Transcript
Page 1: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Rebuilding Lives, Sharing Knowledge, Shaping Systems

Connecticut Balance of StateProvider MeetingMarch 26, 2013

Page 2: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Agenda

• Welcome, Introductions & Acknowledgments

• BOS Overview

• 2012 CoC Application Debrief

• HUD, HEARTH and BOS Priorities & Policies

• 2012 Renewal Evaluation Results

• 2013 Renewal Evaluation Criteria, Scoring & Process

• Annual Performance Review (APR) Highlights

• 2013 BOS NOFA Process

Page 3: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

What is the BOS CoC?

Balance of State regions:

• New Haven suburbs

• Hartford suburbs

• The Valley

• Windham/Tolland Counties

• Litchfield County

• Manchester

• SE CT - New London/Norwich

• Middletown/Middlesex

• Bristol

• Danbury

• New Britain

Page 4: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

WINDHAM/TOLLANDKATHY CREES

CT BOS Steering Committee

JOHN MERZ, CO-CHAIR STEVE DILELLA, CO-CHAIRACT CT DMHAS

NEW BRITIAN THE VALLEY

HARTFORD SUBURBS

NEW LONDON/NORWICH NEW HAVEN SUBURBS

MANCHESTERJILL BENSON

BRISTOL CONSUMERDAVID RINALDI

DANBURY

DSSCASSANDRA NORFLEET-JOHNSON

CHFATERRY NASH

CSH VASARAH GALLAGHER

DOE

BARBARA GELLERDMHAS

LOUIS TALLARITA

Localities with no representation

RON KROM

ELLEN SIMPSON

PRESTON MAYNARD

LITCHFIELDNANCY CANNAVO

PHIL LYSIAK

DAVE PASCUA

MIDDLESEX/MIDDLETOWN

CCEHFRAN MARTIN

MILENA SANGUT

Page 5: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

BOS Steering Committee Members

SC Members: CT DMHAS, DSS, DOE; CHFA, VA, CCEH, CSH, Consumer

Local “Sub-CoC” Representatives – Bristol, Danbury, Litchfield Cty, Manchester, Middlesex Cty, SE CT, Windham/Tolland

Adding Criminal Justice, others per Action Plan

Requirements for Local “Sub-CoC” Steering Committee representation:

• Locality must have:• Functioning CoC or planning body•At least 4 mtgs per year (and provide

documentation of mtgs)

Page 6: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

BOS Subcommittees

“Meet” as part of Steering Committee Meetings (monthly or bi-monthly)

• HMIS - comprised of SC members and/or reps from localities with SC representationReview HMIS implementation and compliance with HUD

Review HMIS Reports and Monitor Data QualityEnsure CoC is prepared for HEARTH by obtaining baseline performance data

Identify HMIS support and training needsReport and make recommendations to BOS Steering Committee

Page 7: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

BOS Subcommittees (cont)

Mainstream Resources Monitor BOS program’s performance on Accessing Mainstream Resources and Benefits

Work on Discharge Planning with Foster Care, DOC, Hospitals

Help coordinate BOS CoC Resources with other Mainstream Funding/Services – NSP, VASH, DOE

Coordinate trainings on entitlements and employment

Page 8: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Application Debrief

• BOS Renewal Awards: $11,614,987 – all 71 renewals funded

• Rental Assistance – 29 projects - $5,766,934

• Leasing – 30 projects - $4,332,786

• Operating/Services – 11 projects - $1,457,202

• HMIS – 1 project - $58,065

• Reallocation and New Project awards to be announced this Spring

Page 9: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Debrief

• NOFA:

No more “Exhibit 1 and 2”

Additional Planning Questions and Outcome Measures

Ranking and Tiering

•2013 NOFA – due out May/June!!!!!!!!!

Page 10: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 CoC Scoring

Factor 2011 Points 2012 PointsPerformance 32 34Strategic Planning - See CoC Action Plan 22 55

CoC Housing & Services 14 14Leveraging In performance (3) 6Homeless Needs & Data Collection 26 HMIS – 13

PIT - 8Housing Emphasis 6 Not in scoringBonus – admin at or below 7% and 100% CH in bonus N/A 4

Total Possible 100 134

Page 11: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

New Budget Categories – Supportive Services

Beginning with 2012

1. Assessment of Service Needs

2. Assistance with Moving Costs

3. Case Management

4. Child Care

5. Education Services

6. Employment Assistance

7. Food

8. Housing Counseling Services

9. Legal Services

10. Life Skills

11. Mental Health Services

12. Outpatient Health Services

13. Outreach Services

14. Substance Abuse Treatment Services

15. Transportation

16. Utility Deposits

Page 12: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Beginning with 2012 Application

