constructions of
“Novobryanskaya” Substation 750 kV under the title:
“Replacement of Switches 750 kV at “Novobryanskaya”
Substation 750 kV of “Federal Grid Company of Unified Energy
System”, OJSC”
Expert examination of industrial safety of building for the
repair of diesel/electric trains and auxiliary shops of Kaliningrad
Direction of Multiple-Unit Rolling Stock – Branch of “Russian
Railways”, OJSC
Expert examination of industrial safety of buildings and
constructions of “Lukoil - Premnefteorgsintez”, LLC
PROJECTS
2120 www.etsgp.ru
Power systems’ development
FIELD OF ACTIVITIES
• Elaboration of regional power system’s development schemes and programs
• Elaboration of power plants’ power distribution schemes; elaboration of schemes for the connection of substations to power transmission lines and power systems
• Calculations of static and dynamic stability
• Electrical Grids’ Comprehensive Development Programs
Scheme and program for the development of power sector of Vologda Region in 2014-2018
Scheme and program for the development of power sector of Samara Region in 2014-2018
Scheme and program for the development of power sector of Nizhny Novgorod Region in 2013-2017 with a view to 2022
Scheme and program for the development of power sector of Moscow in 2017-2022
Scheme and program for the development of power sector of the Republic of Dagestan in 2017-2021
Development of design documents for systems of relay protection and automation and emergency control systems of Novokuibyshevskaya Thermal Power Plant 1 with the installation of a gas-turbine unit with the capacity of 200 MW
Master plan of power supply of Moscow until 2030
WORKS
2322 www.etsgp.ru
FIELD OF ACTIVITIES
• In-depth terrain analysis before the construction of structures and buildings
• Office elaboration of capital construction projects’ location options
• Formalization of land legal relations
• Development of planning and land marking projects
• Cadastral works
• Engineering and hydrometeorological surveys
• Engineering and geodetic surveys
• Engineering and geological surveys
• Engineering and ecological surveys
Survey of soil for the foundations of the existing overhead lines 500 kV Krasnoyarskaya Hydroelectric Power Plant –
Krasnoyarskaya Substation
Design and survey works under the title “Reconstruction of Overhead Lines 220 kV Nizhegorodskaya - Zarechnaya
and Overhead Lines 220 kV Luch – Nagornaya for the Connection of “Diesel” Substation 220 kV for the Needs
of Branch of “Federal Grid Company of Unified Energy System”, OJSC – Volga Bulk Electrical Grids
Engineering Surveys and Examination of structures of supports and portals under the title “Development of
Design Documents for the Reconstruction of Overhead Crossings 4-5T, 8-9T, 10T of Volzhskaya Hydroelectric
Power Plant.
Engineering topographic survey of underground utilities’ path located in direct vicinity to land plots owned by
“KhimIndustriya”, LLC
Land legal relations and engineering surveys
WORKS
2524 www.etsgp.ru
Heat and gas supply
FIELD OF ACTIVITIES
Development of design and cost estimate documents: from passing expert examination to new construction, reconstruction and technical re-equipment of the following facilities:
• Industrial and heating boiler houses
• Centralized and individual heating units
• Distribution gas supply systems, outdoors and indoors gas pipelines, gas consumption metering stations, gas equipment
• Heat supply systems, heat pipelines, steam and hot water pipelines
• Water supply and water removal systems
• Heating systems utilizing gas infrared radiators and gas heat generators, process lines’ gas supply systems
• Heating and ventilation systems
Examination of technical conditions of grids of boiler house Oil Mine Directorate-2 under the project “Reconstruction
of Boiler House of Oil Mine No. 2 of Oil Mine Directorate “Yareganeft”
Development of specification and data sheets for steam boilers, gas burners, auxiliary equipment of steam boilers,
discharge smoke pipes, reinforcement bars for the framing of boilers under the project “Expansion of Boiler House of
Oil Mine No. 2 of Oil Mine Directorate “Yareganeft”
Development of working documents under the project “Expansion of Boiler House of Oil Mine No. 2 of Oil Mine
Directorate “Yareganeft”
Contract works for the development of design documents under the project “Reconstruction of Central Power
Distribution Station-3”
WORKS
2726 www.etsgp.ru
Aerial photography and orthophoto plans
FIELD OF ACTIVITIES
Package of field works for a horizontal and vertical survey and marking of ground reference points
Photographing a linear section of an overhead line with the subsequent processing and 3D modeling of wires and
supports
Making 3D models of cities based on georeferenced point clouds
Aerial monitoring with photographing and simultaneous transmission of HD video
Remote ground sounding to obtain current information on the consequences of industrial and natural disasters
WORKS
• Providing aerial photography services using the own fleet of unmanned aerial vehicles and ground-based land surveying equipment with subsequent office processing of materials received
• Aerial photography data processing and visualization technologies make it possible to generate and analyze orthophoto plans, digital terrain models and 3D objects within a short time and with centimeter - level accuracy
2928 www.etsgp.ru
OUR CUSTOMERS
ПРАВИТЕЛЬСТВОМОСКВЫ
энергия без границ
3130 www.etsgp.ru
CERTIFICATES
• Certificate of admission to a specific type or types of works influencing
the safety of capital construction projects No. C.055.52.9297.11.2016
dated 11/11/2016 issued by Nonprofit Partnership Self - Regulating
Organization “Association of Construction Engineers”
• Certificate of admission to a specific type or types of works influencing
the safety of capital construction projects No. И.005.21.1541.11.2016
dated 09/11/2016 issued by Nonprofit Partnership Self-Regulating
Organization “Association of Prospecting Engineers”
• Certificate of admission to a specific type or types of works influencing
the safety of capital construction projects No. П.037.21.4738.01.2017
dated 19/01/2017 issued by Nonprofit Partnership Self - Regulating
Organization “Association of Design Engineers”
• Quality management conformance certificate (GOST ISO 9001-2011)
No. А.СРТ.СС.150801.01-3859.04 dated 03/08/2015
• Environmental management conformance certificate GOST R ISO
14001-2007 (ISO 14001:2004) No. СДС.ПСС.СМ14.0734 dated
13/07/2016
Design
Design
Design
Design
Design
Design
Design
Design
Construction
Construction
Construction
Construction
Construction Construction
Construction
Construction
Procurement
Procurement
Procurement
ProcurementProcurement
Installation
Installation
Installation
Installation
Installation Installation
Power systems’ development planning
Power systems’ development planning
Power systems’ development planning
Power systems’ development planning
Energy efficiency
Energy efficiency
Energy efficiency
Energy efficiency
Energy efficiency
Adjustment
Adjustment
Adjustment
Adjustment
Expert examination of industrial safety
Expert examination of industrial safety
Research and development
Research and development
www.etsgp.ru