Presentation on
Urban Freight Transport – Mumbai Metropolitan Region
Indo-US workshop on Urban Freight Transport: A Global Perspective
99thth April, 2014 April, 2014
K Vijayalakshmi, Addl. Chief (Metro,Mono-K Vijayalakshmi, Addl. Chief (Metro,Mono-UMMTA)UMMTA)
Transport & Communications Division, Transport & Communications Division, Mumbai Metropolitan Region Development AuthorityMumbai Metropolitan Region Development Authority
Structure of Presentation
Study Area – MMR and Traffic & Transportation Survey
Database Internal Passenger Travel Demand Internal Goods Travel Demand External Travel Demand: Outer Cordon Locations Travel Demand Modelling and Transport Networks External Travel Demand Models Proposed Terminals Preliminary Cost Estimates and Funding Sources Steps taken so far….
Study Area and Traffic & Transportation
Data Base
Map of India
Map of MMR
District Map of Maharashtra
Mumbai
Thane
Vasai-Virar
Bhiwandi
Kalyan
Khopoli
Pen
Alibag
Mira-Bhayander
UlhasnagarAmbernath
Badlapur
Panvel
Uran
Matheran
Karjat
Navi Mumbai
Thane Dist.
Raigad Dist.
Sub- urbanDist.
Area 4355 sq.km.
Population 20.8 million (2005)
Districts in MMR 1. Mumbai2. Suburban3. Thane4. Raigad
Corporations in MMR
1. Greater Mumbai 2. Thane3. Navi Mumbai4. Ulhas Nagar5. Kalyan-Dombivali6. Mira Bhayandar7. Bhiwandi-
Nizampur8. Vasai-Virar
Municipal Councils in MMR
1. Ambernath2. Kulgaon-Badlapur3. Alibaug4. Pen 5. Uran6. Matheran Hill
Station7. Panvel8. Karjat9. Khopoli
Villages < 1000
Urbanisation 94% Urban Population6% Rural Population
Mumbai Metropolitan Region (MMR)
