Page 1Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 1
SOGAT 2012The Shah Gas Development Project
A Lifecycle Approach to the HSEIA Process
Page 2Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 2
HSE Impact Assessment What is an HSEIA & Its Importance
• An HSEIA is systematic approach to evaluating the potential effect of a project on health, safety and the environment
• A living document that considers the full lifecycle of the project (FEED, EPC, Operations, Decommissioning & Abandonment)
• ADNOC Requires HSEIAs to be undertaken for all project phases
• Key function is to identify, assess, mitigate to ALARP and monitor on a continuous basis all material risk that can adversely impact health, safety, and environment
• Residual impacts and hazards managed by the operator’s HSE Management System (HSEMS)
Page 3Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 3
A Lifecycle Approach to the HSEIA ProcessIntroduction to the Approach
• A streamlined, risk-based and quality-focused methodology based on current industry best practice for HSE Case development
• A systematic and gated verification and review process that provides for the management of major accident hazards through the lifecycle of the Shah Gas Development (SGD) Programme
• Greater emphasis is placed on HSE Critical Equipment and Systems (HSECES) integrity that provides significant safety and efficiency benefits to the end user
• Developed in close cooperation with the ADNOC EHS Division
• Demonstrates the safe systems of work and organisation required to effectively identify, manage and maintain risks to a tolerable and As Low As Reasonably Practicable (ALARP) level
• Based on the detailed assessment of the proposed SGD activities and the outputs from HSEIA studies, management plans and procedures
Page 4Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 4
A Lifecycle Approach to the HSEIA ProcessHow it is Different from Traditional HSEIA Approaches
The Al Hosn Gas HSEIA approach is a departure from traditional HSEIAs process in the following ways:
• Process based method compared to the traditional prescriptive methodology of HSEIA report development
• Is overarching and not limited to providing a ‘snap-shot’ in time of HSE risk i.e. lifecycle philosophy
• Systematic and gated verification and review process provide tangible barriers from allowing the development to proceed to the next stage until a strategy to manage HSE risks to ALARP can be put in place
• Reduces unnecessary duplication of HSE studies/reviews; and
• Reduces the turnaround time for obtaining approvals from ADNOC EHS Division.
• Inter-linkages between quality management and procurement thus effectively integrating supply chain logistics in the lifecycle and improving operational efficiency
Page 5Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 5
A Lifecycle Approach to the HSEIA ProcessHow it is Different from Traditional HSEIA Approaches
The following slides contain diagrams and process flows for the following:
1. ADNOC HSEIA report process (slide 6)
2. Overview of the Al Hosn Gas lifecycle HSEIA approach developed for the Phase II SGD Programme – well operations and well testing (slide 7)
3. The 8 step elements of the Al Hosn Gas lifecycle HSEIA approach developed for the Phase II SGD Programme – well operations and well testing (slides 8 – 15)
Page 6Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 6
• Identify and assess material Risk• Mitigate risk to ALARP• Provide control measures and monitoring
A Lifecycle Approach to the HSEIA Process Traditional ADNOC HSEIA Report Components
ADNOC HSE Impact Assessment Report
Environmental Impact Statement
COMAH Report OHRA Report
Hazard & Effects Register For Risk categories:
People, Environment, Assets & Reputation
Manage medium/low risk through Operator’s HSE Management System
ADNOC and SPC as
regulator require HSEIA
for O&G Projects
Page 7Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 7
Drilling Operations
Procurement, Inspection &
Testing
Well Testing & Handover
HSE Critical Positions &
Tasks
Quality Management
Detailed Well & Well Test Design
& Engineering
Project Initiation &
Control
MAH & HSECES Identification
1
2
3
4 5
6
7
8
Al Hosn Gas Lifecycle HSEIA Approach SGD Phase II – Drilling, Well Testing & Cleanup Phase
Evergreen Process
Gates Review
Gates Review
Gates Review
Page 8Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 8
Change Control in Design
Robust Change Control procedures in place for review, approval & documentation of design changes. Change Management supported by an integrated (Company/Contractor) multi-discipline technical authority community (approved terms of reference)
Baseline Documentation
Design Codes, Standards and Guidelines established by Drilling Development Division for the Drilling Contractors.
