Download - Project Induction Program 11.02.2016
Quality Training
#3
Project Induction Program
February 11, 2016
Quality Department 1
Session-18
“Good Morning”
&
Welcome to All !
AKo/EIt
Project Induction Program
New Team Members
AKo/EIt
To
Overview
1. Introduction
2. Brief Details of the Contracts (SC & CC)
3. Project Stakeholders & Management
4. Supervision Site Management Teams
5. General SC’s Responsibilities
6. Project Scope of Work
7. Project Standards & References
8. Brief Details of the Project (Disciplines wise)
9. Major Project Quantities
10. Project Submittals
11. Audits & Evaluations
12. Progress Photographs
13. Progress Videos
AKo/EIt
1. Introduction
The purpose of this induction is to formally
introduce each party on the new project, gain an overview understanding of the contract
requirements and Supervision Consultant’s role
and management undertakings.
1.1 Introduction of the Parties:
PMC & SC Management
1.2 Introduction of the SC Department/Section
and Teams
1.3 Introduction of individual SC Personnel for
Contract 1
AKo/EIt
2.1 Supervision Consultant’s (SC) Contract
Professional Services Agreement For Pre and Post-Contract
Professional Consultancy Services for the Expressway
Projects Group 8a
Group No. Group 8a Projects
Group 8a Projects P007-C1, P007-C2, P007-C3, P007-C5
Project I.D. No. IA 12/13 DS 002-ST
Agreement No. P2013/39
Authority /Client Public Works Authority (PWA) = ASHGHAL
AKo/EIt
2.2 Construction Contractor‘s (CC) Contract
CONTRACT-1 (P007-C1) Project
Contract Name: Construction and Upgrade of Rayyan
Road Project 7: Contract 1 West of
New Rayyan R/A to East of Bani Hajer
R/A
Contractor: Sixco – Boom CC Joint Venture
Project No./Contract No: P007-C1 /C2013/88
Project Code lA 12/13 C 057 ST
Letter of Acceptance 23 December 2013
Agreement Date: 09 January 2014
Commencement Date: 16 February 2014
Contract Duration: 900 days Construction+400 days
Maintenance
Completion Date: 03 August 2016
AKo/EIt
Central Area /P007 -1 Key Plan
AKo/EIt
General Plan Layout – C1
AKo/EIt
Site
Office
Site Office Location – C1
AKo/EIt
Site
Office
Site Office
Site Office Location – C1
AKo/EIt
3. Project Stakeholders & Management
3.1 Client = PWA(Ashghal) – Expressway Department Client’s Representative – Mr. MANAR H.Y. ABDUGHALWA
3.2 Programme Management Consultant = KBR – Engineer PMC Project Manager – Mr. ANGELOS VOLANIS
PMC Senior Site Engineer– Mr. REYNALDO MIRANDA
PMC Senior QA Engineer– Mr. ANSHUL PARASHAR
PMC HSE Engineer– Mr. SHAJI THOMAS
3.3 Supervision Consultant = EGIS International Project Director – Mr. YANNICK CHAUMET
Senior Resident Engineer (SRE) – Mr. ADRIAN PETER CLEASBY
3.4 Design Consultant (DC) = KEO International Consultant
3.5 Contractor = Six Construct – Boom CC (JV) Project Director – Mr. BERNARD PATZE
Deputy Project Director – Mr. RAMI SAAIFAN
AKo/EIt
MMUP
KAHRAMAA
(Water & Electricity)
ASHGHAL Drainage
Qatar Petroleum (QP)
QTel (Ooredoo)
Vodafone
Qatar National Broadband
Network (QNBN)
ICT Qatar
MoI – DSS
Civil Defense Dept.
Qatar Gas
Qatar Armed Forces (QAF)
Qatar Rail Interface
Qatar Foundation
3. Project Stakeholders & Management Cont’d
AKo/EIt
4. Supervision Site Management Teams
SENIOR RESIDENT ENGINEER (SRE)
(Adrian Peter Cleasby)
1. GENERAL SUPPORT SERVICES TEAM – Public Relation Officer
2. QUALITY TEAM – Quality Manager, Engineer, Inspectors
3. SAFETY TEAM – Safety Engineer / Officers, Road Safety Auditor.
4. STRUCTURES & TUNNELS TEAM – Resident Engineer, AREs, Inspectors
5. UTILITIES TEAM - Resident Engineer, Assistant REs, Inspectors
6. M&E TEAM - Resident Engineer, Senior/Electrical Engineers, Inspectors
7. ROADS TEAM - Resident Engineer, Assistant REs, Inspectors
8. SUPPORTING TECHNICAL STAFF - Senior/Materials Engineers/Testing
Inspectors, Landscape Engineer/Inspector, Senior Pavement
Specialist, Senior QS/QS, Senior Highway Surveyor/Surveyors, Design
Co-ordinator / CAD operators, , Document Controllers, Bilingual
Secretaries, Logistic Officer, Drivers & IT Support.