Current Travel Scenario in MMR
Surveys/ Studies ConductedNo. Primary Survey Extent
1 Home Interview Survey (HIS) 66,000 Households
2 Classified Volume count and OD Survey at Outer Cordon Locations
24 Hr., 9 Locations
3 Classified Volume count and OD Survey at Sub-regional cordons
24 Hr., 20 Locations
4 Classified Volume count at Inner Cordon Locations 16/24 Hr., 33 Locations (OD Survey at 3 Loc.)
5 Screen Line Points 16 Hr., 3 Locations
6 Mid-Block Locations 16 Hr., 11 Locations
7 Level Crossing Locations 16 Hr., 5 Locations
8 Sub-urban Rail Passenger Surveys 6.17%
9 Sub-urban Rail Passenger Surveys, Alighting Survey: Stations 16%
10 Operational Characteristics of Bus and Rail Transport Networks
5700 Bus Routes and 1767 Train Services
11 IPT (Auto and Taxi) Surveys 50 Locations
12 Bus Terminal Surveys 13 Bus Terminals
13 Airport Terminal Surveys 2000 air passengers
14 Goods Terminal Surveys 20 Goods Terminals
15 Speed-Flow Studies 16 Carriageway Types
16 Journey Speed and Delay Studies 550 Kms
17 Network Inventory 2,300 kms.
18 Pedestrian Surveys 50 Locations
19 Parking Surveys 50 Stretches
20 Workplace Based Surveys 4000 respondents
JNPT
Mulund
MulundGoregaon
RCF Thal
APMC,VashiTaloja MIDC
Mumbai PortWadi Bander
MAFCO,Turbhe
Seepz,Andheri
Chinch Bander
Ambernath MIDC
Badalapur MIDC
Sewree Oil Depot
Andheri Kurla Road
Rallis India,Vashi
Oil Refinery, Mahul
Kalyan Bhiwandi MIDC
Flower Markets,Dadar
Cotton Avenue,Mumbai
Truck Terminal,Vashi
FCI Godowns,Borivali Kalyan Dombivali MIDC
Panvel Truck TerminalReay Road ,FCI Godown
Turbhe,Container Depot
Wagle Estate MIDC,Thane
MIDC,Patalganga,Rasayani
Charkop Industrial Estste
Zenith Industries,Khopoli
Bhuleshwar Textile Market
Mumbai Pune Road,Kalamboli
MIDC Waliv Estate,Bilalpada
Dronagiri Container Terminal
Kajupada,Thane Road, Borivali
Seepz SEZ, Marol MIDC, Andheri
Ispat Industries,Pen Alibag Road
Mahesh Industrial Estate,Bhayander
Iron & Steel Market Yard, Kalamboli
Mahape Industrial Estate,Navi Mumbai
Cotton Green Rly Goods Yard & FCI Godowns
Major Goods Terminals in MMR
• CWC Terminals 0,1,2 3 …. (2)• CWC warehouses/FCI Godowns
4,13,14,28,34,38,40,41,42 9 ….(4)• Large whole/FCI Godowns
5,6,7,12,16,19,20,21,25,26,27,29,30
31,32,35,36,37,39,43 20 …. (5) • Truck Terminals 8,17,24 3 …..(3)• Oil Refineries 15,18 2 …..(1)• Container Depots 3,9,10,23,33 5 …..(3)• Ports 11,12 2 …..(2)
Total 44 (20)
Classification of Goods Terminals
Total Locations
Locations for
Survey
• CWC Terminals 0,1,2 3 …. (2)– Cotton Green Railway Goods Yard & FCI Godowns– MAFCO, Turbhe
• CWC warehouses/FCI Godowns 4,13,14,28,34,38,40,41,42 9 ….(4)
– Reay Road, FCI– Mulund, FCI – Goregaon, FCI– Mahesh Industrial Estate, Bhyander
• Large whole/FCI Godowns5,6,7,12,16,19,20,21,25,26,27,29,30, 31,32,35,36,37,39,43
20 …. (5) – APMC Vashi– FCI Godown, Borivali– Mahape Industrial Estate, Navi Mumbai– Wagle Estate, Thane– Kalyan-Bhiwandi Industrial estate
• Truck Terminals 8,17,24 3 …..(3)– Vashi Truck Terminal– Wadala Truck terminal– Panvel Truck terminal
• Oil Refineries 15,18 2 …..(1)– Sewree Oil Depot
• Container Depots 3,9,10,23,33 5 …..(3)– Wadi Bunder– Dronagiri Container terminal– Mulund
• Ports 11,12 2 …..(2)
Total 44 (20)
Goods Terminal Survey Locations
I-I I-E
E-I E-E
