Site Notices Background Information Document Adverts Notification to Stakeholders Attendance Registers Minutes of Meetings Comments and Responses Report
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C1
C1 SITE NOTICES
Site Notices were erected at the Mamathwane Compilation Yard site on the 18 October 2012.
Figure 1.1 Site Notice (English)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C2
Figure 1.2 Site Notice (Afrikaans)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C3
Figure 1.3 Site Notice (Setswana)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C4
Figure 1.4 Site Notice (Xhosa)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C5
Figure 1.5 Proof of Site Notices
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C6
C2 BACKGROUND INFORMATION DOCUMENTS (BIDS)
Figure 2.1 Background Information Document (BID) (English)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C7
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C8
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C9
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C10
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C11
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C12
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C13
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C14
Figure 2.2 Background Information Document (BID) (Afrikaans)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C15
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C16
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C17
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C18
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C19
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C20
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C21
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C22
Figure 2.3 Background Information Document (BID) (Setswana)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C23
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C24
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C25
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C26
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C27
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C28
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C29
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C30
Figure 2.4 Background Information Document (BID) (Xhosa)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C31
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C32
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C33
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C34
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C35
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C36
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C37
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C38
Figure 2.5 Registration and Comment Sheet
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C39
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C40
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C41
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C42
C3 ADVERTS
Figure 3.1 Advert (English)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C43
Figure 3.2 Advert (Afrikaans)
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C44
Figure 3.3 Proof of Advert in Die Burger Oos 15 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C45
Figure 3.4 Proof of Advert Die Burger Wes 15 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C46
Figure 3.5 Proof of Advert Kathu Gazette 6 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C47
Figure 3.6 Proof of Advert Somerset Budget 4 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C48
Figure 3.7 Proof of Advert Volksblad 4 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C49
C4 NOTIFICATION TO STAKEHOLDERS
Figure 4.1 Notification Letter to Stakeholders (English) 2 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C50
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C51
Figure 4.2 Notification Letter to Stakeholders (Afrikaans) 2 October 2012
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C52
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C53
C4.1 PROOF OF EMAIL FOR DRAFT SCOPING REPORT
From: Tougheeda Aspeling on behalf of ERM Southern Africa Project TransnetTo: Tougheeda Aspeling; Nestus BredenhannBcc: "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";
"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]";"[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"
Subject: 0172056 / Proposed expansion of Transnet’s existing manganese ore railway line and associatedinfrastructure
Date: 09 November 2012 11:43:00 AMAttachments: 0172056 Transnet_comment and reply sheet.pdf
0172056 Transnet_DSR Letter Afr_FINAL.pdf0172056 Transnet_ DSR Letter Eng_FINAL.pdf
Dear Sir/Madam
PROPONENT: Transnet Kindly find attached announcement letter for the Draft Scoping, Basic Assessment andAmendment Reports for the proposed expansion of Transnet’s existing manganese ore railwayline and associated infrastructure.This letter includes information about availability of the before mention ed reports andupcoming public meetings. Please do not hesitate to contact us should you require moreinformation. Best regards, Nestus Bredenhann Geagte Meneer/Mevrou Voorsteller: Transnet Let asseblief aangeheg die aankondiging brief vir die Konsep Omvangbepalings, Konsep BasieseInvloedbepalings -en Wysigingsverslae vir die voorgestelde uitbreiding van Transnet sebestaande spoorlyn vir die uitvoer van mangaanerts en verwante infrastruktuur. Hierdie briefbevat inligting oor beskikbaarheid van die voorafgenoemde verslae en opkomende openbarevergaderings. Moet asb. nie huiwer om ons te skakel sou u enige verdere inligting benodig. Beste groete, Nestus Bredenhann ThanksNestus
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C54
C4.2 PROOF OF POSTAGE OF DRAFT SCOPING REPORT
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C55
C4.3 PROOF OF EMAIL FOR FINAL SCOPING REPORT
From: Tougheeda AspelingTo: Tougheeda AspelingBcc: "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";
"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]";"[email protected]"; "[email protected]";"[email protected]"; "[email protected]";"[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";
"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"
Subject: AVAILABILITY OF FINAL SCOPING REPORT FOR THE PROPOSED MAMATHWANE COMPILATION YARD,NORTHERN CAPE
Date: 18 March 2013 09:42:00 AMAttachments: image001.png
All_stakeholders_Afrikaans (2).pdf
Dear Stakeholder AVAILABILITY OF FINAL SCOPING REPORT FOR THE PROPOSEDMAMATHWANE COMPILATION YARD, NORTHERN CAPE EIA Ref No.: 14/12/16/3/3/2/688 Our sincere thanks to those stakeholders who commented on the Draft Scoping Reportand those who participated in the initial consultation meetings during theannouncement phase.The purpose of this letter is to inform you that the Final Scoping Report (FSR) for theproposed Mamathwane Compilation Yard near Hotazel is available for comment for a21 day period from 18 March 2013 to 8 April 2013.
