Information on Projects in Andhra Pradesh
Contents
Project 1: Integrated Sports Complex at Tirupati ............................................................... 2
Project 2: International school at Tirupati ......................................................................... 5
Project 3: International school at Nellore .......................................................................... 7
Project 4: International school at Vishakhapatnam ............................................................ 9
Project 5: Greenfield Airport in Bhogapuram, Vizianagaram ........................................... 12
Project 6: Greenfield Airport in Dagadarthi, Nellore District ........................................... 13
Project 7: Greenfield Airport in Orvakal, Kurnool ........................................................... 15
Project 8: National Waterway No.4 ................................................................................ 17
Project 9: Convention Centre at Vijayawada ................................................................... 22
Project 10: Beach Road Project ....................................................................................... 24
Project 11: Power Distribution for Amaravati .................................................................. 26
Project 14: Solid waste management system for Amarvati Capital city .............................. 32
Project 15: Development of Government HoD buildings .................................................. 34
Project 16: Development of affordable housing for economically weaker sections .............. 36
-
7/24/2019 Projects in AP State
2/37
2
Project 1: Integrated Sports Complex at Tirupati
Project NameIntegrated Sports Complex at Tirupati
Sector Social Sector
DeveloperProject Location Andhra Pradesh/Chittoor/Tirupati
Physical Parameters
Project Capacity
The sporting facilities in the complexshall encompass the following:
1 Outdoor facilitiesa) Football (FIFA Standard)
cum Cricket stadium (ICC
Standard) with gallery of2600 capacity
b) Athletic (IAAF Standard)with gallery of 900 capacity
c) Aquatic Complex with 2200capacity
d) Tennis Complex with 1000capacity
e) Rock Climbingf) Volley ball 3 courtsg) Kabaddi fields 8 Nosh) Jogging Track 7M Widthi) Skating Rink
2 Indoor facilitiesIndoor Stadium 1 2000 gallerycapacity
a) Badminton Courts - (To beinterchangeably used asBadminton/Volleyballcourts ) 14 Nos
b) Basketball/Volleyball court 1 No
Indoor Stadium 2 2100 gallerycapacity
a) Kabaddi 2 Nos
-
7/24/2019 Projects in AP State
3/37
3
b) Boxing 2 Nosc) Badminton courts 6 Nosd) Squash court 2 Nose) Gymnasium 1 No
3 Other facilitiesa) Academy building including
Dormitories b) Food Courtsc) Amphitheatre 2700
Temporary Galleryd) Guest House Complex - 22
unitse) Studio Apartments 50
unitsf) Shopping Arena and club
houseg) Parking area
Scheduled completion dateConstruction period 3 years startingJuly2016
Present Status
Project tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay
State Govt. relatedCentral Govt. relatedFinancial relatedOthers
Financial Parameters Project Cost INR 310 CroresExpenditure Incurred & Means of Finance
Funds required for project completionAnnuity (INR 52.4 Crores per year for15 years)
Amount & Reasons of overrun (if any)Amount of funding available
-
7/24/2019 Projects in AP State
4/37
4
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2
Email [email protected]
Additional Information
1 Financial IRR 0.33%
2 Concession Period in case of PPPprojects (Years)
18 years
3 Cashflow/Revenueenvisaged perannum fromthe project (RsLakh/Annum)
1. ToDeveloper
Cash Flows with NPV of INR 39.33 crores for 15years including annuity paid by the govt.
2. To StateGovernment
Negative cash flows with NPV of INR (237.4Crores) for 15 years
-
7/24/2019 Projects in AP State
5/37
5
Project 2: International school at Tirupati
Project Name International school at TirupatiSector EducationDeveloper
Project Location Tirupati, Andhra Pradesh
Physical Parameters
Project Capacity
Parameter Details Curriculum Mandatory: IB
or IGCSEOptional:CBSE/ICSE etc.
Grades nursery to 12Number of Students
per classroom
25
Number ofclassrooms
40
Number of Students 1000
Faculty student ratio > 1:16Number of dayscholars
500
Number of residentialstudents
500
Scheduled completion dateDec, 2017 (School Operation) 18 months ofconstruction period.
