Registration of OPMET data for Regional
and Inter-Regional exchange
*
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris
EUR DMG FP: Herman Swinnen
Ref.: IWXXM_ICAO_PARIS_Workshop_WPxx_OPMET_Data_Update_Procedure_v01.docx
*
*SUBJECTS: DMG EUR Presentation
DMG EUR Doc 018 EUR OPMET Data Management
OPMET Data Update Procedure: registration of
OPMET Data distributed by and in EUR-Region
OPMET Data programme distribution: EUR RODEX
(Regional OPMET Data Exchange)
None-EUR Regions: registration of OPMET Data
Programme for Inter-Regional distribution
Global OPMET Data Update Procedure
TAC - IWXXM OPMET Data distribution
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 2
*
* ICAO EUR Doc 018 EUR OPMET Data Management Handbook:
OPMET Data definition, validation, exchange.
Regional OPMET Database (RODB): App A Interface Control Document
Registration: App B EUR OPMET Data Update Procedure
Monitoring: App C OPMET Data Monitoring Procedure
Monitoring Specs: App D OPMET Data Analyser specifications
Distribution: App E OPMET Data Distribution determination, RODEX (Regional OPMET Data Exchange) Schema
Performance Indices: App F OPMET Data Availability, Regularity, Timeliness
SIGMET Inventory: App G EUR WS- and WV-SIGMETs lists
* Problem Handling Procedure:
DMG Internet problem ticketing application for reporting and handling OPMET data problems
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 3
*
*EUR AIRAC METNO Procedure for registration of OPMET data programme distributed over AFS (AFTN – AMHS/SADIS):
By EUR States (NOCs – ROCs/IROGs) via DMG Focal Point
ICAO Table MET II-2 (FASID MET 2A – SUG Annex 1) required AOP data
EUR-Region National data
Inter-Regional data
*Distribution OPMET Data programme: on AFS
EUR OPMET data: Regional and Inter-Regional
None-EUR OPMET data: From other Region to EUR
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 4
*
*AIRAC Cycle: every 28 days, on Thursdays
Registration of OPMET changes for AFS distribution
AIRAC 1: DMG FP collection of OPMET change proposals
AIRAC 1 + 7 Days: DMG FP eMail EUR publication of
received change proposals
AIRAC 1 + 14 Days: Delibaration of proposed changes
AIRAC 1 + 21 Days: DMG FP AIRAC METNO Bulletin with
accepted changes via AFS and eMail
AIRAC 2 = AIRAC 1 + 28 Days: Accepted OPMET changes to
become operational for distribution on AFS
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 5
*
*AIRAC METNO Bulletin: NOBX99 EBBR
An OPMET Bulletin: TTAAii CCCC, includes either a SIGMET
report, a GAMET report, an AIRMET report, an AIREP
report, SPECI/METAR observations, or TAF reports.
ADDRPT / RMVRPT: for adding or removing METAR
observations and TAF reports from an existing bulletin
NEWBUL / DELBUL: for the introduction or deletion of
OPMET bulletins
NEWTIM / DELTIM: for changes to the TAF Validity Period
or the METAR Observation Times of all reports in a bulletin
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 6
*
*Examples of AIRAC METNO Bulletins:
NOBX99 EBBR YYGGgg
METNO EUR OPMET 130307
ADDRPT SALV32 EVRA EVJA
NEWBUL FCLV34 EVRA EVJA
NEWTIM FCLV34 EVRA EVJA 0009 0312 0615 0918 1221 1524 1803 2106
DELBUL FCRH31 LDZM
DELBUL FCRH32 LDZM
NEWBUL FTRH32 LDZM LDZD LDOS
NEWBUL FTRH33 LDZM LDRI LDLO LDSB
END
METNO EUR OPMET 130308 EXTRA
NEWBUL SAUK20 EGGY EGRE EGRF EGRG EGRI EGRK EGRL EGRM EGRN EGRO
EGRP EGRS EGRT EGRV EGRW
END
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 7
*
*Result of the EUR OPMET Data Update Procedure: OPMET Data register EUR OPMET Data for Inter-Regional AFS distribution by
the EUR IROGs
None-EUR OPMET Data for AFS distribution in the EUR Region by the EUR IROGs/ROCs
ROC/IROG AFS Routing Tables based on registered OPMET Data (TTAAii CCCC)-AHL
*OPMET Data register: AOP Aerodrome OPMET Data.
