Agenda overview: Paul Govaart
1. Vopak Asia – Introduction
2. Singapore
3. China
4. Asia
5. Summary of projects
4
Vopak’s presence in Asia:a unique network coveringmost major ports
Number 1 in Asia:20 terminals in 10 countries
Employees:1,281
Occupancy rate 1H 2007:97%
Revenues Asia FY06:EUR 121.4 mln
EBIT Asia FY06:EUR 74.9 mln
5
Vopak’s footprint in AsiaAustralia
– Sydney, DarwinIndonesia
– Tanjung PriokSingapore
– Banyan, Sakra, Penjuru, SebarokMalaysia
– KertihThailand
– MapTaPhutVietnam
– Ho ChiMinhPakistan
– KarachiChina
– Tianjin, Caojing, Zhangjiagang, Ningbo, Xiamen, Lanshan
Japan– Yokohama, Kobe, Kawasaki
Korea– Ulsan
6
Occupancy rates and capacityOccupancy rates Asia
96% 96%95%
96%
98%97%
90%
95%
100%
2002 2003 2004 2005 2006 1H 2007
Storage capacity Asia (mln cbm)
0 1 2 3 4 5 6
20022003
200420052006
20072008
7
Good results in Asia
EBIT Asia, mln Euro
0
25
50
75
100
2003 2004 2005 2006
Revenues Asia, (mln Euro)
0
25
50
75
100
125
150
2003 2004 2005 2006
8
Agenda overview: Paul Govaart
1. Vopak Asia – Introduction
2. Singapore
3. China
4. Asia
5. Summary of projects
9
Singapore ‘independent’ storage scene
5
3
11 16
14
1
1513
2
4
6
10
12
8
79
Penjuru
Banyan
0123456789
10
2005 2006 2007 2008 2009
X 1,
000,
000
cbm
Singapore’s 3rd party capacities
10
Vopak Singapore Terminals
Sebarok
Banyan
Penjuru
Sakra
11
Singapore remains the petroleum HUB for Asia& Australia• Forecast product balances predict continuing west to east
movement, with growing role for Singapore in blending and logistic hub location
• Singapore largest bunkerport in the world ( 30 M ts)
• Singapore big refinery centre and to grow
• Legislative & physical environment supports trading community
12
New petrochemical complexes @ Jurong
• Forecast product balances predict continuing west to east movement, with growing role for Singapore in blending and logistic hub location
• ExxonMobil to build 1 m. C2 cracker in Singapore (US$ 4 billion)
• Shell’s US$ 3b. petrochemical complex firmly on track
• Jurong Aromatics to construct US$ 2 billion refinery & Aromatics complex
• New downstream industries emerging
13
Vopak Singapore – Banyan Terminal
Expansion of Banyan Terminal
2006 2007 2008 2009
371.800 cbm 165.000 cbm 320.000 cbm 397.500 cbm1.25 M
14
Agenda overview: Paul Govaart
1. Vopak Asia – Introduction
2. Singapore
3. China
4. Asia
5. Summary of projects
15
Ningbo
Lanshan
Xiamen
Tianjin
• Vopak present in China in the 1950’s with its former trading division
• In 1979 Vopak and Cosco created the first Sino-Foreign JV outside China since the Cultural Revolution
• Vopak was one of the first foreign companies in freight forwarding in the 1980’s in China
• Vopak is the first and largest international tank terminal operator in China:
• Ningbo Terminal in 1993
• Xiamen Terminal in 1994
• Lanshan Terminal in 2000 (acquisition)
• Tianjin Terminal in 2003 (acquisition)
• Caojing Terminal in 2004
• Zhangjiagang Terminal in 2007
Zhangjiagang
Guangzhou
Vopak and the Vopak Joint Ventures employs 600 people and handles 6 millions MTPA with a capacity of 880,000 cubic meter in China
ShanghaiCaojing
Nanjing
