Download - (SP06) ORDINARY BAR. SECOND FLOOR.xls
-
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
1/12
Date 28-11-2007 Project # Sheet # 12 of 12Project:
Site/TypeBuilding Checked By Approved By
S18 37 6.2 165.168 275.28 1
S01 0.15 94 14.1 28.764 1S02 0.15 94 14.1 28.764 1S13 0.15 94 14.1 28.764 1S14 0.15 94 14.1 28.764 1S15 0.15 57 8.55 17.442 1
S17 0.15 57 8.55 17.442 1
[HZ] WATT RPM DIAMETER (mm) FIXING A. (mm*mm) AIR VOLUME CMH50 16 1950 160 224X224 226
VELOCITY (m/s) (mm H 2O) or (Pa) m 3 /h QTY
1.5 1.00 or 9.80 1400 2
FV-15WH1 (05)FV-15WH1 (05)
FV-15WH1 (05)
ORDINARY BAR DOOR TYPE 0.5X0.6
STORAGE
FV-15WH1 (05) 1.4
CALCUL ATION FOR DOOR LOUVER SIZE
LOCATION MODEL OF LOUVER EFFECTIVE AREA (m2)
FV-15WH1 (05)
DETAILS FOR MODELMODEL WIEGHT (Kg)
ORDINARY BAR. FV-15WH1 (05)
LOCATION ROOM NO.AIR CHANGE RATE
CFM/SFAREA(SF)
AIR CHANGEVOLUME(F 3)/M
TOTAL AIRVOLUME(m 3)/H
QTY MODEL OF EXHAUST FAN
Exhaust fan and Louvers Calculation Sheet
CALCUL ATION FOR EXHAUST FAN
LOCATION ROOM NO.Ventilation for
washing CMH/m2Area (m2)
TOTAL AIR VOLUMECFM
TOTAL AIRVOLUME(m 3)/H
QTY MODEL OF EXHAUST FAN
FV-15WH1 (05)FV-15WH1 (05)
STANDBY POLICE BATTALION HQLASHKARGAH
Designed ByORDINARYBAR.(SP06)
AB.WALI M.E.AMIRYAR MAZIN SADIQ
United Infrastructure Pro ects
73 of 182
-
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
2/12
Date 28-11-2007 Project # . Sheet # 11 of 12Project:
Site/TypeBuilding Checked By Approved By
103.2 34.4 299.9 33.3 299.9 33.3 299.9 33.3 2102 34 299.9 33.3 299.9 33.3 299.9 33.3 299.9 33.3 2
103.2 34.4 215.9 5.3 1
PHAZE WATT HEIGHT (mm) VOLT CMH RPM WEIGHT (Kg)
1 65 . 220 9300 420 ..1 85 . 220 16200 290 ..
S11 1400 S10 1400
S08 1400 S09 1400
S06 1400 S07 1400
S04 1400 S05 1400
. 1400
Ceiling Fan Details
MODEL BLADE (mm)
. 900
S16 900
ORDINARYBAR..(SP06-07-08-
09)
S03 1400
S12 1400
Ceil ing fan Calculation
LOCATION ROOM NO. V .(m 3) AREA (m 2) QTY BLADE (mm) MODEL OF CEILNG FAN
STANDBY POLICE BATTALION HQLASHKARGAH
Designed By
ORDINARYBAR.(SP06)
AB.WALI M.E.AMIRYAR MAZIN SADIQ
Ceiling fan Calculation Sheet
United Infrastructure Pro ects United Infrastructure Pro ects
72 of 182
-
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
3/12
Date 28-11-2007 Project # Sheet # 10 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 34.4 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.322410621NE 5.9 1 0 0.0 0.0 Diesel 45 4.51451776East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.54355328SE 5.9 1 0 0.0 0.0 Coal 20 10.15766496
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.762098133SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 11 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 11 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 34.4 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 103.2 13 0.6Summer 0.00 103.2 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.4
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.4
Net TotalCooling KW 0.0Heating KW 2.4
406305113
MAZIN SADIQ
Required quantity for 30days (kg)
130135
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06)S12
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
71 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
4/12
Date 28-11-2007 Project # Sheet # 9 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.232443251NE 5.9 1 0 0.0 0.0 Diesel 45 4.42055184East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.26165552SE 5.9 1 0 0.0 0.0 Coal 20 9.94624164
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.6837932SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 10.6 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
398298111
MAZIN SADIQ
Required quantity for 30days (kg)
127133
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06)S11
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
70 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
5/12
Date 28-11-2007 Project # Sheet # 8 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.232443251NE 5.9 1 0 0.0 0.0 Diesel 45 4.42055184East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.26165552SE 5.9 1 0 0.0 0.0 Coal 20 9.94624164
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.6837932SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 10.6 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
398298111
MAZIN SADIQ
Required quantity for 30days (kg)
127133
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S10
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
69 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
6/12
Date 28-11-2007 Project # Sheet # 7 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.232443251NE 5.9 1 0 0.0 0.0 Diesel 45 4.42055184East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.26165552SE 5.9 1 0 0.0 0.0 Coal 20 9.94624164
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.6837932SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 10.6 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
398298111
MAZIN SADIQ
Required quantity for 30days (kg)
127133
