![Page 1: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/1.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Photo Album Index: Construction Projects In Progress
• Brennan High School
• Briscoe Middle School (Alamo Ranch MS)
• Behlau (Laurel Mountain Ranch) Elementary
• Martin (Canterbury Farm) Elementary
• Henderson (Kallison Ranch) Elementary
Facilities Construction Vernon Dunagin, AIA
Assist. Superintendent of Facilities & Operations
Leroy San Miguel Executive Director of Facilities Construction
Ceasar Ponce, AIA
Director of Facilities Construction
Schools Under Construction for
N.I.S.D.
Martin Elementary - Front Entry Brennan High School - Front Entrance
• Meadow Village Elementary Addition
• Marshall High School Addition
• Clark High School
• Holmes High School Renovation
Additions & Renovations Projects
• Pease Middle School Addition
• John Glenn Elementary Addition
• Warren High School Addition
September 2009
![Page 2: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/2.jpg)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Brennan High School
Potranco West
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Bartlett-Cocke, Inc.
d. Construction Cost:
$89,204,855.00
e. Construction Completion:
January, 2008 thru May, 2010
f. Managing Principal:
Bill Reeves, AIA
Marmon Mok Architects
g. Project Architect:
Monty Howard, AIA
h. Scope of Services Performed:
2800 Student High School (81% complete – Site & Building)
Rendering of Front Entrance at Brennan High School
![Page 3: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/3.jpg)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (August 7, 2009)
![Page 4: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/4.jpg)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (August 7, 2009)
![Page 5: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/5.jpg)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (August 7, 2009)
![Page 6: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/6.jpg)
BRENNAN HIGH SCHOOL
![Page 7: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/7.jpg)
BRENNAN HIGH SCHOOL
![Page 8: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/8.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Briscoe Middle School
4265 Lone Star Parkway
San Antonio, TX 78253
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
CM@Risk: Bartlett-Cocke, Inc.
d. Construction Cost:
$40,798,213.00
e. Construction Completion:
August, 2008 thru May, 2010
f. Managing Principal:
Joel Hernandez, AIA
PBK Architects
g. Project Architect:
Raul Llanas, Assoc. AIA
h. Scope of Services Performed:
1200 Student Middle School (65% complete)
BRISCOE MIDDLE SCHOOL
Rendering of Front Entry at Briscoe Middle School
![Page 9: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/9.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
BRISCOE MIDDLE SCHOOL
Aerial of Briscoe Middle School (August 7, 2009)
![Page 10: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/10.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
BRISCOE MIDDLE SCHOOL
Aerial of Briscoe Middle School (August 7, 2009)
![Page 11: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/11.jpg)
BRISCOE MIDDLE SCHOOL
![Page 12: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/12.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Behlau Elementary
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Kunz Construction
d. Construction Cost:
$19,611,625.00
e. Construction Completion:November, 2008 thru May 1, 2010
f. Managing Principal:
Craig Noonan, AIA
Noonan Rittimann
g. Project Architect:
Craig Noonan, AIA
h. Scope of Services Performed:
800 Student Elementary School (48% complete)
BEHLAU ELEMENTARY
Rendering of Front Entry at Behlau Elementary School
![Page 13: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/13.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Behlau E.S. (August 29, 2009)
BEHLAU ELEMENTARY
![Page 14: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/14.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Behlau E.S. (August 29, 2009)
BEHLAU ELEMENTARY
![Page 15: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/15.jpg)
BEHLAU ELEMENTARY
![Page 16: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/16.jpg)
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Martin Elementary
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. James Berg, AIA Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Joeris General Contractors
d. Construction Cost:
$19,292,675.00
e. Construction Period:
December, 2008 thru May, 2010
f. Managing Principal:
Jerry Lammers, AIA
Alamo Architects
g. Project Architect:
Jerry Lammers, AIA
h. Scope of Services Performed:
New Elementary School - 660 Students (44% complete)
Rendering of Martin Elementary
![Page 17: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/17.jpg)
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Martin Elementary (August 19, 2009)
![Page 18: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/18.jpg)
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Martin Elementary (August 19, 2009)
![Page 19: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/19.jpg)
MARTIN ELEMENTARY
![Page 20: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/20.jpg)
HENDERSON ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Henderson Elementary
14605 Kallison Bend
San Antonio, TX 78254
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Thomas Curiel, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Bartlett-Cocke, Inc.
