Saket BansalAgile Coach , iZenBridge
www.izenbridge.com 1
www.izenbridge.com 2
Cancel
Gift wrap
Return
Sprint30 Days
Return
Sprint goal
Sprint backlog Potentially shippableproduct increment
Productbacklog
CouponsGift wrap
Coupons
Cancel
24 hours
Scrum projects make progress in a series of “sprints”• Analogous to Extreme
Programming iterations Typical duration is a
calendar month at most Product is designed, coded,
and tested during the sprint
www.izenbridge.com 3
Sprint30 Days
www.izenbridge.com 4
www.izenbridge.com 5
Length of the release Amount of uncertainty How easy is to get feedbacks Stability of priorities The overhead of iterating Give a feeling of urgency
www.izenbridge.com 6
www.izenbridge.com 7
www.izenbridge.com 8
9
www.iZenBridge.com
Sprint
www.izenbridge.com 10
Goal shouldn’t be altered once
started
www.izenbridge.com 11
Product Backlog
Stories for this Sprint
Commits to not
altering
Commits to meeting the goal
www.izenbridge.com 12
www.izenbridge.com 13
Grooming Planning Doing Done
Cum
ula
tive Invest
ment
Only when sprint goal become completely invalid
Product Owner has the authority to cancel the sprint
Very Uncommon When terminated
◦ Scrum team perform a sprint retrospective.
◦ Plan the next sprint, with a different goal
www.izenbridge.com 14
Sprints are the skeleton of the Scrum framework
Sprints are timeboxed Sprints should be consistent in length No goal-altering changes in scope are
permitted During each sprint, a potentially shippable
product increment is completed
www.izenbridge.com 15
16
www.iZenBridge.com
Sprint
www.iZenBridge.com 17
QuizQuiz
A. Establishes a WIP Limit B. Forces Prioritization C. Demonstrates Progress D. Helps in controlling
technical debts
www.iZenBridge.com 18
A. Daily Scrum B. Sprint Review C. Release Planning D. Sprint Planning
www.iZenBridge.com 19
A. Increase the sprint length for remaining duration of the project
B. Increase the sprint length for some upcoming iterations
C. Retrospect on reasons and identify root cause of this problem
D. Extend the length of the sprint on case to case basis
www.iZenBridge.com 20
A. Sprint BacklogB. Product BacklogC. Sprint GoalD. Project Vision
www.iZenBridge.com 21
A. Quality Checklist B. Quality Matrices C. Definition of DoneD. Definition of Ready
www.iZenBridge.com 22
This Presentation includes extract from Mike Cohn’s Presentation www.mountaingoatsoftware.comIncludes Reference from Scrum Guide (www.scrum.org)
This Presentation includes extract from Mike Cohn’s Presentation www.mountaingoatsoftware.comIncludes Reference from Scrum Guide (www.scrum.org)
www.izenbridge.com 23
www.izenbridge.com 24
Online Training
Delhi
PMI-ACP
Simulation Test
Classroom Training
Hyderabad
Bangalore
15 - 16 June
1-2 June
18-19 May
www.iZenBridge.com 25
LinkedIn Community (PMI-ACP : Agile Certification Made Easy )
•http://www.linkedin.com/groups?gid=4673212
Facebook Page•http://www.facebook.com/izenbridge
Youtube channel •http://www.youtube.com/izenbridge
iZenBridge.com 26
Saket [email protected]: +91-9910802561Web: www.iZenBridge.comLinkedIn: www.linkedin.com/in/saketbansalTwitter: Saket_tg