Present StatusProject tie-ups includingimplementation methodology, rawmaterial tie-ups, off-take arrangements,approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay
State Govt. related
Central Govt. relatedFinancial relatedOthers
Financial Parameters Project Cost INR 62 CroreExpenditure Incurred & Means of
-
7/24/2019 Projects in AP State
6/37
6
FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2
Email [email protected]
Additional Information
1 Financial IRR 13.2%
2 Construction Period (Years) 1.5 years (Phase I 50% capacity)10 years (Phase II 100% capacity)
3 Project Economic Life (Years) 50 years
4 Concession Period in case of PPPprojects (Years)
33 years
-
7/24/2019 Projects in AP State
7/37
7
Project 3: International school at Nellore
Project NameInternational school at Nellore in AndhraPradesh on PPP basis
Sector EducationDeveloperProject Location Nellore, Andhra Pradesh
Physical Parameters
Project Capacity
Parameter Details Curriculum Mandatory: IB
or IGCSEOptional:CBSE/ICSE etc.
Grades nursery to 12
Number of Students per classroom
25
Number ofclassrooms
40
Number of Students 1000
Faculty student ratio > 1:16Number of dayscholars
500
Number of residential
students
500
Scheduled completion dateDec, 2017 (School Operation) 18 months ofconstruction period.
Present StatusProject tie-ups includingimplementation methodology, rawmaterial tie-ups, off-take arrangements,approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay
State Govt. relatedCentral Govt. relatedFinancial relatedOthers
Financial Parameters
-
7/24/2019 Projects in AP State
8/37
8
Project Cost INR 62.6 CroreExpenditure Incurred & Means ofFinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2
Email [email protected]
Additional Information
1 Financial IRR 17%
2 Construction Period (Years) 1.5 years (Phase I 50% capacity)10 years (Phase II 100% capacity)
3 Project Economic Life (Years) 50 years
4 Concession Period in case of PPPprojects (Years)
33 years
-
7/24/2019 Projects in AP State
9/37
9
Project 4: International school at Vishakhapatnam
Project NameInternational school at Vishakhapatnam inAndhra Pradesh on PPP basis
Sector EducationDeveloperProject Location Vishakhapatnam, Andhra Pradesh
Physical Parameters
Project Capacity
Parameter Details Curriculum Mandatory: IB
or IGCSEOptional:CBSE/ICSE etc.
Grades nursery to 12
Number of Students per classroom
25
Number ofclassrooms
80
Number of Students 2000
Faculty student ratio > 1:16Number of dayscholars
1500
Number of residential
students
500
Scheduled completion dateOct - Nov, 2017 (School Operation) 18months of construction period
Present StatusProject tie-ups includingimplementation methodology, rawmaterial tie-ups, off-take arrangements,approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay
State Govt. relatedCentral Govt. relatedFinancial relatedOthers
Financial Parameters
-
7/24/2019 Projects in AP State
10/37
10
Project Cost INR 93.4 CroreExpenditure Incurred & Means ofFinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2
Email [email protected]
Additional Information
1 Brief description of the project Promotion of educational infrastructure is oneamongst the many initiatives being taken up bythe government on a priority basis.
International schools are being promoted toprovide world-class education to the studentsand also as a tool to attract foreign investments
to Andhra Pradesh. It is well known thatavailability of international schools is animportant consideration for non-Indian staff ofMNCs who come to India.
The international School id developed throughPPP (DBFOT model) and Revenue share as thecriteria for selection. The concession period is 33years.
The international school could follow thesyllabus of either IB, IGCSE along with theoption of CBSE/ICSE or any other
international, national or AP State Board. The awareness of international schoolcurriculum (such as IB, IGCSE etc.) isincreasing amongst the parents and therefore thedemand for international schools in the country.It offers benefits such as differentiated learning /curriculum, global student mix, state of the artinfrastructure, opportunity to pursue higher
-
7/24/2019 Projects in AP State
11/37
11
education in globally reputed institutions,faculty quality and diversity etc.