d. Construction Cost:
$19,923,497.00
e. Construction Period:
Janurary, 2009 thru May, 2010
f. Managing Principal:
Monty Howard, AIA
Marmon Mok
g. Project Architect:
Monty Howard, AIA
h. Scope of Services Performed:
800 Student Elementary School (55% complete)
Elevation Rendering of Front Entrance at Henderson Elementary
Elevation Rendering of Bus Drop and Cafeteria Entrance at Henderson Elementary
![Page 21: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/21.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Henderson Elementary August 19, 2009
HENDERSON ELEMENTARY
![Page 22: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/22.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Henderson Elementary August 19, 2009
HENDERSON ELEMENTARY
![Page 23: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/23.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendering of Site Plan at Henderson Elementary
HENDERSON ELEMENTARY
![Page 24: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/24.jpg)
HENDERSON ELEMENTARY
![Page 25: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/25.jpg)
HENDERSON ELEMENTARY
![Page 26: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/26.jpg)
Floor Plan - Rendering
PLANNORTH
MEADOW VILLAGE ELEMENTARY ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
f. Managing Principal:
Chris Kim, AIA
West East Design Group
g. Project Architect:
Jeffrey Rodriquez, AIA
h. Scope of Services Performed:
Ten Classroom Addititon, Mechanical Upgrades and New Student Restrooms (13% complete)
a. Name and Location of Building:
Meadow Village Elementary
Additions & Renovations
1406 Meadow Way
San Antonio, TX 78227
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Galaxy Builders
d. Construction Cost:
$3,146,000.00
e. Construction Period:
May, 2009 thru August, 2010
![Page 27: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/27.jpg)
MEADOW VILLAGE ELEMENTARY ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Axonmetric View of Meadow Village ES - Addition
![Page 28: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/28.jpg)
MEADOW VILLAGE ELEMENTARY
![Page 29: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/29.jpg)
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendering of Entry Elevation of New Auditorium
a. Name and Location of Building:
Marshall High School
8000 Lobo Lane
San Antonio, TX 78240
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
San Antonio, TX 78238-2220
(210) 397-1200
c. CM @ Risk Contractor:
Satterfield & Pontikes
d. Construction Budget:
$11,200,000.00
e. Construction Completion:
May, 2009 thru December, 2010
f. Managing Principal:
Joel Hernandez, AIA
PBK Architects
g. Project Architect:
Joel Hernandez, AIA
h. Scope of Services Performed:
(87% complete)
New Auditorium with Scene Shop, Drama Classroom, Choir Room and Practice Rooms, Gym AC, Roof Replacement, Campus Central Plant and Electrical Service Upgrades
Package I (Mech./Elect. Upgrades) - $1,943,050.00 (NTP Issued 4-29-09)
Package II (Demolition) - $192,527.00 (NTP Issued 5-19-2009)
Package III (Roofing) – $1,169,000.00(NTP Issued 5-19-2009)
Package IV (Foundation) – BIDS 6-2-09 $250,363.00
Package V (Building Package) – BIDS 7-7-09
Total - $3,554,940.00
![Page 30: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/30.jpg)
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Marshall High School (August 19, 2009)
![Page 31: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/31.jpg)
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Marshall High School (August 19, 2009)
![Page 32: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/32.jpg)
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendered Floor Plan of “New Auditorium” at Marshall High School
![Page 33: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/33.jpg)
MARSHALL HIGH SCHOOL
![Page 34: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/34.jpg)
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Clark High School
5150 DeZavala
San Antonio, TX 78249
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. CM@ Risk Contractor:
Bartlett Cocke
d. Construction Budget:
$12,191,688.00
e. Construction Completion:June, 2009 - August, 2010
f. Managing Principal:
Craig Noonan, AIA
Noonan Rittimann, LLC
g. Project Architect:
Craig Noonan, AIA
h. Scope of Services Performed:
(32% complete)
Ten Room Science Lab Addition, Gym AC, Central Plant Upgrade, Dressing Rooms and Infrastructure Upgrades.
Package I (Equipment) - $356,823.00 (NTP Issued March 26, 2009)
Package II (Athletics, Gym AC & Central Plant) - $3,618,638.00
Package III (Building Package) - $8,216,227.00
Total = $12,191,688.00
![Page 35: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/35.jpg)
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Site Plan of Additions/Renovations
![Page 36: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/36.jpg)
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition August 22, 2009
![Page 37: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/37.jpg)
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition August 22, 2009
![Page 38: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/38.jpg)
CLARK HIGH SCHOOL
![Page 39: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/39.jpg)
f. Managing Principal:
Craig Noonan, AIA
Noonan, Rittimann, LLC
g. Project Architect:
Craig Noonan, AIA
h. Scope of Services Performed:
Fourteen Room Science Lab Addition, Gym A/C, Central Plant Upgrade, Dressing Rooms and Infrastructure Upgrades.
