![Page 1: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/1.jpg)
SIDDHARTA setup
Beam Pipe
side view
K+
K-
e+ φ e-
Kaon Trigger Set up
top view
![Page 2: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/2.jpg)
The SIDDHARTA Setup The SIDDHARTA Setup
![Page 3: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/3.jpg)
The SIDDHARTA Setup The SIDDHARTA Setup
![Page 4: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/4.jpg)
The Cryogenic Target Cell The Cryogenic Target Cell
APD 2-stage cryo coolerwith 8 watt @ 20K
Cryogenic target cell75 µm Kapton within a pure aluminum gridPmax. ~ 5 bar
![Page 5: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/5.jpg)
The Cryogenic Target Cell The Cryogenic Target Cell
![Page 6: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/6.jpg)
SDD SDD -- single unitsingle unit
![Page 7: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/7.jpg)
SDDSDD--subunit subunit
![Page 8: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/8.jpg)
SDDSDD--subunit subunit
![Page 9: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/9.jpg)
Target Cell and SDDTarget Cell and SDD--subunitsubunit
![Page 10: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/10.jpg)
SDD unit, containing 3 chips of 1 cm2 each
The SDDs for SiddhartaSDD status summer 2006:• design & production of SDDs is
complete and successful
• required amount of good chips
has been qualified
• chips ready for mounting
• tested samples are in specs
SIDDHARTA SDD detector modulewith 6 SDD 1cm2 chipsT = -60 °C, τ = 1 µsec
Spectroscopy - first tests on the SDD unit
![Page 11: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/11.jpg)
SDD ceramic layout
The SDDs for Siddharta - characterization
Spectroscopy testing of SDDsTo start by December 2005
SDD Optical inspection Spectroscopy test devicefor 4 SDD modules with a total detector area of 24 cm2
![Page 12: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/12.jpg)
Second run features:• 8 analog channels
• Charge amplifier• Shaper (3us, 1.5us, 750ns, 680ns)• Fast Shaper (unipolar, 300ns, 600ns)• BLH• Peak Stretcher• LT and HT triggers
• Digital section• Address• LT (real time)• Differential Analog MUX• Acknowledge
THE RUN II CHIP– ready, under testing
Front-end electronics status Charge Preamplifier configuration
Layout of Second Run
• First run, single analog channel: successful test in terms of resolution and timing-> some problems -> solved in the second run• Second run – built andunder testing
![Page 13: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/13.jpg)
Drawing of the 200 cm2 SDD setup for the measurement of exotic atoms X-ray transitions
Prototype Kaon triggersystem under testing at BTF - LNF
Trigger system and Setup
Results on BTF with the new PM (Hamamatsu R4998) and new scintillators(BC420) for KaonTrigger w.r.t Philips XP2020 and NE104
• Trigger system: -> new PMs and scintillator gave the expected improvement;-> fully tested at BTF – LNF-> expected performancesFinal trigger system: -> under construction
•The integration and test of all the subsystems will start in middle 2006Installation on DAΦNE will start in Spring 2007
![Page 14: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/14.jpg)
DADAΦΦNE at LNF NE at LNF
![Page 15: SIDDHARTA setup - Istituto Nazionale di Fisica Nucleare](https://reader033.vdocuments.net/reader033/viewer/2022051420/627e53cb88400241bc2402c4/html5/thumbnails/15.jpg)
DAΦNEDAΦNE