Vopak in China
16
China’s Oil
0123456789
Million barrels per day
1994 1996 1998 2000 2002 2004 2006
Consumption Production2012 – 95.8m barrels/dayWorld production 84m bpd (2005)
Source: Energy Information Administration
17
Shanghai Chemical Industry Park
18
Vopak established in Chemical storage
Vopak China – Zhangjiagang Terminal
Division: Asia - ZhangjiagangStart of operations: Q2 2008Capacity expansion: 72,400 cbmProducts: methanol, PO, others
19
Agenda overview: Paul Govaart
1. Vopak Asia – Introduction
2. Singapore
3. China
4. Asia
5. Summary of projects
20
Indonesia
JavaJava
SumatraSumatraKalimantanKalimantan
21
Tanjung PriokMerak
Vopak terminal serve Jakarta area
22
Vopak Jakarta Terminal
Tankfarm
Jetty
Artist impression of Vopak Jakarta Terminal
Underseapipelines
23
Thailand
India
China
Indonesia
Malaysia
THAILANDVietnam
MapTaPhut Industrial Estate
Thai Tank
Thai Tank
Dow
BayerATC
PTT CH I-1
PTT CH I-4
MTT Tank Terminal
Solid Bulk Port
Oil Refinery
Buffer tank farm
Coal Power Plant
RRC Tank Farm
HMC
TOL
BPE
TPAC
New DOW
25
Phase #2: 80,850 m2
Pipe corridor: 63,727 m2
Jetty #1: 43,500 DWT
Jetty #2: 80,000 DWT
Jetty #3 : 10,000 DWT
Phase #3: 16,000 m2
Phase #1: 125,700 m2
Phase #4 : Phase #4 : 64,000 m264,000 m2
Thai Tank Terminal
26
Vietnam
India
China
Indonesia
Malaysia
THAILANDVIETNAM
27
Vietnam’s growing economy drives demand for chemical products
Source: Vietnam Chamber of Commerce and Industry
Vietnam Real GDP (growth, y/y)
7.7
8.4
8.2
8.5
8.7
8.5
88.2
7.6
7.8
8
8.2
8.4
8.6
8.8
2004 2005 2006e 2007f 2008f 2009f 2010f 2011fYear
Perc
enta
ge, %
Vietnam Chemicals Imports
0
100
200
300
400
500
600
700
800
900
1,000
2001 2002 2003 2004 2005 2006Year
' 000
mta
28
Vopak terminal in HoChiMinh, Vietnam
Division: Asia - VietnamStart of operations: Q4 2006Capacity expansion: 40,000 cbmProducts: xylene, toulene, IPA
29
India
30
India has experienced steady growth in recent years
Source: Country paper from India – India Chemicals & Petrochemicals Manufacturer’s Association
31
India: Trade Pattern of Oil Products
(kb/d)
(1,800)(1,600)(1,400)(1,200)(1,000)
(800)(600)(400)(200)-200400600
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2010
2012
LPG Naphtha Gasoline Kero/jetDiesel Fuel Oil Other
Net Exports
Net Imports
Source: FACTS
32
Australia
33
Sydney - Botany
• Growing fuel import volume• Terminal is connected to major pipelines
34
Darwin
• Fastest growing region in Australia• Driven by mining boom
35
Agenda overview: Paul Govaart
1. Vopak Asia – Introduction
2. Singapore
3. China
4. Asia
5. Summary of projects
36
SingaporeBanyan; Phase 3 – 320k cbm
Shell – 7.5k cbmPhase 4 – 390k cbm
Penjuru; Phase 1 – 22k cbmSebarok; 216k cbm
Summary of projects
S.KoreaBASF / PO- 5,000 cbm
AustraliaDarwin – 11k cbmSydney site B – 83k cbm
Indonesia / JakartaPhase 1 – 250,000 cbm
ThailandBiodiesel – 54,000 cbmPhenol – 10,000 cbm
Vietnam / HoChiMinhChemicals – 40,000 cbm
Pakistan KarachiEthylene – 10,000 cbm
ZhangJiaGangMethanex / MEOH – 72k cbmLyondell / PO – 11k cbmCaojingBayer / Benzene – 40k cbm
Recently commissionedAnnounced
Under construction
Value of projects:
Euro 363.5 million
37