The FSR will be made available at public libraries close to the proposed developmentand will also be available on the project website www.erm.com/transnet-expansion.The report will be made available at the following public libraries:
Public place Locality Contact detailsKathu Public Library Kathu 053 723 2261Hotazel Public Library Hotazel 053 7422 167Hanover Public Library Hanover 053 643 0330Barkley West PublicLibrary
Barkley West 082 685 9611
Posmasburg Public Library Posmasburg 053 313 0343
How to comment on the FSR reportStakeholders can comment on the FSR report in any of the following ways:
• By writing a letter or producing additional written submissions; and• By email, fax or telephone to ERM.
We look forward to your continued participation and should you have any questions,need more information or wish to comment, please contact please contact PaulMonare at Tel: (011) 798 4300, Fax: 086 292 7318 or email: [email protected]. Yours sincerelyERM
Junaid MoosajeeSenior Consultant
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C56
C4.4 PROOF OF POSTAGE FOR FINAL SCOPING REPORT
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C57
C4.5 PROOF OF EMAIL FOR DRAFT ENVIRONMENT IMPACT REPORT
From: Tougheeda AspelingTo: Tougheeda AspelingBcc: "[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";
"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"; "[email protected]";"[email protected]"; "[email protected]"
Subject: AVAILABILITY OF DRAFT ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE PROPOSED MAMATHWANECOMPILATION YARD, NORTHERN CAPE
Date: 03 December 2013 03:44:00 PMAttachments: image003.png
image002.png
Dear Stakeholder
Our sincere thanks to those stakeholders who commented on the Background InformationDocument and the Scoping Report and those who participated in the consultation meetings.The purpose of this letter is to inform you that the Draft Environmental Impact Report (EIR) forthe proposed Mamathwane Compilation Yard near Hotazel is available for comment for a 40day period from 3 December 2013 to 31 January 2013 (period between 13 December 2013 and2 January 2014 is excluded as per the Regulations). The EIR will be made available at the public library close to the proposed development (seebelow) and will also be available on the project website www.erm.com/transnet-expansion. The report will be made available at the following public library: Public place Locality Contact detailsKathu Public Library Kathu 053 723 2261 How to comment on the EIR report Stakeholders can comment on the EIR in any of the following ways:• By writing a letter or producing additional written submissions; and
• By email, fax or telephone to ERM. We look forward to your continued participation and should you have any questions, need moreinformation or wish to comment, please contact please contact Tougheeda Aspeling at Tel:(021) 681 5400, Fax: 086 5404 072 or email: [email protected]. Yours sincerely
Tougheeda Aspeling Stakeholder Engagement Consultant
ERM Southern Africa (Pty) Ltd2nd Floor | Great Westerford | 240 Main Road | Rondebosch | 7700 | Cape Town | South AfricaT +27 21 681 5400 | F 086 5404 072 | M +27 84 2066187E [email protected]| W www.erm.com
The world’s leading sustainability consultancy
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C58
C4.6 PROOF OF POSTAGE FOR DRAFT ENVIRONMENTAL IMPACT REPORT
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C60
C5 ATTENDANCE REGISTERS
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C61
C6 MINUTES OF MEETINGS
Meeting minutes
Subject/Ref
Transnet Railway Expansion Project- Mamatwane Compilation Yard
Venue
Kalahari Country Club– Public Meeting
Date of Meeting
05 December 2012
Present
See attendance register attached
Issues Raised Responses Is the construction phase water driven? Water is required for the construction phase as well as for dust
management. Transnet is currently sourcing options for water abstraction including sourcing water from surrounding mines, municipality and private water use rights.
