Sprint Resource Pages
• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+106+Progress+Summary
• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+107+Progress+Summary
• For information on the CONNECT 4.1 release visit: https://developer.connectopensource.org/x/q4CrBw
2
![Page 3: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/3.jpg)
Sprint 106 Summary - Cumulative Flow
3
To Do
In Progress
QA
Done
![Page 4: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/4.jpg)
Sprint 106 Summary - Burndown Chart
4
![Page 5: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/5.jpg)
Sprint 106 Summary –Sprint Stats
• Points committed = 13.5– Initial points committed – 11
– 4 tickets added for 2.5 points of effort, totaling 13.5 points for sprint
• Tickets committed to sprint = 16
• Tickets completed = 15
• Points remaining (unclosed) at end of sprint = 0.5
• Points completed in sprint (velocity) = 13.0
5
![Page 6: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/6.jpg)
Sprint 106 – Themes & Tasks
•4.2 Release– CMS-OFM 4.0 install on WAS 7 JDK 1.6 testing
– Design for Document Query specification version identification
• CONN-46 & CONN-15
•Participation in the Healtheway Certification pilot
•Partner and Community Support
6
![Page 7: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/7.jpg)
Sprint 106 - What We are Showing Today
• CONNECT 4.2 Support adopters/federal partners that want to use
CONNECT with Java 6 (Feature request – CONN-350)
– CONN-383 – Test CONNECT on Solaris with WL 11g with Java JDK 1.6
– CONN-384 – Test CONNECT on RedHat Linux with WL 11g with Java JDK 1.6
– CONN-371 – Validate that CONNECT can be successfully installed in Java 1.7/WL 12c implementation environment
– CONN-370 – Validate that CONNECT can be successfully installed in IBM Java 1.7/WAS 8.5 implementation environment
7
![Page 8: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/8.jpg)
Sprint 106 - What We are Showing Today
• CONNECT 4.2 - Continued Support adopters/federal partners that want to use
CONNECT with Java 6 (Feature request – CONN-350)
– CONN-368 – Validate that CONNECT can be successfully installed in Java 1.7/JBoss 7.1.1 implementation environment
– CONN-369 – Validate that CONNECT can be successfully installed on Java 1.7/GlassFish 3.1.2 implementation environment
– CONN-375 – Document design or implementation notes on wiki for supporting Java 1.6 environment
Demo
• https://developer.connectopensource.org/display/CONNECTWIKI/Supporting+Java+version+6
8
![Page 9: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/9.jpg)
Sprint 106 - What We are Showing Today
• CONNECT 4.2 Provide adopters that support both versions of the specifications
(QD and RD) the service version of the message so that adapters can validate/further process the request and generate the version specific response (Feature request – CONN 46 & 15)
– Held responding design approach review on April 29th
– Link to responding design approach- https://developer.connectopensource.org/x/kYDvBw
– CONN-296 – Research design options to instruct the initiating gateway which specification version/endpoint to target for a QD or RD service
– Link to initiating design approach-
https://developer.connectopensource.org/x/GoA0C
9
![Page 10: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/10.jpg)
Sprint 106 - What We are Showing Today
• Participation in the HealtheWay pilot– CONN-317 – Pre-test setup for pilot testing
– CONN-400 – Pilot Test: Add country code to PD response
– CONN-401 – Pilot Test: CONNECT throws exception if empty RelatesTo element is present in QD request
– CONN-402 – Empty relatesToList value on the Entity interfaces results in an empty but existent wsa:RelatesTo header
Demo
https://developer.connectopensource.org/display/CONNECTWIKI/Table+1+-+Test+Cases+%
28subset%29
10
![Page 11: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/11.jpg)
Sprint 106 - What We are Showing TodayCustodial Agent and Community Support
• Community and Federal Partner Support– CONN-382 & 404 – Validate that CONNECT populates the
SMTP headers(SMTP TO and RCPT FROM) from the XDR metadata during SOAP to SMTP
– CONN-389 – Direct failing in JBoss 7.1.1 --Caused by: java.lang.SecurityException
• Custodial Agent Duties
11
![Page 12: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/12.jpg)
Sprint 107 - Proposed Themes
• Continued Testing for Java 6 & Java 7 Support
– Testing on WebSphere 7
• Multi-Specification Identification for QD/RD (Initiating)
– Review initiating design approach with technical leads from Federal Partners (conference call)
– Begin development
• Run Healtheway certification pilot test cases for a vendor gateway
– Continue working on the updated list of Pilot test cases
https://developer.connectopensource.org/display/CONNECTWIKI/Table+1+-+Test+Cases+%28subset%29
– Pilot extended to May 31
12
![Page 13: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/13.jpg)
Sprint 107 – Other tasks
• Prepare for the May 21st CONNECT User Group Meeting
• Other tasks–Partner and Community Support
–Ongoing Custodial Agent Duties
• Product Backlog
https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140
13
![Page 14: Sprint 106 Review / Sprint 107 Planning May 06, 2013](https://reader036.vdocuments.net/reader036/viewer/2022062421/56649f465503460f94c6885b/html5/thumbnails/14.jpg)
CONNECT 4.0Community Announcements
• CONNECT Awareness
– Open sprint review and planning meetings Next sprint meeting will be May 20th
– CONNECT 4.0 Blogs and Forum posts– http://www.connectopensource.org/developer-resources/forums
– CONNECT User Group meeting May 21st
– Call for participation and abstracts underway