2 Financial IRR 20.1%
3 Construction Period (Years) 1.5 years (Phase I 50% capacity)10 years (Phase II 100% capacity)
4 Project Economic Life (Years) 50 years
5 Concession Period in case ofPPP projects (Years)
33 years
-
7/24/2019 Projects in AP State
12/37
-
7/24/2019 Projects in AP State
13/37
13
Project 6: Greenfield Airport in Dagadarthi, Nellore District
Project NameDevelopment of Greenfield Airportin Dagadarthi, Nellore District
SectorInfrastructure Transportation -Airports
DeveloperProject Location Dagadarthi, Nellore District
Physical Parameters Project Capacity
Scheduled completion dateTentative initiation June 2016.Construction period 2 years
Present StatusProject tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPP-DBFOTDelay vis--vis original scheduleReasons for delay
State Govt. relatedCentral Govt. relatedFinancial relatedOthers
Financial Parameters
Project Cost
Phase I: 76.49 Cr, Phase II: 116.63Cr,O&M 30.9 Cr
Expenditure Incurred & Means of FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]
-
7/24/2019 Projects in AP State
14/37
-
7/24/2019 Projects in AP State
15/37
15
Project 7: Greenfield Airport in Orvakal, Kurnool
Project NameDevelopment of Greenfield Airportin Orvakal, Kurnool
SectorInfrastructure Transportation -Airports
DeveloperProject Location Orvakal, Kurnool District
Physical Parameters Project Capacity
Scheduled completion dateTentative initiation June 2016.Construction period 2 years
Present StatusProject tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPP-DBFOTDelay vis--vis original scheduleReasons for delay
State Govt. relatedCentral Govt. relatedFinancial relatedOthers
Financial Parameters
Project Cost
Phase I: 88.01 Cr, Phase II: 112.48Cr, O&M 30.90 Cr
Expenditure Incurred & Means of FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]
-
7/24/2019 Projects in AP State
16/37
16
Additional Information
1 Financial IRR 13.06% (Equity IRR)
2 Project Economic Life (Years) 66 + 33 years
3 Concession Period in case of PPPprojects (Years)
66 + 33 years
4 Multiplier effects on other sectorsof the economy
In the global economy, every $100 of outputproduced and every 100 jobs generated by airtransport trigger additional demand of some $325and 610 jobs in other industries.
5 Loss of agricultural land (Acres) 613.79 acres
6 Associated environmental risk (air
quality, impact on biodiversity,forest land, water bodies, etc)
Environment Impact Assessment under way.
-
7/24/2019 Projects in AP State
17/37
-
7/24/2019 Projects in AP State
18/37
18
Kakinadacanal 319.50 CroresNorthBuckinghamcanal 300.00 Crores
Commamurcanal 894.00 Crores
Total Amount3044.5
0 CroresExpenditure Incurred & Means of FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]
Additional Information
1 Brief descriptionof the project
The Government of India has declared the Canal System fromKakinada to Puducherry along with Godavari and Krishna riversystem as National Waterway w.e.f 25.11.2008. NationalWaterway No.4 is having total length of waterway Km. 1078from Kakinada to Puducherry. The length of the NW-4 inAndhra Pradesh, Tamil Nadu, and Pondicherry are 888 Km, 188Km, and 2 Km respectively. The cargo identified for NW-4include Coal, Rice, Food grains, Cement, Fertilizers, ForestProducts, Salt and Other Bulk Cargo. The governmentsInfrastructure Mission envisages construction of eight terminals atKakinada, Rajahmundry, Eluru, Kottapatnam, Maipadu,Dugarajapatnam, Vijayawada and Tadepalligudem.
