Department Project Name Project Summary Contact DetailsProject
ClassificationCurrent S
NationalRoads
Authority
N4 Kilcock- Kinnegad
The project involves the construction of 39
km of motorway from Kinnegad to Kilcockand is an extension of the Kilcock-Maynooth-
Leixlip motorway on the N4/N6 Sligo/Galway
to Dublin route.
NRA PPP Unit, 4th
Floor, St. Martin'sHouse, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
ConcessionOngoContr
Manage
National
Roads
Authority
N25 Waterford Bypass
The project consists of a By-Pass of
Waterford City to include a new river
crossing and a cable stay bridge. The project
also includes a new connection, known as
the Western Link, which connects the By-
Pass to industrial areas to the South West of
the City
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
Concession
Ongo
Contr
Manage
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 2/46
National
Roads
Authority
N7 Limerick Southern
Ring Phase II / Limerick
Tunnel
The project will comprise of approx. 10 km of
standard dual carraigeway and 4km of single
carriageway and will incorporate a 900mtunnel under the River Shannon
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:660 2511, Fax: 668
0009
Concession
Ongo
Contr
Manage
National
Roads
Authority
M1 Dundalk Western
Bypass
The project involves the construction,
operation and maintenance of an 11 km
stretch of road forming part of the N1/M1
together with approx. 8 km of associated side
roads and tie- ins. The project also includesthe operation and maintenance of existing
motorway
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 6680009
Concession
Ongo
Contr
Manage
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 3/46
National
Roads
Authority
M3 Clonee-Kells
The project involves the construction of a 50
km stretch of motorway/dual carriageway,
and 11 km of single carriageway. The scheme
also involves construction of a further 24 kmof link road
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 6680009
Concession
Ongo
Contr
Manage
National
Roads
Authority
N6 Galway to East
Ballinasloe
The scheme extends 57.6 km comprising of
56 km of dual carriageway and 1.6 km of
single carraigeway
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
Concession
Ongo
Contr
Manage
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 4/46
National
Roads
Authority
M7 Portlaoise-
Castletown/M8 Portlaoise-
Cullahill
Both sections of this scheme to be procured
as a single scheme have an approx. length of
42 km
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
Concession
Ongo
Contr
Manage
NationalRoads
Authority
M50 PPP Upgrade
The M50 Upgrade PPP Contract is intended
to comprise the design, construction,
operation and finance of the upgrading of
approx. 24 km of the existing two lane
carriageway to three lane standard and the
upgrading of interchanges
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
DBFOMOngoContr
Manage
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 5/46
National
RoadsAuthority
N8 Rathcormac-Fermoy
Bypass
This project involves the construction of an
18 km stretch of road incorporating aBlackwater crossing viaduct
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
Concession
Ongo
ContrManage
NationalRoads
Authority
Motorway Service Areas -
Tranche 1
Tranche 1 tender competition comprises the
design, construction, operation and financing
of three service areas on the national roads
network. Two service areas are located on
the M1 motorway and one is on the M4
motorway
NRA PPP Unit, 4th
Floor, St. Martin'sHouse, Waterloo
Road, Dublin 4, Tel:
660 2511, Fax: 668
0009
ConcessionOngoContr
Manage
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 6/46
National
Roads
Authority
N11 Arklow / Rathnew
The Project will comprise of approximately 16
km of new build motorway/dual carriageway
on the N11 along with the N7 Newlands Cross
junction upgrade to a grade separated
junction.
NRA PPP Unit, 4th
Floor, St. Martin's
House, Waterloo
Road, Dublin 4, Tel:660 2511, Fax: 668
0009
DBFOMProcure
Proce
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 7/46
Estimated
Construction Start
Date
Estimated
Date of
Operation
Operational
FromContract End Date
Payments to end
2011 (€)
Projected future
payments in
NOMINAL terms
(€) Projected total
expenditure (€millio
3/24/2003
43months
postcommenceme
nt: i.e.
October 2006
Dec-05 3/23/2033 172.0m 7.3m
179.3
4/21/2006
52months
post
commenceme
nt: i.e. August
2010
Oct-09 4/20/2036 118.6m 82.0m
200.6
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 8/46
8/18/2006
49months
post
commenceme
nt: i.e.September
2010
Jul-10 8/17/2041 197.8m
59.3m (not
inclusive of
variable
payments
related to
outturn traffic
volumes)
257.1
2/5/2004
30months &
27days post
commenceme
nt: i.e. August2006
Sep-05 2/4/2034 2.8m 3.8m
6.6
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 9/46
07/03/2007
Effective Date:
27/04/2007
38months
after the
Effective
Date; i.e.June 2010
Jun-10 4/26/2052 334.6m
379.8m (not
inclusive of
variable
payments
related tooutturn traffic
volumes)
714.4
4/4/2007
33months
post
commenceme
nt: i.e.