From ICs, RSI AnalysisI-I: Internal to Internal
From Cordon Survey Analysis
E-I: External to InternalI-E: Internal to External E-E: External to External
Demand Matrices
Internal Goods Vehicle Travel
Inner CordonsSub-regional Cordons
Daily Internal Goods Vehicle Travel
Component Veh. PCUs Veh. PCUs
I-I 62,645 1,72,150 60% 59%
I-E 18,886 55,620 18% 19%
E-I 17,076 49,866 16% 17%
E-E 5,105 15,453 5% 5%
Total 1,03,712 2,93,088 100% 100%
Daily Internal Goods Vehicle Travel
Sl. No. WSA, 1961
(Vehicle)
CRRI, 1983
(Vehicle)
MMPG, 1996
(Vehicle)
WFSL, 2005(PCUs)
CTS Study (PCUs)
Base Year 1961 1979 1996 2005 2005
Study Area
BMR BMR MCGM MCGM MMR
Internal 71,000 72,315 1,72,152
External 10,000 54,428 1,20,938
Total 63,000 81,000 1,26,743 2,33,000 2,93,088
Estimated Goods Vehicle Travel from previous Studies
Traffic Survey Locations
External Travel Demand: Outer Cordon Locations
• OC1: Near Tansa River, NH8
• OC2: Near Ambadi Naka, SH35
• OC3: Near Kasna Bridge, NH3
• OC4: Goveli Gaon, MSH2
• OC5: Near Ratholi, SH43
• OC6: Near Karjat Jn., SH38
• OC7: Near Khopoli, NH4
• OC8: Near Toll Plaza, MPE
• OC9: Near Naygaon, NH17
Traffic Survey Analysis: Outer Cordon Locations
Total Traffic:
97,000 Vehicles/day
1,82,000 PCUs/dayThane
Virar
Kalyan Dombivali
Navi Mumbai
GreaterMumbai
Panvel
Uran
Alibagh
NH
8
SH
35
NH3
MSH2
SH43
SH38
NH
4
MP
E
NH
17
To
Ah
me
da
ba
d
To
Wad
a
To Nashik
To Murbad
To M
urba
d
To Goa
To Pune
1 2
3
4
5
6
7
8
9
To Pune
51004900
300300
800900
19100
17600
8900
1210012900
11600
114007600
7400
6900
268
0027
200
All Traffic Figures are in PCUs/Day
• Major Corridors: Ahmedabad-Pune
Location Wise Contribution of Passenger Vehicles: Outer Cordon
Locations
Total Daily Traffic:
54,882 Vehicles
59,904 PCUs
Thane
Virar
Kalyan Dombivali
Navi Mumbai
GreaterMumbai
Panvel
Uran
Alibagh
NH
8
SH
35
NH3
MSH2
SH43
SH38
NH
4
MP
E
NH
17
To
Ah
me
da
ba
d
To
Wad
a
To Nashik
To Murbad
To M
urba
d
To Goa
To Pune
1 2
3
4
5
6
7
8
9
To Pune
9.59%
0.55%
1.05%
31.49%
8.14%20.70%
6.75%
7.79
%
13.9
4%
All Figures are expressed as % of total passenger vehicles entering
and exiting from the MMR
Major Corridors:
• Pune
• Goa
• Ahmedabad
• Murbad
All Figures are expressed as % of total freight vehicles entering and
exiting from the MMR
Thane
Virar
Kalyan Dombivali
Navi Mumbai
GreaterMumbai
Panvel
Uran
Alibagh
NH
8
SH
35
NH3
MSH2
SH43
SH38
NH
4
MP
E
NH
17
To
Ah
me
da
ba
d
To
Wad
a
To Nashik
To Murbad
To M
urba
d
To Goa
To Pune
1 2
3
4
5
6
7
8
9
To Pune
3.43%
0.15%
0.90%
13.34%
13.3%
7.57
%
37.6
1%Total Daily Traffic:
42,118 Vehicles
1,22,097 PCUs
Location Wise Contribution of Freight % Vehicles: Outer Cordon Locations
Major Corridors:
• Ahmedabad
• Pune
• Nashik
• Goa
Major Commodity Type at OC Locations
Thane
Virar
Kalyan Dombivali
Navi Mumbai
GreaterMumbai
Panvel
Uran
Alibagh
NH
8
SH
35
NH3
MSH2
SH43
SH38
NH
4
MP
E
NH
17
To
Ah
me
da
ba
d
To
Wad
a
To Nashik
To Murbad
To M
urba
d
To Goa
To Pune
1 2
3
4
5
6
7
8
9
To Pune
BMFG
BMBM
FGFG
C&
FF
G
F&VF&V
BMBM
TextilesF&V
F&
VB
M
C&
FF
G
Legend:
C&F: Chemicals & Fertilizers
FG: Food grains
F&V: Fruits and vegetables
BM: Building Materials
• Chemicals & Fertilizers Outgoing
• Food Grains, Fruits & Vegetables Incoming
• Building Materials – In and Out
Average Traffic Composition
2-Axle Truck23.88%