AKo/EIt
5. General SC Responsibilities
Fulfill the role of construction supervision, implement all
requirements and demonstrate conformance with the
contract requirement;
Review, approve or reject CC’s submittals and
deliverables including baseline, programs, proposals,
claims and billings;
Ensure CC perform their contractual obligations with
compliance through out the course of the project.
Ensure Quality Assurance and safety for the project;
Submit all SC’s document requirements and reports as
per schedules;
Ensure document management system and numbering in
accordance with Engineer’s (PMC) required format,
coding and sequence;
AKo/EIt
5. General SC Responsibilities
Ensure CC’s follow their procedures, Method Statements,
ITPs including materials procurements and installations
with quality workmanship;
Ensure CC’s engage with approved Sub-cons, suppliers
including plants & laboratories that could deliver the
technical, document and workmanship requirements for
the project;
Ensure required sampling, testing and results for all
permanent construction materials;
Maintain reliability of Plants, Labs, measuring & testing
equipment;
Response to all types of inspection request (IR) &
Material Delivery to Site (MDS);
Cont’d
AKo/EIt
5. General SC Responsibilities
Exercise preventive measures against nonconformity &
resolve NCR/CAR issues with approved corrective
measures;
Maintain good line of communication and coordination
with PMC & CC;
Conduct audit, surveillance walk and evaluate the CC’s
KPI regularly;
Resolve any Client’s complaint as soon as possible;
Capture lessons learned for Continual Improvement;
Ensure CC perform commissioning (as applicable) prior
to handover;
Deliver the project according to the contractual obligation.
Cont’d
AKo/EIt
6. Project Scope of Work
1. Site offices and other installations;
2. Traffic diversions, temporary traffic control and management;
3. Structural survey of all properties within 20m of the Right
of Way corridor for the construction project;
4. Site clearance, including demolitions, removal of signs,
lighting columns and other street furniture;
5. Reinforced concrete pedestrian underpass;
6. Reinforced concrete vehicle structures;
7. Earthworks, including excavation and
recycling/disposal of existing road pavement,
temporary shoring etc.;
AKo/EIt
8. Surface water drainage, including gullies, connections
to existing storm sewers and soak-ways; 9. Construction of kerbs, footways and paved areas; 10. Construction of high specification flexible pavement;
11. Directional and other traffic signage and road markings;
12. Provision of sign gantries;
13. Traffic signals (design and build element); 14. Extensive high specification hard and soft landscaping,
including varied paving, architectural features, arts
cape, tree planting, irrigation, and streetscape furniture;
Cont’d
6. Project Scope of Work
AKo/EIt
6. Project Scope of Work
15. Public and private utility services: provision for future
services, diversions and protection of existing services
for the following:
a) Water supply network;
b) Sewage collection and disposal systems;
c) Treated sewerage effluent;
d) Extensive EHV, HV, MV, LV electricity networks;
e) Street lighting, underpass and structure lighting;
f) Q-Tel, Vodafone and Qatar National Broadband
Network;
g) Qatar Armed Forces (QAF) network;
h) Ministry of Interior Security System Department
network (MoI-SSD).
Cont’d
AKo/EIt
7. Project Standards & References
1. Group 8a, Professional Services Agreement (P007-C1)
2. Qatar Construction Standards / Specifications 2010
3. Interim Advice Notes -IANs (Amendments to QCS 2010)
4. Contract Drawings / IFC Plans (Rev.CA, CB, CC & CD)
5. Supervision Consultant Quality Requirements Specification:
EXW-GENL- 0000-QM-KBR-SS-00015-003 Rev. A2;
6. Contractor’s Contract No. C2013/88 (Tender# MRPSC/008/2012-2013/L)
7. Project Quality Plan (PQP):
EXW-P007-0101-QM-EGI-PL-00001 Rev.CC;
8. ISO 9001:2008 Quality Management System Requirements.
9. Standard Document Numbering and Coding: EXW-GENL-0000-DM-KBR-SS-00004-001 Rev.22
AKo/EIt
The total length is 3.1 km
The length of side roads is 2.0 km
The length of service roads is approximately 5.8 km
The scheme will provide four traffic lanes in each direction
(plus turning lanes at junctions) with a dividing median
Three interchanges (R2-At grade, R3-UP, R4-UP).