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element Project Initiation &
Control1
1.1
1.2
Page 9Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 9
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element MAH & HSECES
Identification 2
HEMP StudiesHAZID/ENVID/OHRA etc., to identify Major Accident Hazards (MAHs) & Initial identification of HSECES. ISO17776 Standard for Hazard Reference Codes with additional hazards identified for Al Hosn Gas
Risk Registers Standard Hazards, Effects & Aspects Register format used by Company and Contractors
Bowtie Analysis
Developed via multi-discipline technical authority community workshops using BowTieXP. Company Bowtie Analysis Standard establishes unique hazard and barrier referencing system that will carry through from design to operations bowties
HSECES Identification
HSECES are identified and confirmed by discipline technical authorities during bowtie analysis workshops.Controlled HSECES Register
2.1
2.2
2.3
2.4
Page 10Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 10
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element HSE Critical
Positions & Tasks3
• HSE Critical Positions & Tasks identified for all HSECES for the Drilling & Well Testing Phase.
• Unique barrier referencing system facilitates efficient assurance activities i.e., barrier verification audits.
Page 11Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 11
Well & Well Test Design Execution plans and assignment of competent resources
Design Inputs & Outputs
Quality plans, codes/specs/standards and HSE criteriaDesign programs and calculation sheets
Well Design & Development
ReviewIntegrated multi-discipline design reviews conducted
HSE Embedded into Process
Specific safety studies and reviews in line with the HSE plans
Design & Development
ValidationIndependent Verification Process for HSECES
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element
Detailed Well & Well Test Design & Engineering
4
4.1
4.2
4.3
4.4
4.5
Page 12Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 12
Purchase Information
HSECES Design Performance Standards Operating Envelope Criteria
Verification of Purchased Products HSECES inspection and test plans
Independent Verification Process for HSECES
Inspection and testing plans prior to operationInspection & Testing
Verification of inspection reportsThird Party Inspection monitoringChange Control procedures
Inspection & Disposition Reports
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element Procurement,
Inspection & Testing5
5.1
5.2
5.3
5.4
Page 13Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 13
Testing Well Integrity Drilling logs.Cement quality and casing integrity testing.
Validation Processes Pre-mobilization audits of HSECES.Technical audits to check critical equipment.
Quality plansIdentification proceduresNon-conformance procedures
Identification & Traceability
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element Drilling Operations6
6.1
6.2
6.3
Page 14Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 14
Measurement Inspection, testing and examination against design performance standards
Non-conformance Non-conformance control procedureNon-conformance reports & follow up
Monthly quality reportsIndependent Verification Body (IVB) compliance reports
Analysis
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element Quality
Management7
7.1
7.2
7.3
Page 15Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 15
Stimulation & Cleanout & Testing
Air QualityFlaring Management Dispersion Modeling
Real time data monitoring – model verification
Operation Validation
Nitrogen purging of service linesPermit to work complianceWell start up procedureEndorsed well handover document
Handover
8.1
8.2
8.3
8.4
Defined Test Objectives – optimised well test programmeWell integrity assurance – standards verificationWellsite HSE management plan (BAT & ALARP principles)Management of change
Validation of testing contractors QA/QC via ADNOC standards & auditCompetence assurance
Well Testing & Handover8
SGD Phase II – Drilling, Well Testing & Cleanup Phase Element
Page 16Abu Dhabi Gas Development Company Ltd. CONFIDENTIAL Page 16
A Lifecycle Approach to the HSEIA ProcessThe Benefits
• The HSEIA approach provides tangible performance enhancement benefits in the following ways:
• A greater focus on MAHs and HSECES integrity thus significantly reducing the overall risk picture;
• Greater flexibility for managing HSEIA process associated with multi-package/multi-rig operations thus providing optimum efficiency
• Minimizing overall lifecycle costs through procurement of HSECES against approved performance standards i.e., QA/QC of HSECES from day one
• Reduction of turnaround in ADNOC/SPC approval process i.e., SGD Program HSEIA Phase II approvals have been achieved approximately 14 days from submittal
• The approach is fully integrated with ADNOC & COMPANY HSEMS
• The iterative and evergreen nature of the approach provides the opportunity for continuous improvement