Why would an oil water separator be necessary? An oil water separator will be installed within the truck workshop and refuelling area. The oil water separator is expected to be approximately four m3. This area will be bunded and waste collected by the oil water separator will be removed by a licenced hazardous waste removal company.
How many people will be employed during the construction and operational phase?
220km of rail will need to be built and this will take approximately 2 years. Approximately 200 people will be employed during this time. During the operational phase, there will be 60 people employed during a 24 hour cycle i.e. 30 people in the day and 30 people at night.
Where will the workers live? As this moment there is uncertainty regarding the exact location of the operational phase employees. However, Transnet is leaning towards constructing houses within the existing surrounding towns but this will be confirmed at a later stage and requires a different process.
What type of noise impacts can be expected? A noise specialist study will be conducted during the EIA phase and these results will be included in the Draft EIA.
Some of the positive impacts of the project includes decreased number of trucks on the road, positive impact on the local economy, job creation as well as further access and opportunities to small miners. Additionally, the rail acts as an important strategic link mines and the harbour.
Noted. These positive impacts have been included in the BAR.
What happens at the balloon loop? The balloon loop will be used as a stock pile area for smaller mines. Will there be any dust impact associated with the project?
Yes, the dust impact will be further investigated in the EIA phase, however, the Mangenese Ore will be sprayed before transport.
Will construction camps be built? No construction/ worker camps will be built. Local workers will be used.
Will the on-site substation be used? Yes, Transnet currently has an agreement with Eskom to ensure dedicated supply.
When will construction begin? Construction is expected to start in 2014 and end in 2016.
Meeting minutes
Subject/Ref
Transnet Railway Expansion Project
Venue
Kalahari Country Club– Landowner Focus Group Meeting
Date of Meeting
05 December 2012
Present
See attendance register attached
Issues Raised Responses Is another line going to be built? Another line will not be built. Loops will be constructed at certain
sections along the line, to increase the overall capacity of the line. Where exactly will the loops be placed? Maps were shown to the landowner indicating the exact positioning
of the loop (These maps are included as Annex xxx ) With the current loop positioning, there is a piece of land that is cornered in, in which I am unable to do anything with.
Currently, Transnet and the landowner are negotiating the purchase of that cornered piece of land.
As part of the project, will any depots/ houses be constructed as I am concerned that the Transnet workers will fraternize with my workers and that their will an increase in crime?
There will not be any worker camps during the construction phase, as local workers will be employed and they will go home at the end of each day. However, there is currently an option of building a depot at Wincaton for the operational phase.
What about the veld fires? During the construction phase, there will be shields and fire extinguishers present on site in the case of a fire. Additionally, certain potentially fire causing machinery will not be operated if the wind is too strong to help prevent veld fires. It is also highly unlikely that veld fires will occur during normal operations, but they could occur during maintenance periods. If a veld fire does occur, this will be dealt with on a case by case basis.
I am concerned that gates will not be locked during the construction phase.
The locking of farm gates will be written in the construction phase EMP. Additionally, a grievance procedure will be in place during the construction phase.
ENVIRONMENTAL RESOURCES MANAGEMENT TRANSNET (SOC) LIMITED
C62
C7 COMMENTS AND RESPONSES REPORT
Comments/Issues and Suggestions Raised
Commentator Organisation Date Source Response Category
1 Will there be groundwater or soil pollution impacts?
Commenting Authority Commenting Authority 03-Dec-12 Authority Focus Group Meeting
Soil and groundwater impacts are anticipated however they have been rated as minor negative. Fuel will be stored in self bunded, above ground storage tanks in the site camp area and in some cases bunded areas may need to be established for the storage of fuel.