ICAO Table MET II-2 required OPMET Data
OPMET Data validated against the ICAO (EUR) standards before dissemination.
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 8
*
*DMG OPMET Data Register: example BX extract
…
…
…
…
…
TT AA ii CCCC Stations or FIRs/UIRs as applicable
FA AJ 31 UBBB UBBB
FA BU 31 LBSM LBSR
FA BX 31 EBBR EBBU
FA CR 40 LEMM GCCC
FC AU 31 YBBN WPDL YAMB YBHM YBMA YPGV YSDU YSNF
FC BX 31 EBBR EBAW
FC BY 31 UMMM UMMM
FT BW 31 VGEG VGEG
FT BX 31 EBBR EBBR EBCI EBLG EBOS ELLX
FT BY 31 UMMN UMGG UMMS
WS BU 31 LBSM LBSR
WS BX 31 EBBR EBBU
SA BW 31 VGHS VGHS
SA BX 31 EBBR EBAW EBBR EBCI EBLG EBOS ELLX
SA BY 31 UMMN UMBB UMGG UMII UMMG UMMM UMMS UMOO
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 9
*
*OPMET Data Routing in EUR ICAO Region Considering the Belgian OPMET Data as an example:
Belgium (ICAO=EB.., WMO A1A2=BX) in ROC EGGY Area of Resonsibility
Meteo EBBR collects/compiles/sends all (TTBXii EBBR)-data to ROC EGGY
ROC/IROG EGGY routes (TTBXii EBBR)-data to
Other EUR ROCs: LOWM and LFLF for dissemination to EUR NOCs and None-EUR ICAO-Regions in their AoR
EGGY AoR Regions: ASI-, CAR-, NAM-, NAT-, PAC-, SAM-ICAO IROGs
(Regional + Inter-Regional) distribution = Global distribution
*The EUR ROC/IROGs Inter-Regional AoR EGGY: ASI, CAR, NAM, NAT, PAC, SAM
LFLF: AFI
LOWM: MID
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 10
*Global OPMET Data Update
Procedure (1/2)
*Regional OPMET Data Update Procedure
EUR METNO Procedure applicable in other ICAO
Regions?
*ICAO METNO Procedure: Benefits (major)
Regional OPMET Data catalogues: AOP and Non-AOP
Data verification and validation at the origin
Optimised AFS distribution: dupes, volumes
definable, traceable problems, …
Transparant OPMET Regional/Inter-Regional routing
OPMET data quality monitoring
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 11
*
*ICAO METNO Procedure: Possible issues (major) For the ICAO Regions: NOC/ROC/IROG,FP equivalent organisation.
Inter-Regional transition AFTN/CIDIN towards AMHS transition.
Inter-Regional Routing schemas to be identified and to be optimised.
AOP and Non-AOP OPMET data in dedicated Bulletins.
Revisit the WMO-No. 386, Part II Section 2.3.2 for the routing determination by the TTAAii-Bulletin Number.
One-time-off Regional OPMET data programme list of current OPMET data for regularisation by means of the ICAO OPMET Data Update procedure.
The AIRAC-Cycle not flexible enough to process intermediate changes, also in prospect of IWXXM emerging.
IROGs Have to review their OPMET data routing processes 1) for the Inter-Regional exchange and 2) for the Regional distribution via the ROCs.
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 12
*
*The EUR OPMET Data Update Procedure shall
be enabled for the introduction of IWXXM data
that is to be distributed in parallel of the TAC
formatted OPMET data
*Identification of the OPMET data programme to
be transferred to IWXXM
*Optimisation of WMO OPMET TAC-Code
adherence in favour of the transition and
translation to IWXXM
31 May - 2 June 2016 IWXXM Workshop - ICAO Paris 13