Package I (Equipment) - $457,211.00 (NTP Issued March 26, 2009)
Package II (Athletics, Gym AC & Central Plant) - $2,959,392.00
Package III (Building Package) - $8,430,598.00 (Pending Board Approval)
Total - $11,847,201.00 (18% complete)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
a. Name and Location of Building:
Oliver Wendell Holmes High School
Additions & Renovations
6500 Ingram Road
San Antonio, TX 78238
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. CM@ Risk Contractor:
Bartlett Cocke
d. Construction Budget:
$11,847,201.00
e. Construction Period:
June, 2009 - August, 2010
![Page 40: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/40.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
Site Plan of Holmes High School
![Page 41: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/41.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of “New Classroom Addition August 22, 2009
![Page 42: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/42.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of “New Classroom Addition August 22, 2009
![Page 43: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/43.jpg)
OLIVER W. HOLMES HIGH SCHOOL
![Page 44: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/44.jpg)
OLIVER W. HOLMES HIGH SCHOOL
![Page 45: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/45.jpg)
PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Pease Middle School
201 Hunt Lane
San Antonio, TX 78245
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Thomas Curiel, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Joeris General Contractors
d. Construction Budget:
$11,647,505.00
e. Construction Period:
April, 2009 thru August, 2010
f. Managing Principal:
Jesse Garza, AIA
Garza Architecture, Inc.
g. Project Architect:
Jesse Garza, AIA
h. Scope of Services Performed:
Nineteen Classroom Addition (27% complete)
Package I (Site) - $2,014,895.00 (NTP Issued May 15, 2009)
Package II (Bldg. Package) - $9,632,610.00
Total = $11,647,505.00
Project Scope – 2 Story, Nineteen Classroom Addition with 9 Science Labs, 3 Computer Labs, 2 Art Labs and 5 General Classrooms, Gym AC, Site Parking, Admin. and Library Renovations.
Rendering of Northwest Elevation at Pease Middle School
![Page 46: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/46.jpg)
PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition August 1, 2009
![Page 47: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/47.jpg)
PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition August 1, 2009
![Page 48: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/48.jpg)
PEASE MIDDLE SCHOOL
![Page 49: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/49.jpg)
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
John Glenn Elementary
2385 Horal
San Antonio, TX 78227
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. CM@ Risk Contractor:
Guido Brothers Construction
d. Construction Cost:
$8,079,000.00
e. Construction Completion:June, 2009 - August, 2010
f. Managing Principal:
Mark Oppelt, AIA
O’Neil Conrad Oppelt
g. Project Architect:
Lowell Tacker, AIA
h. Scope of Services Performed:
Classroom Replacement (20 General Classroom’s, 2 Computer Labs and 4 Small Classroom’s)
Package I (Site & Central Plant) - $2,251,000.00 (NTP Issued April 20, 2009)
Package II (Building Package) - $5,828,000.00
Total - $8,079,000.00 (69% complete)
![Page 50: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/50.jpg)
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial at John Glenn ES (September 2009)
![Page 51: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/51.jpg)
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial at John Glenn ES (September 2009)
![Page 52: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/52.jpg)
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Site Plan of John Glenn ES - Addition
![Page 53: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/53.jpg)
JOHN GLENN ELEMENTARY
![Page 54: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/54.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Front Elevation - New Construction Careers Academy at Warren HS
WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS
a. Name and Location of Building:
Warren High School
Additions & Renovations
9411 Military Drive West
San Antonio, TX 78251
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Joeris General Contractor
d. Construction Budget:
$7,500,000.00
GMP BID Amount - $7,179,743.00
(Pending Board Approval)
e. Construction Period:June, 2009 - July, 2010
f. Managing Principal:
Roy Lewis, AIA
Garza Bomberger
g. Project Architect:
Roy Lewis, AIA
h. Scope of Services Performed:
New Construction Careers Academy that will include a Building Trades Shop, Plumbing/Pipefitting Trades Shop, HVAC Trades Shop, Electrical Trades Shop, Director’s Office, Boys and Girls Locker Rooms, 10 Classrooms, One Computer Lab, and a Large Instructional Room.
(9% complete)
![Page 55: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/55.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of New Careers Academy at Warren HS – September 3, 2009
![Page 56: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/56.jpg)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of New Careers Academy at Warren HS – September 3, 2009
![Page 57: Schools Under Construction for N.I.S.D.€¦ · Aerial at John Glenn ES (September 2009) JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION. NORTHSIDE INDEPENDENT SCHOOL DISTRICT. Aerial](https://reader035.vdocuments.net/reader035/viewer/2022063015/5fd332ca3d3aa10d493a56ae/html5/thumbnails/57.jpg)
WARREN HIGH SCHOOL