3-Axle Truck7.13%
Others0.04%
Animal Drawn0.07%
LCV8.40%
Other Std. Bus2.75% BEST/Govt. Bus (SD)
3.84%
BEST (DD)0.00%
Mini Bus0.43%
Car/Jeep (exc. Taxi)31.26%
Taxi0.70%
Auto Rickshaw (3W)2.57%
Two Wheeler10.87%
Cycle0.85%
Maxi Cab (3W)3.15%
Tractor Trolly0.05%MAV
3.96%
Tractor0.07%
• Car & Two wheeler: 42%
• Bus: 6.6%
• Goods vehicles: 43.5%
Traffic Movement at Outer Cordon
17,076 Veh. /day
(41.58%)
5,106 Veh. /day
(12.43%)
18,887 Veh. /day
(45.99%)
43,403 Veh./day
(45.86%)
7,360 Veh./day
(7.78%)
43,883 Veh./day
(46.37)
Total Traffic Goods Traffic
MMRMMR
Average Pay Load (Tonnes)
LocationLCV
2 Axle Truck
3 AxleTruck
MAVs
OC1 (NH8) 4.07 6.96 9.87 15.94
OC2 (SH35) 2.47 7.63 10.47 22.00
OC3 (NH3) 3.12 8.44 11.79 15.15
OC4 (MSH2) 5.76 5.97 16.63 18.05
OC5 (SH43) 0.96 5.01 --- ---
OC6 (SH38) 2.55 6.65 22.00 ---
OC7 (NH4) 3.68 6.30 10.92 13.65
OC8 (MPE) 7.66 9.65 12.38 17.00
OC9 (NH17) 3.09 5.99 7.82 11.37
Average 3.71 6.96 12.73 16.16
Travel Demand Modelling and Transport Networks
Economic Forecasts
JobsPersonal Income
India andMumbai
Economics
Base Year Residential and
Employment Location
Land useAllocation
House holds, Service Emp
locations
Zonal Data
Vehicle Availability
Model
Trip Gen. Models
House holds by vehicle available
Trips by Purpose
Highway Network
Transit Network
Zonal cost and time Data
Trip Distribution
Model
Mode Choice Model
Time of Day Factors
Trip Tables by Purpose
Trip Tables by Purpose and
modes
Highway and Transit Trip Tables by
Time Periods
Trip Assignment
Model
Highway and Transit
volumes and travel times
Region Growth
Forecast of Analysis
Zones
Traffic Analysis
Zones
INPUTS MODELS OUTPUTS
Network data
Estimating
Travel
Demand
Household Category Sub-Models
Trip End Model
Trip Distribution Model
Highway Networks
Transit Networks
Modal Choice Model
Matrix Manipulation
Road Network
Inventories
Roadside Interview Surveys
Household Interview Surveys
Transit Passenger Surveys
Transit Network Surveys
NMT Matrices
Transit Matrices
Highway Matrices
External Trip
Matrices
Goods Vehicle
Matrices
Traffic Assignment Model
Convergence
Model Outputs
External
Trip Model
GoodsVehicleModel
Yes
NoNo
Travel Demand Modelling Framework
National Urban Transport Policy • Encourage public transport
Encourage greater use of public transport enabling the establishment of quality focused multi modal public transport systems that are well Integrated providing seamless travel across modes
• Integrate Land use with transportEncouraging integrated land use and transportation planning so
the travel distances are minimized and access to livelihoods education and other social needs
• Transport to guide development Incorporating urban transportation as an important parameter at the urban planning stage rather than being a consequential
requirement.
• Provide equitable allocation of space Bringing about more equitable allocation of road space with people rather than vehicles as its main focus
Concept for DevelopmentIntensification Focused onTransportation Corridors
Potential greenfield develop-ment areas for predominantly
residential uses in plannedcommunities including
related service uses andemployment
Higher order nodes/ corridors/centres where
offices are the predominant (but not exclusive) employment use.