January 2010
Dec-09 4/3/2037 183.1m 193.4m
376.5
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 10/46
6/14/2007
48months
post
commenceme
nt: i.e. June2011
May-10 6/13/2037 52.6m 32.9m
85.5
9/27/2007
Phase 1:
27months
post
commenceme
nt
Phase2:
28months
postcommenceme
nt
Phase3: 37
months post
commenceme
nt'
i.e. All
completed by
October 2010
Sep-10 9/26/2042 66.0m 891.4m
957.4
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 11/46
6/11/2004
36months
post
commencement: i.e. June
2007
Oct-06 6/10/2034 109.4m
40.6m 150.0
10/8/2009
13months
postcommenceme
nt: i.e.
November
2010
Sep/ Oct-10 10/7/2034 47.1m
None 47.1
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 12/46
Late 2012 Late 2014 Late 2014 2037 NIL
TBC TBC
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 13/46
PPP Company Links
Eurolink Motorway Operations (M3)
Limited
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/N4Kilcock-
Kinnegad/
Celtic Roads Group (Waterford) Ltd
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/N25WaterfordBy-
Pass/
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 14/46
DirectRoute (Limerick) Ltd
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/N7LimerickSouthe
rnRingPhaseII/
Celtic Roads Group (Dundalk) Ltd
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/N1M1DundalkWes
ternBy-Pass/
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 15/46
Eurolink Motorway Operations (M3)
Limited http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/M3Clonee-Kells/
N6 (Concession) Limited
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/N6GalwaytoEastB
allinasloe/
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 16/46
Celtic Roads Group (Portlaoise) Ltd
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/M7Portlaoise-
CastletownM8Portlaoise-Cullahill/
M50 (Concession) Limited http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/M50PPPContract/
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 17/46
DirectRoute (Fermoy) Ltd
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/M8RathcormacFer
moyBypass/
Superstop Ltd
http://www.nra.ie/PublicPrivatePartnership/ProjectTracker/ServiceAreas-
Tranche1/
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 18/46
TBC
http://www.nra.ie/RoadSchemeActivity/WicklowCountyCouncil/N11Arklowto
Rathnew/SchemeName,16415,en.html
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 19/46
Notes
Contract awarded to EuroLink on 5th
March 2003. The EuroLink consortium
comprises SIAC Construction Limitedand Cintra - Concesiones de
Infraestrucutras de Transporte S. A., a
major Spanish company with road
concession interests in Spain,
Portugal, Canada etc
The contract was awarded to Celtic
Roads Group (Waterford) Ltd. on 21st
April 2006. The Celtic Roads Group
(Waterford) Ltd. consortium comprises
Dragados (a Spanish company), NTR,
and Royal BAM (Ascon). The Scheme
opened to traffic in October 2009.
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 20/46
The contract was awarded to the
DirectRoute Consortium (Strabag AG,John Sisk & Son (Holdings) Ltd.,
Lagan Holdings Ltd.and Roadbridge
Ltd.) on the 18th August 2006. The
road opened to the Public in the
second half of 2010
Celtic Roads Group (Dundalk) Ltd, was
awarded the contract in February 2004.
The consortium comprises Dragados
Concesiones de Infraestructuras SA (amajor Spanish firm), Edmund Nuttall
Ltd (UK), HBG Ascon Ltd (Irl), and NTR
plc (Irl).
Celtic Roads Group
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 21/46
The M3 Clonee-Kells PPP contract wasawarded to the EuroLink consortium.
EuroLink comprises CINTRA
Concesiones de Infraestructuras de
Transporte, S.A. and SIAC. The
contract commenced on the 27th April
2007.
The N6 Galway to Ballinasloe PPP
contract was awarded to the ICON
consortium (trading as N6
(Concession) Limited) on 4th April
2007. ICON comprises FCC
Construction S.A. and Itinere
Infraestructuras, both major companies from Spain, and PJ Hegarty
& Son
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 22/46
The contract was awarded on 14th
June 2007 to the Celtic Roads Group
Consortium, (NTR plc, Royal BAM
Group, Iridium Concessiones &
Dragados S.A.).
