Transcript

0

METRES (1:500)

10 20 30 40 50

7 ESS

NO

RTH

RO

AD

9

LODGE CLOSE

Barrow School(primary)

Food Processing Plant

Path (um)

6

Loom Loft Furniture & Interiors

CO-OP

McDonald's

186m

² /20

00sq

ft

836m² /9000sqft

A59

Lorry Layby

PROW

PROW

PRO

W

PRO

W

PROW

PROW

186m

² /20

00sq

ft

186m

² /20

00sq

ft

186m

² /20

00sq

ft

715m² /7700sqft

696m

² /75

00sq

ft

186m² /2000sqft

12

205m² /2200sqft

205m² /2200sqft

205m

² /22

00sq

ft

205m

² /22

00sq

ft

715m² /7700sqft

743m

² /80

00sq

ft

743m

² /80

00sq

ft

743m

² /80

00sq

ft

PEDESTRIAN LINK

A59

Indicative Site Layout

CBStage 3 - Spatial Coordination

01-123-0005

18.03.2021 1:500@A1

Barrow Brook Business Park Barrow Brook Business Park,Clitheroe

CD.AC.BBBP.ISL.O1

Client: Project Name:

Drawn By:

A T

M

E W

The

Gra

nary

, Sut

ton

Lodg

e F

arm

,55

Che

ster

Roa

d, S

utto

n W

eave

r,R

unco

rn, W

A7

3EA

0160

6 65

4983

0788

4401

777

C.B

rear

ley@

Arc

hi-S

cape

.net

ww

w.A

rchi

-Sca

pe.n

et

Project Address:

Project Status:

Project Number:

Drawing Title:

Date:

Drawing Number:

Scale: Rev:

Barrow Brook Business ParkConsortium

LEGEND

Denotes existing trees to beretained where possible orreplaced.

Denotes proposed permeablesurfacing.

Denotes proposed tree plantingwith Bio-retention tree pit.

Denotes proposed attenuationbasin.

NOTESAccess detail in accordance withVectio Consulting design (dwg numVC0134 - 005).

Revisions:

Rev Description By Date

S3A Updated in accordance with additional reports and information received. CB 16.7.21

AutoCAD SHX Text
N

Top Related