1. Maintenance/Repair Exterminating, garbage removal, janitorial contracts, annual

2. Property Taxes and Insurance

3. Replacement Reserve

4. Building Security

5. Electricity, Gas, and Water

6. Furniture

7. Equipment (lease, buy)

New Budget Categories - Operating Funds

Page 13: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Debrief – 2012 Housing Inventory (HIC)

• Emergency Shelter: beds

• Individual beds: 497

• Families: 124 units/385 beds

Transitional Housing: 541 beds

• Individual beds: 255

• Families: 83 units/232 beds

Permanent Supportive Housing: units

Individuals: 1076

Families: 274 units/813 beds

Page 14: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Debrief – 2012 PIT Homeless Count

• Single Adults - People

Sheltered: 555Transitional: 217Chronic:170Total: 772

• Families - Households

Sheltered: 106Transitional: 70Chronic: 13Total: 176

Page 15: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Consolidated Application (formerly Exhibit I) Performance and 2013 Goals

• In 2012, CoC met objectives in identified in 2011

• CH Beds

CH Beds in 2012 - 623

2013 Goal is 652

• TH to PH

78% of people exiting TH went to PH in 2012

2013 Goal is 79%

Page 16: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Consolidated Application (formerly Exhibit I) Performance and 2013 Goals – 2

• PSH Retention

90% of people stayed in PSH six months or longer

2013 Goal is 90%

• Decrease # of Homeless Families

There were 187 homeless families in 2012

2013 Goal is 186

• Employment

22% of people were employed at program exit in 2012

2013 Goal is 23%

Page 17: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Consolidated Application (formerly Exhibit I) Performance and 2013 Goals - 3

NEW -- Obtained mainstream benefits at program exit – Standard is 20%

In 2012, 72% had mainstream benefit at exit

2013 Goal is 73%

NEW – Reallocation

2013 Goal is to reallocate 1 TH or SSO project

• Please contact CoC asap if you are interested in reallocation

Page 18: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Mainstream Resources at Exit – BOS Performance

Page 19: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HEARTH Highlights

HEARTH INDICATORS Decrease numbers of people who are

homeless

Reduce returns to homelessness

Decrease length of stay in the homeless system

Increase income, exits to PH

Page 20: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HEARTH Highlights - Rental Assistance & Leasing

No more SHP and S+C – programs are together under HEARTH as one

Rental Assistance Projects Old S+C and projects that converted

Tenant holds lease, rental assistance is administered through housing authority or DMHAS

Leasing Projects Agency holds lease, HUD is exploring different options and

will issue guidance on this

Services/Operating Projects Projects with services and/or operating monies

Page 21: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HEARTH Highlights - Performance

Greater emphasis on performance

Report in project application and APRs:

Obtain/maintain PH

Maintain/increase income

Focus on:

APRs submitted on time

Regular draw-down of funds

Spending all program funds

Match and Leveraging with letters/documentation

Page 22: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• CoC required to demonstrate that it is:

Collaborating with local education agencies to assist in identification of homeless families and

Informing homeless families and youth of their eligibility for McKinney-Vento education services

• CoC required to demonstrate that it is:

Considering education needs of children when families are placed in emergency or transitional shelter and

Placing families with children as close as possible to schools of origin

HUD Policies Reminders CoC Required Educational Assurances

Page 23: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Projects and programs serving families with children must demonstrate that their programs are:

• Establishing policies and practices that are consistent with the education subtitle of McKinney-Vento Act and other laws relating to education and related services to homeless people

• Designating a staff person to ensure that children are enrolled in school and connected to services in the community including programs such as:

Head Start Part C of the Individuals with Disabilities Education Act

McKinney-Vento education services

Programs’ Required Educational Assurances

Page 24: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Liaisons in every school district with responsibilities to identify homeless children, assist with enrollment and participation, refer families to Head Start and other services

• School Stability –schools must keep in original schools, unless not in best interest or not desired by parent/youth

• Transportation –schools must provide for stability and access, even crossing district lines

• Immediate Enrollment –even without records

Rights under the Education Subtitle of McKinney Vento

Page 25: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Dispute process –families and youth can dispute school decisions; must be enrolled during the dispute process

