Transcript
Page 1: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

RC14001® Update

GPCA Responsible Care Committee

September 23, 2013

Page 2: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

Process Safety and

Product Safety Codes

2014-16 Cycle

• ACC wants auditors to verify Process Safety and Product Safety Code implementation during the normal course of audits.

Page 3: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

Auditor Training

Status Report

• Part 1 Training (TS) Changes 105 trained

Additional session on 9/30

• Part 2 Training (Codes) 45 trained

Sessions through 10/31

• Positive feedback from third-party auditors.

• Product Safety Code training in 2014.

Page 4: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

RC14001®

Technical Specification

(2013)

Page 5: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

RC14001® Element 4.3.1

•Aspects/Impacts Identification

•Adds the following language:

The organization shall also consider operational energy efficiency and waste minimization, reuse and recycling when identifying its aspects and impacts.

Page 6: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

RC14001® Element 4.4.6

•Operational Control

•Modify sub-element h) Commensurate with risk, the organization shall have a process to work with as appropriate, review and assess customers, suppliers, contract manufacturers, carriers, distributors, contractors, and third-party logistics providers based on Responsible Care or other health, safety, security and environmental performance criteria that have been established by the organization.

• Consistent with change in RCMS® Tech Spec and Product Safety Code.

Page 7: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

RC14001® Element 4.5.3

• Non-conformity, corrective and preventive action

• Incident and accident investigation language changed:

…the organization shall have:A process to identify, investigate cause(s) and assign significance to incidents and accidents.   Appropriate corrective and/or preventive action(s) shall be taken to avoid recurrence.

Page 8: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

RC14001®

Additional Modification

s

• Use of the Responsible® Care logo (Introduction section – bottom of page 5).

• Definitions and Interpretations (Appendix 1). New note 2 on page 20 – “other requirements to which it subscribes.”

• ACC RC Requirements (Appendix 2).

• Responsible Care federations’ website listing. (Appendix 3).

• ACC website listings.

Page 9: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

Technical Specificatio

n Status

• Technical Specifications are available.

• Transition schedule takes into account surveillance issue.

• RC14001® will need to be modified when new ISO 14001 document is released.

• RCMS® Implementation Guidance available in late July.

Page 10: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

ISO 14001 Revision Process

Concerns

• Business community was not engaged.

• Process was on a strict three-year timeline.

• Is there a real desire among users of ISO MS for integration?

• Is this truly working according to ISO consensus procedures?

• Both ISO 14001 and ISO 9001.

• Significant changes for ISO users’ community, auditors and accreditation bodies.

Page 11: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

ISO 14001:201X CD Clauses 1. Scope

2. Normative references

3. Terms and definitions

4. Context of the organization– Understanding the organization and its

context– Understanding needs and expectations

of interested parties– Scope of the management system– Management System

5. Leadership– Leadership & commitment– Policy– Organizational roles, responsibilities

and authorities

6. Planning– Actions to address risks &

opportunities• General• Environmental aspects• Legal & Other requirements

– Objectives and planning to achieve them• Environmental objectives• Environmental improvement

programs

7. Support– Resources– Competence – Awareness– Communication• General• Internal Communication• External Communication

– Documented information• General• Creating and updating• Control of documented information

8. Operation– Operational planning and control– Value Chain planning and control– Emergency preparedness & response

9. Performance evaluation– Monitoring, measurement, analysis &

evaluation• General• Evaluation of compliance

– Internal audit– Management review

10. Improvement– Non conformity and corrective action– Continual Improvement

Key:Black – core MS requirement , comparable to 14001:2004Red – New MS requirementsBlue – ISO 14001, discipline-specific

Page 12: RC14001 ® Update GPCA Responsible Care Committee September 23, 2013

Longer Term Issues

ISO 14001 and new ISO OSH

Standard

•ISO 14001

• Little progress on CD-1 document at meetings in June.

• Continuation of discussions in Bogota in October.

• Still a lot of controversy over definitions and extent of EMS scope.

• 2015 – possible release of new version.

• OSH standard

• New ISO project

• US Technical Advisory Group started


Top Related