  • RUDRAYYA C YARAGAMBALIMATH

    BE(MECHANICAL)

    HVAC DESIGN ENGINEER (REVIT MEP)

    [email protected]

    Contact No: +91-7411418211

    PROJECT PORTFOLIO

    mailto:[email protected]

  • HVAC PROJECT DETAILS

    Building type: Commercial building

    Location: Bangalore, India

    Floors: Ground floor + 16 floors

    Area: 3,00,000 sf

    Cooling load: 352 TR

    Occupancy: 3,584 people

    Operating Schedule: 5 Days / Week

    Air distribution system: VAV Single Duct

  • TYPICAL FLOOR PLAN

  • 3D VIEW OF BUILDING

  • HEAT LOAD REPORT

  • AIR DISTRIBUTION DESIGN

  • AIR DISTRIBUTION SYSTEM

    Floor mounted AHU is selected to distribute air

    Comfort condition 77F And 50% RH

    ADP is 54F And 8,000 CFM

    Chilled water inlet 8C And outlet is 15C

    VCD are placed at beginning of each Duct

    Backward curved Aerofoil blade Centrifugal fan is selected

    for AHU

    Inline centrifugal fan is selected for Exhaust air

    MERV 8 Filter is selected for AHU

  • DUCT PRESSURE DROP ANALYSIS Pressure drop is due to bends and head

    Static pressure in critical path is 29 Pa & 52 Pa

    Based on Static pressure in critical path AHU fan is selected

  • CHILLER PLANT DESIGN

    Total building cooling load 352 TR

    Water cooled screw chillers 2 quantities

    175TR+175TR

    Cooling tower Approach is 3C And Range is 4C to

    8C

  • ELECTRICAL SYSTEM

    Ladder type cable trays are used

  • SECTIONAL VIEW

    Lighting fixture Sprinkler

    Diffuser False Ceiling

    True Ceiling

  • PLUMBING

    1:100 Slope for sanitary pipes

    Sanitary pipe connection should be 45

  • CO-ORDINATION OF ALL FLOORS

  • FIRE FIGHTING Fire fighting system is designed as per NBC

    standards for commercial building

    Pipes are sized based on No of sprinklers

  • INTERFERENCE CHECK Interference Report Project File: F:\HVAC REVIT PROJECT\floor project\RUDRA _Mechanical

    Project.rvt

    Created: Friday, May 27, 2016 4:06:49 PM

    Last Update:

  • CLASH DETECTION & SOLUTION

    Clash in between

    supply duct and cable

    tray.

    Clash is solved by

    moving supply duct

    Clash in between

    column and supply duct.

    Clash is solved by

    moving supply duct

  • ANNOTATION Labels are created to annotate duct size, flow

    rate and BOD

    Diffusers are tagged with neck size and CFM

  • CREATING FAMILY (AHU)

  • A1 DRAFT SHEET

  • BILL OF QUANTITY

  • THANK YOU