• Homeless children and youth are categorically eligible for free school meals; they do not have to fill out paperwork (list from liaison or shelter director suffices)

• Homeless children and youth are categorically eligible for extra support through Title I (Education for Disadvantaged Federal program), no matter what school they attend

Rights under the Education Subtitle (cont)

Page 26: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Unaccompanied youth: a child or youth who meets the definition of homeless and is not in the physical custody of a parent or guardian. These youth are typically fleeing abuse or neglect at home, but are not involved in the child welfare system

Liaisons must consider their wishes in school placement, help with disputes

• Preschool children: 51% of all children in HUD-funded shelters are under the age of 6. Liaisons must ensure homeless children have access

to Head Start and LEA-administered preschool programs

Rights under the Education Subtitle - Special Populations

Page 27: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HUD Policies RemindersRequirements for Mainstream Resources Enrollment

Case managers systematically assist clients in completing applications for mainstream benefits

Homeless assistance providers supply transportation assistance to clients to attend mainstream

• benefit appointments, employment training, or jobs

Homeless assistance providers use a single application form for four or more mainstream programs

Homeless assistance providers have staff systematically follow-up to ensure mainstream benefits are received

Page 28: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Addressing Street, Veteran and Youth Homelessness

Describe the CoC's current efforts to combat homelessness among veterans and youth

Identify organizations that are currently serving these populations, how these efforts are consistent with CoC strategic plan goals, and how the CoC plans to address this issue in the future

Describe the CoCs efforts to identify and engage persons that routinely sleep on the streets or other places not meant for human habitation

Page 29: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Coordinated Access

Required by HUD

Opening Doors - Crisis Response Group working on plans

Next meeting 4/19 @ 1:00 pm

Build and expand existing systems – ex. 211

Implementation to begin this summer

Page 30: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

BOS Admissions Policies - Marketing

• Marketing for Housing and Services:

• NOFA Language: “Describe the procedures used by the CoC and its programs to market housing and supportive services to eligible persons regardless of race, color, national origin, religion, sex, age, familial status, or disability who are least likely to request housing or services in the absence of special outreach”Providers should have non-discrimination policies in place and assertively outreach to people not involved in the homeless system. BOS Policy to be adopted May ‘13

Page 31: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

BOS Admission Policies –Discharge Planning

• Accepting People from Other Public Systems of Care:

• The HEARTH Act stipulates that state and local governments have policies in place to ensure that public institutions do not routinely discharge individuals into homelessness. 

• Before accepting participants into CoC programs from the Mental Health, Foster Care, Correctional or Public Health Systems, providers will work to ensure that all other discharge options have been exhausted.

• Accepting a person directly from publicly-funded institutions should only be considered if there are no other viable housing options and the person meets the eligibility criteria for the bed or unit.

Page 32: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

BOS Admission Policies – Families with Children <18

• Keeping Families IntactPublicly funded Shelters and Transitional Housing in the BOS CoC cannot deny admission or separate families with children under 18 based on the age or gender of a child unless they have obtained a waiver from the BOS CoC Steering Committee.

• Enrollment in SchoolBOS Providers will make every effort to ensure that homeless children are enrolled in school within 48 hours of entry into the program.

Page 33: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HMIS Update and Discussion

New Vendor – Empowered Solutions Group

Universal Data ElementsGoal is to have 0% no value and low refused/unknown

Bed Coverage

Goal is to have 86% for ES, TH, PSH and RR

Training Available

www.cthmis.com/site/

Page 34: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Performance – HMIS – Universal Data Elements

Page 35: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Criteria for Evaluating CoC Renewal Projects

Occupancy at 90%85% of people in PSH stay 7 at least 6 months

80% leaving TH go to permanent housing30% of leavers have some form of health insurance

50% of leavers have food stamps25% of leavers have income from employment

2012 Renewal Evaluation Criteria

Page 36: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Renewal Evaluation Criteria (con’t)

Criteria for Evaluating CoC Renewal Projects85% maintain or increase income at exit90% did not leave for an undesirable destination (unknown, unsheltered, jail, etc)

90% leave with financial resources (cash and non-cash)

90% of HUD Required Data Elements are in HMIS

35% Consumer survey response rateConsumer satisfaction survey score

Page 37: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Renewal Evaluation Results

Criteria

All Projects

2012

All Projects

2011  TH

2012PSH 2012

TH 2011

PSH 2011

APR (50) 45 42 41 46 38 43Surveys (15) 13 13 13 14 13 13HMIS Standards (10) 10 10 10 10 9 10HMIS Data Quality (10) 10 9 10 10 9 9Budget Accuracy (15) n/a 14 n/a n/a 14 14Final Score (100) 92 88 87 93 84 89 

Median 96 91 87 97 84 93High 100 100 97 100 97 100Low 61 54 79 61 76 59 # of Projects scored 76 76 9 65 9 65

Page 38: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2012 Renewal Scores and Corrective Action Policy

• Each year the Steering Committee establishes a minimum scoring threshold.

