Transcript
PresentedTo You
By
BELT MAINTENANCEGROUP
The Project
• THE WORLD’S LONGEST SINGLE FLIGHT CONVEYOR SYSTEM
• 40.6 KM OF 36” WIDE ST900 STEEL CORD CONVEYOR BELTING
• SPRING 2005
PARTICIPANTS
SAFETY IS ALWAYS #1
THE SYSTEM
THE BELT
BELTING STAGED
ROLL #1
READY TO BEGIN FIRST SPLICE
REMOVING THE COVERS
STRIPPING THE CORDS
CLEANING THE CORDS
CLEANING THE BEVEL
MEASURING THE CORDS
CUTTING THE CORDS
APPLYING CEMENT
PREPARING BOTTOM COVER
APPLYING BOTTOM COVER
LAYING THE FIRST CORDS
LAYING THE FINAL CORDS
READY FOR TOP COVER
INSTALLING TOP COVER
INSTALLING VULCANIZER
COMPLETING THE VULCANIZER
INSTALLING ONTO SYSTEM
FIRST BELT ON SYSTEM
COMPLETED SYSTEM
COMPLETECONVEYOR SERVICES
BY
BELT MAINTENANCEGROUP
WWW.BELTMAINTENANCE.COM