Higher density mixed use developments encouraged close
to rail and Metro stations
Predominantly “clean” industrialemployment areas generallyaccommodating employment
uses not compatible withhigher density nodes or requiring significant land
areas
Long Term (2031)Metro and Sub-urban Network Long Term (2031)Highway Network
YearCumulative Length (km)Metro Sub-urban
2016 208 2372021 318 2372031 450 248
Year Cumulative Length (km)2016 9822021 12292031 1739
Multi-Modal Corridors
Virar-Alibaug Multi-Modal Corridor (MMC)
MMC From Virar- Alibaug Length of 140 km (Approx.) 4+4 lanes (other traffic including
BRTS) +Service Roads Metro (In middle of the Corridor) Utility Corridor (Under ground) Non Motorized Transport (Cycles) lane Estimated Cost : INR 100 billion
Right of Way Requirements
100
100
100
80
80
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
80
100
100100
The Right of Way (ROW) shown for each segment of the proposed Regional Road Network is the preferred ROW width. However , an absolute minimum width of 80 m is required. Finalisation of the ROW’s require, detailed feasibility studies specific to each corridor.
Metropolitan Regional Roads
ROW, 100 m100
LEGEND
External Travel Demand
Demand Forecast: Horizon Year
Demographic Data
Decadal Population data from 1921 to 2001 was collected for various States outside Maharashtra,
Decadal Population data from 1971 to 2001 was collected for the Taluks and Districts within Maharashtra from Census.
Demand Forecast: Horizon Year
Economic Data
Net State Domestic Product / Net District Domestic Product
NSDP and NDDP for the states and districts of Maharashtra was collected from Economic Survey of India for the financial years 2000 to 2004 (at constant prices 1993-94).
The Compound Annual Growth Rate (CAGR) was calculated after compiling the data for the detailed zone level.
Demand Forecast: Horizon YearZoning System
Demand Forecast: Horizon Year
For the estimation of future flows in study area, MMR was considered as a single zone and the 27 external zones of detailed zoning system were considered.
The zonal growth factors were estimated from the economic growth rate (NSDP / NDDP growth rate) in respective zones,
Description
Growth Rate (%) Description Growth Rate (%)
B T P B T P
1-MMR 3.00 5.90 11.68 3014-Solapur, Osmanabad 0.84 0.16 1.07
3001-Palghar 2.55 4.88 9.70
3015-Buldana,Washim,Aurangabad,Jalna, Hingoli, Parbhani, Nanded, Latur, Beed, Ahmadnagar 2.69 4.06 8.65
3002-Vada 1.79 4.88 8.88
3016-Akola, Amravathi, Nagpur, Gondia, Bhandara, Wardha, Chandrapur, Gadchiroli, Yavatmal 1.72 7.08 12.00
3003-Shahapur 2.18 4.88 9.293017-Nandurbar, Dhule, Jalgaon,
Nashik 2.16 6.19 11.20
3004-Murbad 1.80 4.88 8.90 3051-Gujrat 2.03 5.52 10.07