• Projects scoring below 75 must do a corrective action plan.

• Agencies in corrective action process are not eligible to apply for funding for new projects.

• Programs in corrective action status for 2 consecutive years may be at risk of losing their funding. (Has never happened)

Page 39: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Achieving HEARTH Performance Measures

• CT Performance Measures (see handout)

Based on HUD/HEARTH benchmarks

Incorporated in CT BOS CoC standards for renewal projects

Page 40: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Criteria for Evaluating CoC Renewal ProjectsOccupancy at 90%90% of people in PSH stay 7 at least 6 months

85% leaving TH go to permanent housing60% of leavers have some form of health insurance

60% of leavers have food stamps25% of leavers from PSH have income from work

40% of leavers from TH have income from work

85% maintain or increase income at exit

2013 BOS Renewal Evaluation Criteria

Page 41: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

2013 BOS Renewal Evaluation Criteria (con’t)

Criteria for Evaluating CoC Renewal Projects10% or less leave for did not leave for shelter, street or unknown

80% leave with non-cash financial resources35% Consumer survey response rateConsumer satisfaction results Timely draw-down of fundsSpending all grant funds awarded for last full year of operation

HUD monitoring results and findings90% of HUD Required Data Elements are in HMISMeet HMIS compliance standards

Page 42: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HUD APR – Why is it important?

The APR impacts your program in important ways:

• Used by HUD to: Evaluate your progress Aggregate national data about homeless

people & programs Review HEARTH Indicators:

Decrease numbers of people who are homelessReduce returns to homelessnessDecrease length of stay in the homeless

systemIncrease income, exits to PH

Page 43: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

HUD APR – Why is it important? - 2

The APR impacts your program in important ways: Used by CT BOS to: Score and rank programs for renewal Compile aggregate data for the HUD

application, which affects how much $ the CT BOS CoC receives

Necessary to keep CoC and project funds flowing

Page 44: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Measured through the APR:

At least 80% of homeless persons stay in permanent housing for more than 6 months

At least 65% of homeless persons in Transitional Housing move into permanent housing

At least 20% of homeless persons are employed at exit

At least 20% of leavers have noncash benefits at exit

HUD Standards

Page 45: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Objective related to housing stability:# of Persons age 18 and older who maintained or PSH or exited to PH as of the end of the operating year or program exit

• Objective related to improving income:# of Persons age 18 and older who maintained or increased their total income (from all sources) as of the end of the operating year or program exit

Other HUD Standards – Set by Programs

Page 46: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR – Key Definitions - Leavers and Stayers

Leavers:

Persons who exited the program and are no longer enrolled in the program as of the last day of the reporting period.

Stayers:Persons who were in the program on the last day of the reporting period. This includes clients who exited the program and re-entered the program before the end of the reporting period.

Page 47: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR – Key Definitions – Client Type

• Adult:

Any person 18 years of age or older.

A person’s age is based on the program entry date closest to the end of the operating year.

If a person entered the program prior to the start of the reporting period, the person’s age should be based on the first day of the reporting period.

Page 48: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR – Key Definitions – Client Type

• Children:

Any persons under the age of 18.

A person’s age is based on the program entry date closest to the end of the operating year.

If a person entered the program prior to the start of the reporting period, the person’s age should be based on the first day of the reporting period.

Page 49: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR – Key Definitions - Households

• Household without Children:–

A household that does not include any children, including unaccompanied adults, multiple adult households, and pregnant women age 18 or older not accompanied by other children.

For the purposes of APR reporting, households without children that contain multiple persons should be counted as one household without children.

Page 50: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR – Key Definitions - Households

• Household with Children – Any household with at least one child. There are two types of households with children:

Households with at least one adult and one child include households composed of at least two persons, one of whom is an adult and one is a child.

Households with only children are composed only of persons age 17 or under, including unaccompanied children, adolescent parents and their children, adolescent siblings, pregnant women under 18 years old, or other household configurations composed only of children

Page 51: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR – Key Definitions - Operating Year

For SHP programs, the operating year is the 12-month period beginning on the Operating Start Date.