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S09
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
68 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
7/12
Date 28-11-2007 Project # Sheet # 6 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 3.669600562NE 5.9 1 0 0.0 0.0 Diesel 45 3.83269392East 5.9 1 0 1.44 0.0 0.2 Wood 15 11.49808176SE 5.9 1 0 0.0 0.0 Coal 20 8.62356132
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.1939116SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 6.5 0.0 0.1SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.0
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.0
Net TotalCooling KW 0.0Heating KW 2.0
34525996
MAZIN SADIQ
Required quantity for 30days (kg)
110115
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S08
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
67 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
8/12
Date 28-11-2007 Project # Sheet # 5 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 34 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.300818587NE 5.9 1 0 0.0 0.0 Diesel 45 4.49196608East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.47589824SE 5.9 1 0 0.0 0.0 Coal 20 10.10692368
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.743305067SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 11 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 11 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 34 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 102 13 0.6Summer 0.00 102 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
404303112
MAZIN SADIQ
Required quantity for 30days (kg)
129135
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S07
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
66 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
9/12
Date 28-11-2007 Project # Sheet # 4 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.232443251NE 5.9 1 0 0.0 0.0 Diesel 45 4.42055184East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.26165552SE 5.9 1 0 0.0 0.0 Coal 20 9.94624164
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.6837932SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 10.6 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
398298111
MAZIN SADIQ
Required quantity for 30days (kg)
127133
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S06
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
65 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
10/12
Date 28-11-2007 Project # Sheet # 3 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.232443251NE 5.9 1 0 0.0 0.0 Diesel 45 4.42055184East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.26165552SE 5.9 1 0 0.0 0.0 Coal 20 9.94624164
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.6837932SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 10.6 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
398298111
MAZIN SADIQ
Required quantity for 30days (kg)
127133
Heat Loss Calculation Sheet
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S05
AB.WALI M.E.AMIRYAR
United InfrastructurePro ects
64 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
11/12
Date 28-11-2007 Project # Sheet # 2 of 12Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals HandbookTemperaturesWinter outdoor dodb -5 C Floor Area A.flr. 33.3 sq.metersWinter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)Summer indoor do 23.9 CDaily Range DR 18.3 CSens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of CombustionMJ/kg
Required quantity for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 4.232443251NE 5.9 1 0 0.0 0.0 Diesel 45 4.42055184East 5.9 1 0 2.88 0.0 0.4 Wood 15 13.26165552SE 5.9 1 0 0.0 0.0 Coal 20 9.94624164
South 5.9 1 0 0.0 0.0 Natural Gas 54 3.6837932SW 5.9 1 0 0.0 0.0West 5.9 1 0 2.88 0.0 0.4NW 5.9 1 0 0.0 0.0Horz. 5.9 1 0 0.0 0.0Walls U CLTD (5)North 0.8 0 0.0 0.0NE 0.8 0 0.0 0.0East 0.8 0 10.6 0.0 0.2SE 0.8 0 0.0 0.0South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0West 0.8 0 10.6 0.0 0.2NW 0.8 0 0.0 0.0Doors U CLTD (5)North 3.3 0 0.0 0.0NE 3.3 0 0.0 0.0East 3.3 0 0.0 0.0SE 3.3 0 0.0 0.0South 3.3 0 0.0 0.0SW 3.3 0 0.0 0.0West 3.3 0 0.0 0.0NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 33.3 0.0 0.4Roof 2 0.45 0.0 0.0Partition U CLTD (5)(To Unc. Space) 0 0.0 0.0Crawl Space U CLTD (5)(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter 0.83 0.0
Infiltration ACH Vol QWinter 0.47 99.9 13 0.6Summer 0.00 99.9 0 0.0People Number Watt /peson
67 0Internal (AVG) KW WattsKitchen/Laundry 0 0.0Other (in watts) 0 0.0
SensibleCool Subtotal KW 0.0Heat Subtotal KW 2.3
Cl.Fac Ht.FacDuct 0 0 0.0 0.0
SensibleCool Total KW 0.0Heat Total KW 2.3
Net TotalCooling KW 0.0Heating KW 2.3
..STANDBY POLICE BATTALION HQ
LASHKARGAHDesigned By Checked By
ORDINARYBAR.(SP06) S04
AB.WALI M.E.AMIRYAR
398298111
MAZIN SADIQ
Required quantity for 30days (kg)
127133
Heat Loss Calculation Sheet
United InfrastructurePro ects
63 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP06) ORDINARY BAR. SECOND FLOOR.xls
12/12