The contract was awarded to the ICON
Consortium (FCC Construction S.A.,
Itinere Infraestucturas & PJ Hegarty)
trading as M50 (Concession) Limited
on 27th September 2007
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 23/46
Contract awarded to Direct Route
(Fermoy) Ltd. in June 2004. The
consortium comprises Kellogg Brown
& Root Ltd, Strabag AG, John Sisk &
Son (Holdings) Ltd, Lagan Holdings
Ltd, Roadbridge Ltd. and the First Irish
Infrastructure Fund
The contract was awarded to the
Superstop Consortium (consisting of:
Pierse Group, Petrogas Group and
Tedcastle Oil Products) and opened in
late 2010
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 24/46
The project is currently at PT stage
and it is hoped that contract close will
be reached in Q4 2012
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 25/46
Department Project Name Project SummaryProject
Classification
Contract
Signed
Courts ServiceCriminal Courts
Complex
Criminal justice
building with all
user facilities
DBFOM Oct-07
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 26/46
Service
CommencementsContract end
Expenditure to
end 2011
(€millions)
Notes
Projected
total
expenditure
(€millions)
PPP
Company
2009 2035 58.4
Early completion and
Services
Commencement
achieved on
November 17th, 2009.
The facility is now
fully operational.
625.4
IPP CCC
Partnershi
p Ltd.
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 27/46
Department Project Name Project Summary Contact DetailsProject
Classification
Current
Status
Department of
Education and
Science
Pilot PPP
Schools Bundle
Design build
finance and
operate five new
post-primary
schools
Maria
Grogan/Eamonn
Cusack/Cyril
O'Neill. Dept.
Education and
Science,
Portlaoise Road,
Tullamore, Co.
Offaly. Tel: 057
9324300. Fax
057 9325347
DBFOM
Ongoing
Contract
Managem
ent
Department of
Education and
Science
National
Maritime College
of Ireland (NMCI)
Design build
finance and
operate college for
nautical training at
Ringaskiddy, Co.
Cork
Maria
Grogan/Eamonn
Cusack/Cyril
O'Neill. Dept.
Education and
Science,
Portlaoise Road,
Tullamore, Co.
Offaly. Tel: 0579324300. Fax
057 9325347
DBFOM
Ongoing
Contract
Managem
ent
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 28/46
Department of
Education and
Science
Cork School of
Music (CSM)
Design buildfinance and
operate School of
Music in Cork City
Maria
Grogan/Eamonn
Cusack/Cyril
O'Neill. Dept.Education and
Science,
Portlaoise Road,
Tullamore, Co.
Offaly. Tel: 057
9324300. Fax
057 9325347
DBFOM
OngoingContract
Managem
ent
Department of
Education and
Science
Bundle 1 Post-
Primary Schools
4 new post-
primary schools
Maria
Grogan/Eamonn
Cusack/Cyril
O'Neill. Dept.
Education and
Science,
Portlaoise Road,
Tullamore, Co.
Offaly. Tel: 057
9324300. Fax
057 9325347
DBFOMConstruct
ion
Department of
Education and
Science
Bundle 2
Primary/Post-
Primary Schools
5 new post-primary
schools and 1 new
primary school
Maria
Grogan/Eamonn
Cusack/CyrilO'Neill. Dept.
Education and
Science,
Portlaoise Road,
Tullamore, Co.
Offaly. Tel: 057
9324300. Fax
057 9325347
DBFOM
Tender Evaluatio
n incl
Value for
Money
Comparis
ion
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 29/46
Department of
Education and
Science
Bundle 3
Primary/Post-
Primary Schools
7 new post-primary
schools and 1 new
primary school
Maria
Grogan/Eamonn
Cusack/Cyril
O'Neill. Dept.Education and
Science,
Portlaoise Road,
Tullamore, Co.