These potential impacts will be further explored in the Environmental Impact Assessment Report for the Mamatwane Compilation Yard. The yard will have small quantities of oil and lubricants and there will be an oil and water separator on site.
Environmental Impact
2 Has an ecological specialist study been done and what were the findings?
Julius Mutyorauta Department of Environmental Affairs & Nature Conservation
03-Dec-12 Authority Focus Group Meeting
Yes, an ecology specialist study has been done and findings are available in the Draft reports. No major negative impacts have been identified within this study. Additionally, for Mamathwane, the ecology specialist study results will be released during the EIA phase.
Specialist Studies
3 Mamathwane will grant access and increase the capacity of the small miners. Additionally, the railway line acts as an important link between the mine and the port.
Commenting Authority Commenting Authority 03-Dec-12 Authority Focus Group Meeting
Agreed, the importance of the railway line and its vital function as the link between mine and port is recognised.
Development
4 What happens at the balloon loop? P. Maritz Landowner 05-Dec-12 Kathu Public Meeting The balloon loop will be used as a stock pile area for smaller mines.
Project Specific
5 What is a loop? E. E. Phete Mayor 04-Dec-12 Postmasburg Public Meeting
A loop is a railway line extension allowing two trains to pass one another without colliding.
Project Specific
6 Why would an oil water separator be necessary?
P. Maritz Landowner 05-Dec-12 Kathu Public Meeting An oil water separator, which is required to cleaning dirty water originating from the locomotive and wagon workshops, will be installed next to the workshops. The oil water separator is expected to be approximately eight cubic metres. This area will be bunded and waste collected by the oil water separator will be removed by a licenced hazardous waste removal company.
Project Specific
7 How many people will be employed during the construction and operational phase?
P. Maritz Landowner 05-Dec-12 Kathu Public Meeting At this stage we know that 12171 direct jobs and 9128 indirect jobs will be created during the construction phase and 572 permanent employment opportunities will be created during the operational phase. Approximately 50-100 jobs will be created per loop.
Employment
Comment and Response Report - Compilation Yard, Northern Cape
8 Is the construction phase water driven? P. Maritz Landowner 05-Dec-12 Kathu Public Meeting Water is required during the constructionphase for dust suppression, layerworks and earthworks.. Transnet is currently sourcing options for water abstraction including sourcing water from surrounding mines and municipalities.
Water
9 Some of the positive impacts of the project include decreased number of trucks on the road, positive impact on the local economy, job creation as well as further access and opportunities to small miners. Additionally, the rail acts as an important strategic link to mines and the port.
P. Maritz Landowner 05-Dec-12 Kathu Public Meeting Thank you for highlighting these positive aspects of the project.
Project Benefits
10 What type of noise impacts can be expected?
P. Maritz Landowner 05-Dec-12 Kathu Public Meeting Noise sources associated with this project are similar to those currently experienced with passing trains although the increased capacity demands would result in an increase in frequency. At present there are 3 trains per day per direction but in future there will be 4 trains per direction so noise frequency will increase as well as the duration of noise.
Noise
11 When will construction begin? P. Maritz Landowner 05-Dec-12 Kathu Public Meeting It is anticipated that construction will begin in 2014.
Project Specific
12 Where will the workers live? P. Maritz Landowner 05-Dec-12 Kathu Public Meeting At this moment there is uncertainty regarding the exact location of housing for the operational phase employees and if additional housing is required. However, Transnet is considering constructing houses within the existing surrounding towns but this will be confirmed at a later stage and requires a different process.
Project Specific
13 Will construction camps be built? P. Maritz Landowner 05-Dec-12 Kathu Public Meeting No construction/ worker camps will be built. Local workers will be used as far as possible and where required, accommodation will be found in the nearest town.
Project Specific
14 Will the on-site substation be used? P. Maritz Landowner 05-Dec-12 Kathu Public Meeting Yes, Transnet currently has an agreement with Eskom to ensure dedicated supply via the substation located at Mamathwane.
Electricity