3005-Vikrumgad, Jawahar, Mokhadai 2.25 4.88 9.37 3052-Indore 3.45 3.02 7.91
3006-Talasari, Dahanu 2.13 4.88 9.25 3053-MP, Chattisgarh & Orissa 2.04 3.02 6.43
3007-Kholapur, Pen 2.49 3.42 7.49 3054-Delhi 4.27 6.21 13.51
3008-Sudhagad 1.13 3.42 6.073055-Haryana, Punjab, Rajasthan,
Himachal Pradesh & JK 2.01 4.12 8.00
3009-Alibag, Murud 1.38 3.42 6.33 3056-UP, Bihar 1.65 2.95 5.94
3010-Roha 1.95 3.42 6.93 3057-Andhra Pradesh 1.59 3.92 7.28
3011-Mangaon, Tala, Shrivardhan, Mhasla, Mahad, Poladpur 1.01 3.42 5.94 3058-Karnakata, Kerala 1.74 4.58 8.40
3012-Satara, Ratnagiri, Sangli, Kolhapur, Sindhudurg 1.51 4.34 7.80 3059-Tamilnadu 1.34 4.67 8.11
3013-Pune 2.78 3.47 7.883060-WB, Assam, Meghalaya,
Arunachal Pradesh & Mizoram 2.05 4.58 8.72
B: Bus T: Truck P: Private Veh’s
Demand Forecast: Horizon Year: Goods Traffic
ZoneBase Horizon
Trip Production Trip Attraction Trip Production Trip Attraction
2 94 76 397 330
3 553 515 2410 2314
5 448 409 1893 1771
7 619 569 2392 2257
9 1043 922 3967 3684
12 575 509 2383 1960
15 1281 1157 5314 4993
16 768 670 3160 2713
21 283 303 1111 1161
24 164 138 673 562
27 436 449 1921 1917
30 329 378 1441 1564
Demand Forecast: Horizon Year: Goods Traffic
ZoneBase Horizon
Trip Production Trip Attraction Trip Production Trip Attraction
33 523 544 2196 2296
34 135 115 626 564
38 1063 1004 4678 4304
40 2321 2032 9434 8463
43 2918 2583 12158 10713
45 183 160 923 833
49 702 641 3076 2647
51 487 432 1981 1745
52 135 119 556 464
54 117 78 421 315
55 482 439 1664 1380
56 186 135 785 626
60 909 848 3970 3732
63 1956 1697 8924 7914
69 25 30 100 137
70 155 125 614 435
Total 18 887 17 076 79 168 71 794
SCALE:Max. Trips: 2284411422 TRIPS=1.0 Unit
GOODS-HORIZON
Demand Forecast: Horizon Year: Bus Traffic
Bus Movement Base % Horizon %
Internal - External 3022 47% 5569 47%
External - Internal 3338 52% 6145 52%
External - External 119* 2% 147* 1%
Total 6479* 100% 11861* 100%
Note: * After duplication is Subtracted
Base Horizon
Trip Production
Trip Attractions
Trip Production
Trip Attractions
3022 3338 5569 6145
17 Inter-State/ Inter-City Bus Terminals
6 Inter-City rail Terminals 5 Major Truck Terminals and 10
Mini Truck Terminals 13 Passenger Water Transport
(PWT) Terminals
Proposed Terminals
!.
!.!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
Rural MMR
Vasai/ Virar
Greater Mumbai
Navi Mumbai/ CIDCO
Pen/SEZ
Sion
Nancy
Thane
Kurla
Dadar
Parel
Kalyan
Panvel
Borivli
Bhiwandi
Mumbai Central
Rural MMR
Alibag
Proposed Inter State Bus Terminals
1. Near Wadala Truck Terminal, MCGM
2. Near Mira-Bhayander
3. Kalyan area
4. Panvel area
1
2
3
4
Proposed Inter State Bus Terminals (2005-2008)
Existing Bus Terminals
Proposed Inter State Bus Terminals (2009-2031)
!.
!.!.
!.!.
!.
!.
!.
!.
!.
!.
!.
!.
