PROJECT PORTFOLIO

Page 2: RUDRA 7 portfolio

HVAC PROJECT DETAILS

Building type: Commercial building

Location: Bangalore, India

Floors: Ground floor + 16 floors

Area: 3,00,000 sf

Cooling load: 352 TR

Occupancy: 3,584 people

Operating Schedule: 5 Days / Week

Air distribution system: VAV Single Duct

Page 3: RUDRA 7 portfolio

TYPICAL FLOOR PLAN

Page 4: RUDRA 7 portfolio

3D VIEW OF BUILDING

Page 5: RUDRA 7 portfolio

HEAT LOAD REPORT

Page 6: RUDRA 7 portfolio

AIR DISTRIBUTION DESIGN

Page 7: RUDRA 7 portfolio

AIR DISTRIBUTION SYSTEM

Floor mounted AHU is selected to distribute air

Comfort condition 77ºF And 50% RH

ADP is 54ºF And 8,000 CFM

Chilled water inlet 8ºC And outlet is 15ºC

VCD are placed at beginning of each Duct

Backward curved Aerofoil blade Centrifugal fan is selected

for AHU

Inline centrifugal fan is selected for Exhaust air

MERV – 8 Filter is selected for AHU

Page 8: RUDRA 7 portfolio

DUCT PRESSURE DROP ANALYSIS Pressure drop is due to bends and head

Static pressure in critical path is 29 Pa & 52 Pa

Based on Static pressure in critical path AHU fan is selected

Page 9: RUDRA 7 portfolio

CHILLER PLANT DESIGN

Total building cooling load 352 TR

Water cooled screw chillers 2 quantities

175TR+175TR

Cooling tower Approach is 3ºC And Range is 4ºC to

8ºC

Page 10: RUDRA 7 portfolio

ELECTRICAL SYSTEM

Ladder type cable trays are used

Page 11: RUDRA 7 portfolio

SECTIONAL VIEW

Lighting fixture Sprinkler

Diffuser False Ceiling

True Ceiling

Page 12: RUDRA 7 portfolio

PLUMBING

1:100 Slope for sanitary pipes

Sanitary pipe connection should be 45º

Page 13: RUDRA 7 portfolio

CO-ORDINATION OF ALL FLOORS

Page 14: RUDRA 7 portfolio

FIRE FIGHTING Fire fighting system is designed as per NBC

standards for commercial building

Pipes are sized based on No of sprinklers

Page 15: RUDRA 7 portfolio

INTERFERENCE CHECK Interference Report Project File: F:\HVAC REVIT PROJECT\floor project\RUDRA _Mechanical

Project.rvt

Created: Friday, May 27, 2016 4:06:49 PM

Last Update:

Page 16: RUDRA 7 portfolio

CLASH DETECTION & SOLUTION

Clash in between

supply duct and cable

tray.

Clash is solved by

moving supply duct

Clash in between

column and supply duct.

Clash is solved by

moving supply duct

Page 17: RUDRA 7 portfolio

ANNOTATION Labels are created to annotate duct size, flow

rate and BOD

Diffusers are tagged with neck size and CFM

Page 18: RUDRA 7 portfolio

CREATING FAMILY (AHU)

Page 19: RUDRA 7 portfolio

A1 DRAFT SHEET

Page 20: RUDRA 7 portfolio

BILL OF QUANTITY

Page 21: RUDRA 7 portfolio

THANK YOU