Offaly. Tel: 057
9324300. Fax
057 9325347
DBFOM
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 30/46
Contract
Signed
Service
CommencementsContract end
Payments to
end 2011
(€million)
Projected total
expenditure
(€million)
PPP
Company
Nov-01 2002 2027 107.3 285
Schools
Public/Privat
e Partership
(Ireland) Ltd
Feb-03 2004 2029 71.5 199.2
Focus
Education
(NMC) Ltd
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 31/46
Sep-05 2007 2032 44.3 230.2CMS PPP
Services Ltd
Mar-09 2010 2035 18.3 267
Macquarie
Partnership
for Ireland
Jun-10 2011 2036 13.9 352.3
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 33/46
Department Project Name Project Summary
Project
Classifi
cation
Contract
signed
Service
commencements
Arts,
Heritage andthe Gaeltacht
National
Conference Centre(now know as The
Convention Centre
Dublin)
Project to provide
a NationalConference Centre
in Dublin, using
design build
finance maintain
and operate
DBFOM Apr-07 2010
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 34/46
Contract end
Payments to
end 2011
(€millions)
Projected
Future
Payments
Projected
total
expenditure
(€millions)
PPP Company
2035 95.2 €658.07m 753.3 Spencer Dock
ConventionCentre Dublin
Ltd
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 35/46
Department Project Name Project Summary Contact Details
Project
Classifi
cation
Current
Status
Contract
Start Date
DECLG
Dublin Bay
Drainage
scheme
The treatment plant
is part of the Dublin
Main Drainagescheme. It has the
capacity to cater for
a PE of 1.64m
Seamus Lyons(01) 222 2222
DBOM
Ongoing
Contract
Management
2001
DECLGWexford Main
Drainage
The treatment plant
is part of the
Wexford Main
Drainage scheme. It
has the capacity to
cater for a PE of
30,000
Eddie Taffe
(053) 9176500DBOM
Ongoing
Contract
Management
1999
DECLGCork Main
Drainage
The treatment plant
is part of the CorkMain Drainage
scheme. It has the
capacity to cater for
a PE of 1.64m
Eamon Walsh
021-4924608DBOM
OngoingContract
Management
2001
DECLGSouth Tipperary
Bundled DBO
This project
comprises of 10
individual schemes
under a single DBO
contract. Five
schemes will be
upgraded and
additional 5
schemes will be
constructed
Dan Walsh (052)
6134455DBOM
Ongoing
Contract
Management
2003
DECLG
Dungarvan
Sewerage
Treatment
Scheme
The treatment plant ,
which is part of the
main drainage
scheme will have the
capacity to cater for
sewage from a PE of
35,000
Michael Quinn
058 22000DBOM
Ongoing
Contract
Management
2004
DECLGWaterford Main
Drainage
The treatment plant
is the DBO element
of the scheme.
When completed it
will have the
capacity to cater for
a PE of 100,000
Colette Byrne
051 309900DBOM
Ongoing
Contract
Management
2006
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 36/46
DECLG
Donegal A
Sewerage
Scheme
This project
comprises three
individual schemes
in Donegal Town ,
Ballyshannon and
Rosnowlagh
Joe Peoples
074-9172222DBOM
Ongoing
Contract
Management
2006
DECLG
Balbriggan/
Skerries
Sewerage
Scheme
The PPP element of
this scheme is the
treatment plant,
which will cater for
sewage from
Balbriggan and
Skerries. It will have
an initial capacity to
cater for a PE of
30,000, with the
potential to expand
capacity to 100,000
Eithne Felton
(01) 8905000DBOM
Ongoing
Contract
Management
2004
DECLG
Portlaoise
Sewerage
Scheme
This treatment plant
is part of the
Portlaoise Main
Drainage scheme.
The treatment plant
will, when completed
have the capacity to
cater for a PE of
39,000
Philip McVeigh
(057) 8664000DBOM
Ongoing
Contract
Management
2006
DECLG
Clareville Water
Treatment
Scheme
The scheme will
cater for the potable
water for Limerick
and its environs. Is
expected that it will
have the capacity to
treat approx.100,000
M3 of water per day
Caroline Curley
061-407100DBOM
Ongoing
Contract
Management
2006
DECLG
Meath Grouped
Villages
sewerage
Scheme
The Scheme
consists of Waste
Water Treatment
Plants for Dunleek,
Athboy, Kilmainham
Wood, Summerhill,
Moynalty,
Rathmoylan and
Rathcairn They will
have the capacity to
cater for a PE of
5,000.
TadhgMcDonnell
046-9097000
DBOM At
Construction2007
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 37/46
DECLGSligo Main
Drainage
The treatment plant
is part of the Sligo
Main Drainage
scheme. When
completed it will
have the capacity to
cater for a PE of 47,000
Tom Kilfeather
Tel. 071-
9111111
DBOM
Ongoing
Contract
Management
2006
DECLG
Mullingar
Sewerage
scheme
The treatment plant
is part of the
Mullingar main
drainage scheme.
When complete it
will have the
capacity to cater for
a PE of 30,000 rising
to 55,000 within the
next three yrs.