Rural MMR
Vasai/ Virar
Greater Mumbai
Navi Mumbai/ CIDCO
Pen/SEZ
Sion
Nancy
Thane
Kurla
Dadar
Parel
Kalyan
Panvel
Borivli
Bhiwandi
Mumbai Central
Rural MMR
Alibag
Proposed Inter City Bus Terminals
1. Western Suburbs of MCGM: In between Bandra and Borivali
2. Eastern suburbs of MCGM: In between Kurla and Mulund
3. Western part of Thane Municipal Corporation area
4. Nerul in NMMC
5. Kalyan Dombivali Municipal Corporation area
6. Vasai/ Virar area
7. Pen-SEZ area
8. Bhiwandi-Nizampur MC area
9. Mira-Bhayandar MC area
10. Navgarh-Manikpur Municipal Council area
11. Alibagh Municpal Council area
12. Karjat Municipal Council area
13. Badlapur Municipal Council area
Existing Bus Terminals
Proposed Inter City Bus Terminals (2008-16)
Proposed Inter City Bus Terminals (2017-21)
Proposed Inter City Bus Terminals (2022-31)
1
2
3
4
5
6
7
89
13
10
11
12
Proposed Navi Mumbai Airport
1
5
2
3
6
4
1. Near Vasai Virar
2. Near Kalyan
3. Near Khandeshwar sub-urban railway station and retaining the Panvel as en-route station
4. Intersection of MTHL Metro corridor and Belapur-Uran Railway Line
5. Near Bhiwandi (Near Vasai Road-Diva Line)
6. Near Jite on Panvel-Thal Railway Line
Proposed Inter-City Rail Terminals
Proposed Inter-City Rail Terminals (2008-2016)
Existing Inter-City Rail Terminals
Proposed Inter-City Rail Terminals (2017-2021)
Proposed Inter-City Rail Terminals (2022-2031)
Proposed Navi Mumbai Airport
1
5
4
32
Proposed Truck Terminals
1. Near boundary of MMR on NH-8 (Mumbai-Ahmedabad)
2. Near boundary of MMR on Mumbai Pune Expressway
3. Near JNPT/NMSEZ/MMSEZ
4. Near the proposed international airport in Navi Mumbai
5. On NH-3 (Mumbai-Nashik)
Proposed Major Truck Terminals (2008-2016)
Proposed Major Truck Terminals (2017-2021)
Proposed Major Terminals (2022-2031)
Proposed Navi Mumbai Airport
10 Mini Truck Terminals (One in each cluster except Island
cluster)
Major Truck Terminals
Proposed Mini Truck Terminals (2008-2031)
Summary of Preliminary Cost Estimates Proposed Transport Networks
Horizon Years 2031, 2021 and 2016
Component
2008- 2031 2008- 2021 2008- 2016
Lengthkm
CostRs Crores
Lengthkm
CostRs Crores
Lengthkm
CostRs Crores
Metro System 450 1,10,095 316 82,707 204 59,623
Suburban Railway System 241 30,978 231 28,670 231 27,920
Highway System 1660 57,412 1114 44,844 836 31,173
Highway Corridors with EBL
77 1,670 111 2,000 147 11,079
Bus System 4,280 2,150 1,104
Passenger Water Transport
480 480 480
Truck Terminals, Inter-Bus and Rail Terminals
3,040 2,038 1,126
Total 2,429
2,07,956
1,772
1,62,890
1,418
1,32,504
US $ 50.72 Billion
US $ 39.73 Billion US $ 32.32 BillionNote:
1. The cost estimates are @ 2005-06 prices2. The metro system cost includes the cost of rolling stock3. The sub-urban railway system cost includes the cost of rolling stock for new lines, capacity enhancement of the to the existing sub-
urban railway system
Funding Sources
Sl.No.
Transport System
Estimated Total Cost (Rs. Crore)
@ 2005-06 Prices
Inter Governmental Transfer (%)
Development Charges
(%)
Borrowing (%)
Private Investment
(%)
I Metro System 1,10,095 15 25 0 60
II Sub-Urban Railway System 30,978 30 30 40 0
III Highway System 57,412 25 25 30 20
IV
Highway Corridors with Exclusive Bus Lanes (EBL) 1,670 25 25 30 20
V Bus System 4,280 25 25 30 20
VI Passenger Water Transport 480 12 12 16 60
VII Terminals 3,040 21 21 28 30
Total Investment, Average % Funding Sources
2,07,956 ( US$ 43324
million)
20 28 12 40
Potential Need for Re-allocation from Private to Development Charges
Particularly for Metro
Creation of Dedicated Infrastructure fund for MMR for implementation of Proposed Infrastructure Projects in MMR
Steps taken so far….
UMMTA established under Chairmanship of Chief Secretary;
MMRDA has submitted proposals on Development Charges to GoM;
All the ULBs requested to include the proposed arterial roads and higher order highway corridors, metro corridors, sub-urban rail corridors, monorail corridors in the Development Plans for the reservation of RoW;
All the ULBs (Central Railway,Western Railway directed reseve the land for respective terminals recommended by CTS.
Thank You
For Queries:[email protected]