The stretches identified are:1.Krishna Eluru Canal2.Godavari Eluru Canal3.Kakinada Canal4.Commamur Canal5.Buckingham Canal
-
7/24/2019 Projects in AP State
19/37
19
Following is a breakup of components and costs of variousstretches:
Krishna Eluru Canal:
TYPE OFSTRUCTURE Nos
Tentative Cost involved formodification for class IIIwater way : in " INR Crores
"BRIDGES 58 774.00
UNDERTUNNELS 11 42.00LOCKS 2 40.00
REGULATORS 1 20.00AQUEDUCTS 2 40.00
SLUICE GATES/CHANNELS 86 43.00
Total 959.00
Godavari Eluru Canal:
TYPE OFSTRUCTURE Nos
Tentative Cost involved formodification for class III
water way : in " INR Crores"
BRIDGES 34 462.00
UNDERTUNNELS 9 27.00INLETS 15 15.00
OUTLETS 15 15.00SLUICES/
CHANEELS 106 53.00
Total 572.00
Kakinada Canal:
TYPE OFSTRUCTURE Nos
Tentative Cost involved formodification for class IIIwater way : in " INR Crores
"LOCKS 7 70.00
REGULATORS 1 5.00SURLUS WEIRS 2 10.00
OFF TAKE 37 18.50
-
7/24/2019 Projects in AP State
20/37
20
SLUICESBRIDGES 21 216.00
Total 319.50
Commamur Canal:
TYPE OFSTRUCTURE Nos
Tentative Cost involved formodification for class III
water way : in " INR Crores"
LOCKS 7 114.00UNDER
TUNNELS 10 32.00OTHER
STRUCTURES 14 217.00BRIDGES 38 428.00
OFF TAKESLUICES 203 103.00
Total 894.00
Buckingham Canal:
TYPE OFSTRUCTURE Nos
Tentative Cost involved formodification for class III
water way : in " INR Crores"
LOCKS 10 150.00BRIDGES 14 150.00
Total 300.00
2 Monetary supportrequired fromStateGovernment (Rs.Crore)
Will be decided by IWAI based on the TEFR
As of now the State is supposed to bear 10% of the investigationand project preparatory cost
The remaining costs will be borne by the Central Government.3 Construction
Period (Years)5 years (Planned to be completed by 2020)
4 Project EconomicLife (Years)
100 years
-
7/24/2019 Projects in AP State
21/37
21
5 ConcessionPeriod in case ofPPP projects(Years)
Upto 99 years
6 Multiplier effects
on other sectorsof the economy
IWT is an economic, fuel efficient, environmental friendly and
low cost transport mode.
The project will be an important component of the state logistics.As NW-4 is along the coastline it will serve the ports of the stateand reduce cargo congestion from roads and rails. The modal shiftof cargo evacuation will also reduce the average cost of evacuationas IWT is a low cost transport mode.
Construction and operation of the project will also boost theindustries and manufacturing sector.
This project will also incentivize potential investors to invest inother projects like greenfield ports, beach corridor etc.
-
7/24/2019 Projects in AP State
22/37
22
Project 9: Convention Centre at Vijayawada
Project Name Convention Centre at Vijayawada inAndhra Pradesh on PPP basis
Sector Tourism MICE sector
Developer
Project LocationAndhraPradesh/Vijayawada/Ibrahimpatnam
Physical Parameters Project Capacity
Scheduled completion date
Convention and Exhibition Centre 18 months4-Star Hotel 24 monthCommercial complex (50%) 30monthsCommercial complex (100%) 60months
Present Status
Construction initiation November2016
Project tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPPDelay vis--vis original schedule
Reasons for delayState Govt. relatedCentral Govt. relatedFinancial relatedOthers
Financial Parameters Project Cost Rs. 260 croreExpenditure Incurred & Means of FinanceFunds required for project completion
Amount & Reasons of overrun (if any)Amount of funding available
DebtEquity
Amount of Investment RequiredInvestment Rationale
-
7/24/2019 Projects in AP State
23/37
23
Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]
Additional Information
Brief description of the project The project involves selection of a developer toundertake development, operation and maintenanceof the Convention Centre and allied facilities inVijayawada through Public Private Partnership(PPP) on Design, Build, Finance, Operate andTransfer basis. The key components of the projectinclude:
Convention Centre 3,000 pax Exhibition Centre 50,000 sq. ft 4-Star Hotel 150 rooms Commercial complex Gross leasable area
of 75,000 sq. ft
-
7/24/2019 Projects in AP State
24/37
-
7/24/2019 Projects in AP State
25/37
25
Email ID [email protected] Information
Brief description of the project The Government of Andhra Pradesh has planned todevelop a road with new alignment along the High
Tide Line from Ichchapuram to Tada to promoteeconomic activities along the long coast line whichthe state is endowed with. In phase I, two prioritysections i.e. Bhogapuram to Visakhapatnam (~19km) and Visakhapatnam to Addaripeta (~ 85 km)have been identified for development.
