Roosevelt High Renovation Project
13th Street Entryways
Exterior West Elevation of Area A
Area B Mechanical Room
Area A Ground Floor Garage
Area A 1st Floor
Area A Roof
Waterworks West Elevation
Waterworks Courtyard East Elevation
Area C Mechanical Rough-ins
Area C/D Ground Floor Non-Structural Steel Stud Framing
Area C/D 2nd Floor Rough-in for Plumbing for Restrooms and Mechanical Risers
Area C/D 1st Floor Window Trim Mock-up
Area C 2nd Floor Masonry
Area D 3rd Floor Corridor
Atrium South Elevation
Atrium West Elevation
Atrium East Elevation
Enlarging Existing Opening from Area D to Area E
Area D Demo of Existing Structure
Pavilion Auger Cast Piles
Pavilion Auger Cast Piles
Area E Stairs North of the Gymnasium
Area E Gymnasium
Area E 1st Floor Locker Rooms
Area E Openings to the Pavilion
Area E New Elevator Layout