David Hogan
(044) 9332000DBOM
Ongoing
Contract
Management
2008
DECLG
Shanganagh
Sewerage
scheme
The treatment plant
is the DBO element
of the scheme. The
plant will have the
capacity to cater for
a PE of 103,000
Frank Austin
(01) 8905000DBOM
At
Construction2008
DECLG
Wicklow
Sewerage
Scheme and
Sludge
Treatment
Centre
The treatment plant,
which is the DBO
element of the
scheme, will be sitedoutside Wicklow
Town. It will cater for
Wicklow Town and
Ashbourne and have
the capacity to cater
for a population
equivalent of 34,000
Bryan Doyle
(0404) 20100DBOM
Ongoing
Contract
Management
2007
DECLG
Letterkenny
Sewerage
Scheme
Waste water
treatment plant to
cater for
Letterkenny and itsenvirons
Joe Peoples
074-9172222DBOM
At
Construction2011
DECLG
Portrane/Donab
ate Sewerage
Scheme
Waste Water
treatment plant to
cater for the
Portrane Donabate
area of Nth Dublin
Eithne Felton
(01) 8905000DBOM
At
Construction2010
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 38/46
DECLG
Barrow Water
Abstraction
Scheme
Extraction and
treatment of water
from the Barrow
River
Joe Boland
(045) 980200DBOM
At
Construction2011
DECLG
Castlebar
Sewerage
Scheme
This project involves
the construction,
operation andmaintenance of a
treatment plant with a
capacity to serve a
population of 35,000.
Paul Benson
(094) 9024444DBOM
Ongoing
Contract
Management
2008
DECLG
Tullamore
Sewerage
Scheme
Provision of an
updated and expanded
main drainage system
in North County
Dublin, including a
single waste water
treatment plant at
Portrane. It will cater
for a population
equivalent of 65,000
Tom Shanahan
(057) 934 6800DBOM
At
Construction2010
DECLG
Donegal B
Sewerage
Scheme
This scheme
comprises of two
individual schemes
in Killybegs and
Bundoran.
Joe Peoples
074-9172222DBOM
Contract
Documents
Stage
~
DECLGWaterford
Grouped Towns
and Villages
The DBO element of
the scheme will
comprise of
treatment plants in
Ardmore, Tallow,Stradbally,
Cappoquinn,
Dunmore East,
Kilmacthomas,
Ballyduff and
Kilmeaden
Michael Quinn
058 22000DBOM
Procurement
Process~
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 39/46
Contract
Finish Date
Estimated
Construction
Start Date
Estimated
Date of
Operation
Operational
FromNotes
Indicative
Overall
Value
€million
2024 2001 ~ Late 2004
The plant is now in the
Operation and
Maintenance phase.
€50-€250
2026 1999 ~ Early 2004
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2027 2001 ~ Mid 2004The plant is now in theOperation and
Maintenance phase.
€50-€250
2029 2003 ~ Mid 2006
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2029 2004 ~ Mid 2007
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2031 ~ 2009
The plant is now in the
Operation and
Maintenance phase.
€50-€250
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 40/46
2030 2006 Late 2008 Late 2008
The plant is now in the
Operation and
Maintenance phase.
€50-€250
2028 2004 ~ Late 2007
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2031 2006 ~ Mid 2009
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2030 2006 ~ 2010
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2032 2007 2012 ~ At Construction €20-€50
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 41/46
2030 2006 ~ Early 2009
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2032 2008 ~ 2010
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2031 2008 2012 ~ At Construction €50-€250
2031 2007 ~ 2010
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2033 2011 2012 ~ At Construction €20-€50
2032 2010 2012 ~ At Construction €20-€50
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 42/46
2033 2011 2013 ~ At Construction €20-€50
2032 ~ ~ 2010
The plant is now in the
Operation and
Maintenance phase.
€20-€50
2032 2010 ~ 2012 At Construction €20-€50
~ 2014 2016 ~Contract documents
under examination€20-€50
~ Mid 2013 Mid 2015 ~ Shortlisting underway. €20-€50
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 43/46
PPP
Company
ABA
Brent
Consortium
Degremont
Consortium
Earthtech Irl.
ABV
Anglian Water
International
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 44/46
Veolia Water
UK/Bowan
Water
Technology/V
eolia Water
Ireland
Earthtech Irl.
Earthtech/Bow
en
Construction
Veolia
Water/Ascon
Consortium
EPS
7/28/2019 Projects Sept 12
http://slidepdf.com/reader/full/projects-sept-12 45/46
Anglian Water
International
Veolia Water
Ireland
Sisk/Dragados
/Drace
Consortium
Veolia Water
Ireland
Response/
Severn Trent
Aecom Design
Build Ireland /
Siac
Construction
Ltd.