The Beach Road is expected to energize the coastalareas by providing connectivity. It is envisaged tosupport and promote many economic activities inthe Influence Zone such as industrial activities,
tourism, port related activities, marine and fisheries.
-
7/24/2019 Projects in AP State
26/37
26
Project 11: Power Distribution for Amaravati
Project Name Power Distribution for AmaravatiSector Urban Infrastructure
Developer Andhra Pradesh Capital Region Development Authority
Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 1500 MW Scheduled 2019
Present StatusIntegrated Smart infrastructure master planner and DPR
consultant to be onboard by Feb 2016. Draft DPR for Power to be ready by August 2016
Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-take
All approvals facilitation to be provided by APCRDA /GoAP.
A population of 4 lacs led by the Govt. of AP employees, support staff and current local populations expected to be in place
by year 2019/2020.
Delay vis--visoriginal
Project on track
Reasons for delay NA State Govt. related NA
Central Govt. related NA Financial related NA Others NA FinancialProject Cost INR 7,500 Cr. ExpenditureIncurred & Means
DPR under progress Govt. equity/Private equity (PPP)/ Debt
Funds required forproject
INR 7,500 Cr.
Amount & Reasonsof overrun
None
Amount of funding Viability Gap Funding may be available Debt D/E - ~70 : 30 Equity Amount ofInvestment Equity - INR 2,250 Cr.
-
7/24/2019 Projects in AP State
27/37
27
InvestmentName of Contact Dhananjaya Joshi Mobile No +91-7095599133 Email ID josh [email protected]
mailto:[email protected]:[email protected] -
7/24/2019 Projects in AP State
28/37
-
7/24/2019 Projects in AP State
29/37
29
Amount ofInvestment Equity - INR 480 Cr.
InvestmentName of Contact Dhananjaya Joshi
Mobile No +91-7095599133 Email ID josh [email protected]
mailto:[email protected]:[email protected] -
7/24/2019 Projects in AP State
30/37
30
Project 13: Waste water collection & treatment system for Amarvati
Project Name Waste water collection & treatment system for Amarvati
Capital city
Sector Urban Infrastructure
Developer Andhra Pradesh Capital Region Development Authority
Project Location Amaravati, Andhra Pradesh Physical Parameters
Project Capacity Sewer network - 660 km Sewage treatment - 210 MLD
Scheduled 2019
Present StatusIntegrated Smart infrastructure master planner and DPR consultant to be onboard by Feb 2016. Draft DPR for Power to
be ready by September 2016 Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-take
All approvals facilitation to be provided by APCRDA /GoAP.
A population of 4 lacs led by the Govt. of AP employees, supportstaff and current local populations expected to be in place by year2019/2020.
Delay vis--visoriginal
Project on track
Reasons for delay NA State Govt. related NA Central Govt. related NA Financial related NA Others NA FinancialProject Cost INR 1,900 Cr. ExpenditureIncurred & Means
DPR under progress Govt. equity/Private equity (PPP)/ Debt
Funds required forproject INR 1,900 Cr.
Amount & Reasonsof overrun
None
Amount of funding Viability Gap Funding may be available Debt
-
7/24/2019 Projects in AP State
31/37
31
Equity D/E - ~70 : 30
Amount ofInvestment Equity - INR 570 Cr.