8.1 Road Works
8. Brief Details of the Project
AKo/EIt
8.2 Main Typical Section
AKo/EIt
8.3 Road Works:
Junction R2 (currently named Q-Tel R/A) Al Rayyan Road/Al Wajbah Street Interchange: at grade right- in/right-out
junction with Al Rayyan Road free flow at grade
AKo/EIt
8.4 Structural Works: Junction R3 (currently named Al Shafi R/A)
AI Rayyan Road/AI Salam Street Interchange: Two level interchange with Al
Rayyan Road free flow beneath a signalized junction and a free flow ramp
for northbound to westbound traffic.
AKo/EIt
Junction R4 (currently named Castle RIA)
AI Rayyan Road/AI Qalah Street interchange: two level interchange with AI
Rayyan Road free flow beneath a signalized junction.
Cont’d
AKo/EIt
Architectural Design for Underpass Retaining Wall
Cont’d
Option 1
AKo/EIt
Architectural Design for Underpass Retaining Wall
Cont’d
Option 2
AKo/EIt
Architectural Design for Underpass Retaining Wall
Cont’d
Option 3
AKo/EIt
8.5 Typical Landscaping
(Footpath, Cycle-path & Bus Stop)
AKo/EIt
Public and private utility services (provision for future services,
diversions and protection of existing services) for the following:
Storm water Drainage works with 4.8 km Micro-Tunnel/3m Dia
Water supply network
Electricity works with 1.2 km Power Galleries & 6 Substations
Street lighting
Telecommunications Works
Qatar Armed Forces (QAF) network
MoI – SSD (Security System Department)
ITS Works
Waste Water and TSE Works
8.6 Utilities Works
AKo/EIt
Micro-tunnel (length) - 4,800 m (3m Dia)
Power Galleries (length) - 1,200 m
Concrete Works - 270,000 m3
Reinforcement - 20,000 Tons
Asphalt works - 450,000 m2
Electrical cables - 65,000 m
Pipes - 52,000 m
Excavation or Filling - 500,000 m3
9. Major Project Quantities
AKo/EIt
Project Organizational Structure
Project Management Plan (PMP)
Project Quality Plan (PQP) & Procedures
Project Specific Logistic Plan
HSE Plan & Procedures
HSE Reports (Weekly/Monthly Statistics, Audit, Incident)
Monthly Progress Report
Quality Reports (Quality-Monthly , Questionnaire, Audit)
Daily Report
Key Performance Indicators (KPI) Evaluation Report
NCR Register and Action log SC’s Claims & Billings.
10. Project Submittals
AKo/EIt
10.1 Supervision Consultant (SC)
Clause 14 Programme of Works (Baseline)
Project Quality Plan & Procedures
Method Statements/ Risk Assessments
Materials’ Schedule /Procurement Schedule
– Long Lead Items;
Sub-Contractor & Suppliers Approvals
Project List of applicable Standards
Construction Management Forms
HSE Plan and Safety Procedures
Construction Environmental Management Plan
Traffic Control & Management Plan
Proposal, claims & billings
10.2 Construction Contractor (CC)
AKo/EIt
10. Project Submittals
Inspection & Test Plans with Checklists
Monthly Report (Progress, Quality & Ashghal’s -QA/QC
Site Questionnaire)
HSE Reports (Weekly/Monthly Statistics, Audit, Incident)
Prequalification Schedule (sub-con & Suppliers-materials)
Material Procurement Report
List of Manpower/Equipment
Organizational Chart
Curriculum Vitae (CVs) of Key Personnel
Shop Drawings
Inspection Request (IR), Test Reports, Certificates
Warrantees, O & M Manuals
Cont’d
AKo/EIt
10.2 Construction Contractor (CC)
10. Project Submittals
11.1 Types of Audits
11.1.1 Quality Assurance Audit
Internal Audit – within SC Site Management Teams
External (2nd Party) Audit – To CC , Sub-cons & Suppliers
System Audit – Needed Plans, Procedures &
Management
Compliance Audit – On System & process work activities
Product Audit – On particular deliverable products
Close-out Audit - to verify the preparation of deliverables
against contract requirements.
11.1.2 HSE Audit
11.1.3 Road Safety Audit
11.2 Key Performance Indicators (KPI) Evaluation
11. Audit & Evaluations
AKo/EIt
12. Progress Photographs
AKo/EIt
Road Works
Major Diversions
12. Progress Photographs
AKo/EIt Temporary Road Diversion (26.12.2014)
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt Temporary Road Diversion (24.04.2015)
P007-C1
P005
12. Progress Photographs
AKo/EIt Temporary Road Diversion (24.04.2015)
P007-C1
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
Cable Tunnel, Underpasses,
Diversions etc.
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
12. Progress Photographs
AKo/EIt
13. Progress Videos
AKo/EIt
Monthly Progress
January - 2016
AKo/EIt
Thank you!
Presentation by
Quality Team @ C1
AKo/EIt