Transcript

Bridge Removed per 14 Sep. `09 Council Meeting

From To

Enhance Pedestrian Connections

Commercial High Visibility Crosswalk 300 feet 10,500 10,500

Intersection Old Cutler Rd. SW 168 St. Install Pedestrian Countdown Type Heads 4 No. 3,500 3,500

Install Raised Sidewalk 60 feet 2,400 2,400

Chevron Markings 80 feet 2,800 2,800

Publix SW 148 St. SW 87 Pl. Passage to Shopping CenterTwo Directional 8' Shared Use Path 300 feet 10,000 10,000

SW 144 St. SW 87 Av. SW 82 Av. South Side 260 feet 10,400 10,400

SW 90 Av. SW 87 Av. South Side (North Side) 650, (240) feet 35,600 35,600

SW 160 St. SW 87 Av. SW 82 Av. South Side 300 feet 12,000 12,000

325, (360)

520, (430) feet 65,400 65,400

SW 164 St. Colonial Motors SW 92 Ct. North Side 750 feet 30,000 30,000

SW 168 St. SW 75 Av. Old Cutler Rd. South Side 1145 feet 45,800 45,800

SW 174 St. US-1 SW 89 Av. North Side 950 feet 38,000 38,000

SW 176 St. SW 94 Av. SW 87 Av. South Side (North Side) 2620, (1930) feet 182,000 182,000

SW 82 Av. Old Cutler Rd. North side 750 feet 30,000 30,000

SW 184 St. SW 95 Ct. SW 82 Av. North side 565 feet 22,600 22,600

SW 184 St. SW 82 Av. Old Cutler Rd. North side 2450 feet 98,000 98,000

SW 82 Av. SW 168 St. SW 170 Tr. Both Sides 140 feet 5,600 5,600

SW 89 Av. SW 174 St. SW 176 St. Both Sides 850 feet 34,000 34,000

SW 157 Tr. SW 162 St. West Side 1500 feet 60,000 60,000

Old Cutler Rd. SW 162 St. SW 166 St. West Side 1400 feet 56,000 56,000SW 168 St. SW 174 St. West Side 1930 feet 77,200 77,200

SW 152 St. US-1 SW 67 Av. Install 4' bike lanes 2.5 mile 1,080,000 1,080,000SW 82 Av. SW 136 St. SW 168 St. Install 4' bike lanes 2 mile 860,000 860,000

COMMERCIAL LOCAL CONN. SIDEWALKS COMMUTER ACCESS GREENWAYS TOTAL 2,771,800 1,313,000 1,458,800

Road / Site

Short Term Priority Projects

Recommended Improvements Quantity Unit Total

SW 82 Av. SW 77 Ct. South Side (North Side)

Segment / IntersectionVPB MDC

PBBPMPst BPMP-STn 1/15/2013

Top Related