InvestmentName of Contact Dhananjaya Joshi Mobile No +91-7095599133 Email ID josh [email protected]
mailto:[email protected]:[email protected] -
7/24/2019 Projects in AP State
32/37
32
Project 14: Solid waste management system for Amarvati Capital city
Project Name Solid waste management system for Amarvati Capital city
Sector Urban Infrastructure
Developer Andhra Pradesh Capital Region Development Authority
Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 250 MT of Solid Waste per day Scheduled 2019
Present StatusIntegrated Smart infrastructure master planner and DPR
consultant to be onboard by Feb 2016.
Draft DPR for Power to be ready by September 2016
Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-take
All approvals facilitation to be provided by APCRDA /GoAP.
A population of 4 lacs led by the Govt. of AP employees, support staff and current local populations expected to be inplace by year 2019/2020.
Delay vis--visoriginal
Project on track
Reasons for delay NA State Govt. related NA Central Govt. related NA Financial related NA Others NA FinancialProject Cost INR 250 Cr. ExpenditureIncurred & Means
DPR under progress Govt. equity/Private equity (PPP)/ Debt
Funds required forproject INR 250Cr.
Amount & Reasonsof overrun
None
Amount of funding Viability Gap Funding may be available Debt D/E - ~70 : 30 Equity
-
7/24/2019 Projects in AP State
33/37
33
Amount ofInvestment Equity - INR 75 Cr.
InvestmentName of Contact Dhananjaya Joshi
Mobile No +917095599133 Email ID josh [email protected]
mailto:[email protected]:[email protected] -
7/24/2019 Projects in AP State
34/37
34
Project 15: Development of Government HoD buildings
Project Name Development of govt. HoD buildingsSector Real Estate
Developer Andhra Pradesh Capital Region Development Authority
Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 4. 8 million sq. ft. Scheduled 2019
Present Status
International Architectural Design competition is being held for themaster planning of the overall govt. complex and the design of the
State Assembly, Secretariat and High Court. Other architects andlandscape designers empanelled for design of other buildingsincluding the HoD buildings.
Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-takearrangements,
All designs to be completed by January 2017 post which theconstruction to be taken up under Works contract mode forAssembly, Secretariat, High Court and few other buildings .
All approvals facilitation to be provided by APCRDA / GoAP.Land to be provided at concessional rates.
Delay vis--visoriginal
Project on track
Reasons for delay NA State Govt. related NA Central Govt. related NA Financial related NA Others NA
FinancialProject Cost ~INR 1,700 Cr. ExpenditureIncurred & Means
Govt. equity/Private equity (PPP)/ Debt
Funds required forproject
~INR 1,700 Cr.
-
7/24/2019 Projects in AP State
35/37
35
Amount & Reasonsof overrun
None
Amount of funding None Debt D/E - ~70 : 30
Equity Amount ofInvestment Equity - INR 510 Cr.
InvestmentName of Contact Dhananjaya Joshi Mobile No +91-7095599133 Email ID josh [email protected]
mailto:[email protected]:[email protected] -
7/24/2019 Projects in AP State
36/37
36
Project 16: Development of affordable housing for economically weaker sections
Project Name Development of affordable housing for economicallyweaker sections
Sector Real Estate
Developer Andhra Pradesh Capital Region Development Authority
Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 10,000 households Scheduled 2020
Present Status Policy for the development of Affordable housing under Progress
Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-takearrangements,
All approvals facilitation to be provided by APCRDA /GoAP. Land may be provided at concessional rates.
Construction labour employed in the construction activity andstaff providing various support services for the citypopulation to
be the focus audience.
Delay vis--visoriginal
Project on track
Reasons for delay NA
State Govt. related NA Central Govt. related NA Financial related NA Others NA FinancialProject Cost ~INR 600 Cr. ExpenditureIncurred & Means
Govt. equity/Private equity (PPP)/ Debt
Funds required for
project ~INR 600 Cr.
Amount & Reasonsof overrun
None
Amount of funding None Debt D/E - ~70 : 30 Equity
-
7/24/2019 Projects in AP State
37/37
Amount ofInvestment Equity - INR 180 Cr.
InvestmentName of Contact Dhananjaya Joshi
Mobile No +91-7095599133 Email ID josh [email protected]
mailto:[email protected]:[email protected]