For new grants without funds for acquisition, construction or rehabilitation, the operating start date is the first day of the month in which the grantee or sponsor begins incurring eligible costs. The date is set by the grantee at the time of first draw down from LOCCS.

The operating year start and end dates entered into the APR should correspond with the operating start and end dates entered into LOCCS

Page 52: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR Highlights – Pre-APR Checklist - Leavers

• Prior to working on APR, gather following info from Pre-APR checklist: 

• Leavers• Number of:

1. Adult Leavers without Children:2. Adult Leavers with Children: 3. Children Leavers:4. Total Adults Leavers: 5. Total Leavers:

Page 53: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR Highlights – Pre-APR Checklist - Stayers

• Prior to working on APR, gather following info • from Pre-APR checklist: • Stayers• Number of:• 6. Adult Stayers without Children• 7. Adult Stayers with Children• 8. Children Stayers• 9. Adult Stayers (6+7)• 10. Total Stayers (8+9)

Page 54: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR Highlights –Who are you reporting on?

• For questions related to all persons, the column “With Children and Adults” must include all persons in family households

• Q15 (Age) question related to all persons served but adults and children are on different tables

• Q16-Q20 questions related to all persons served

• Q21 (Vets) question refers to Adults only

•  

Page 55: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR Highlights –Who are you reporting on?

• Q22, 25-26 questions related to all persons served but leavers and stayers are on different tables.

• Q23 (Cash Income) question related to Adults only but leavers and stayers are on different tables.

• Q27 (Length of Stay) question related to all persons served

• Q29 (Destination) question related to all persons exiting based on length of stay

Page 56: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

APR Submission Deadline

APRs are to be completed and submitted within 90 days of the end of your HUD program’s operating year by the following program types:

• Failure to submit APR within 110 days of end of operating year will stop drawdowns from LOCCS

• No time limit on submitting corrected APR

Page 57: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Final APR An APR is a final APR if it is covering the last operating

year of your grant or your grant was for only a one-year term.

• Amended APR To submit a corrected or amended APR, you must first

submit a question requesting the ability to amend your APR via the Virtual Help Desk at www.hudhre.info/apr. If HUD approves this request, you will be able submit a corrected or amended APR.

Other Key Definitions

Page 58: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• Target Population from Application is Being Served• Number of People Served is consistent with the

application

• Participants are Eligible Homeless from streets shelters or transitional housing for homeless

people Disabled where applicable

• Ongoing Assessments of Service Needs are conducted at least annually

• Children are Enrolled in School – Staff who is Educational Liaison

• Rent is calculated correctly Income is re-examined annually

HUD Program Priorities – Important for Monitoring

Page 59: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Terminations follow a protocol that guarantees rights of participants to due process

Non-discrimination in all activities Procedures to provide information on

handicapped accessible services and serve people with Limited English Proficiency (LEP)

Homeless or formerly homeless people participate in the program’s policy-making processFor example, member of the Board of Directors

HUD Program Priorities – Important for Monitoring - 2

Page 60: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

• APR’s and other required documentation submitted on time

• Funds expended in a timely manner and spent on eligible activities

• Cash match requirements are met

• Proper financial controls

• Evidence of staff time working on grant - timesheets

• Drug-free work place

HUD Program Priorities – Important for Monitoring - 3

Page 61: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Resources

APR Training materials: https://www.onecpd.info/resource/2002/coc-annual-performance-report-apr-virtual-training/

Main HUD Resources Webpage:

www.onecpd.info

General Info on Homelessness: National Alliance

www.naeh.org

Sign up for Listservs from HUD and NAEH!!

Page 62: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Expectations and Preparations for 2013

1. PIT Count and HIC in HDX Database - April

2. GIW (Grant Inventory Worksheet) Update – April/May?

3. Updated APR’s – Due April 15th

4. Consumer Satisfaction Surveys – Due April 26th

5. Consolidated Application (formerly Exhibit 1) Information – Due April 26th

6. New Project RFP – TBD (May?)

7. Training for Providers – May, June

Page 63: Rebuilding Lives, Sharing Knowledge, Shaping Systems Connecticut Balance of State Provider Meeting March 26, 2013

Thanks!

•For Questions Contact:

• Suzanne Wagner• [email protected]

Liz Isaacs• [email protected]

• Myles Wensek• [email protected]


Top Related