Page 1: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 1

1

STAKEHOLDER WORKSHOP

PWTC

19th October 2011

POWER QUALITY BASELINE STUDY FOR

PENINSULAR MALAYSIA

by

DATARAN BERLIAN SDN BHD

Presentation Outline

• Introduction

• Structure of RESMOS

• Features of RESMOS

• RESMOS data file

2

Page 2: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 2

© 2003 - Dataran Berlian Sdn Bhd

A compact industrial standard computer control A TURE multi-channel Data

Logging System designed to operate in a harsh environment area which works

like a paperless recorder, storing data in memory at a rate and over a length of

time you specify for Power Industries.

Introduction

3

© 2003 - Dataran Berlian Sdn Bhd

Research Collaboration with..

� Professor Khalid Mohamed Nor

� B.Eng.(L’pool), M.Sc, P.Hd(UMIST), SMIEEE

� Power system expert

� Provide consultancy & supervisions on development of RESMOS

� UM Electrical Engineering

� Provide staff, test tools & facilities.

� Consultancy on international Standards Compliance to IEC 51000

series.

� UTM Electrical Engineering

� Provide staff, test tools & facilities.

4

Page 3: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 3

© 2003 - Dataran Berlian Sdn Bhd

FLOW STRUCTURE RESMOS

MASTER PORTABLE UNIT3 PHASE VOLTAGE

INCOMING CURRENT

FEEDER

R Y B N R Y B N R Y B N

R Y B N E

OUTGOING CURRENT

FEEDERS

RESMOS

ELECTRICAL SUBSTATION

LOCAL AREA NETWORK ( LAN)

TWO WAY

COMMUNICATION

RESMOS COMMUNICATOR

2 channels

8 channels

RESMOS

Current input signal (10 R,Y,B,N) individual channel

Full duplex

5

© 2003 - Dataran Berlian Sdn Bhd

FEATURES

• Fully PC/AT compatible and computerized system control

• All weather operations

• Operating Temperature up to 55˚C

• Self-powered

• Portability- Compact all-in-one design for easy transportation and handling

• Simultaneous Data Capturing up to 10 individual Cables (RYBN)

• Harmonic measuring capabilities including it’s Neutral up to 21st level for

both individual and THD

• In cooperated with Surge Protection capability

6

Page 4: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 4

© 2003 - Dataran Berlian Sdn Bhd

CALIBRATION

HC 6030

CT-1700

7

© 2003 - Dataran Berlian Sdn Bhd

MS IEC 60950-1:2003 & IEC 60950-1:2001

Complied with the safety

requirements conducted

according to standard

MS IEC 60950-1:2003 and IEC

60950-1:2001.

8

Page 5: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 5

© 2003 - Dataran Berlian Sdn Bhd

IP 54

IP-International Protection

5-Full protection against

contact. Protection against

interior injurious dust

deposits

4-Protection against splashed

water from all directions

9

© 2003 - Dataran Berlian Sdn Bhd

Patented 2002

10

Page 6: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 6

© 2003 - Dataran Berlian Sdn Bhd

CURRENT PROBES

Range (A) Application Output to

input ratio

Frequency

range

Manufacturer

4 - 600 Outgoing

feeders

1mA AC/ A

AC

48Hz-1 kHz CHAUVIN

ARNOUX

100 mA -

1000

Incoming

feeders

1mA AC/ A

AC

30 Hz-5

kHz

CHAUVIN

ARNOUX

100 mA -

3600

Incoming

feeders

1mA AC/ A

AC

30 Hz-5

kHz

CHAUVIN

ARNOUX

11

© 2003 - Dataran Berlian Sdn Bhd

P/E

Indoor

12

Page 7: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 7

© 2003 - Dataran Berlian Sdn Bhd

F/P

CompactFeeder pillar

13

© 2003 - Dataran Berlian Sdn Bhd

H POLE

14

Page 8: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 8

© 2003 - Dataran Berlian Sdn Bhd

INSTALLATION

Main switch board

15

© 2003 - Dataran Berlian Sdn Bhd

INSTALLATION

16

Page 9: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 9

© 2003 - Dataran Berlian Sdn Bhd

HARMONICFILES

-csv format database:-

1. Fundamental data

(V,I, true PF)

1. 10 individual current harmonic

percentage (R,Y,B,N) up to 21st

level & its THD value

2. Voltage harmonic percentage

(RN,YN,BN) up to 21st level &

its THD for both single phase &

three phase

17

© 2003 - Dataran Berlian Sdn Bhd

Fundamental data file

18

Page 10: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 10

© 2003 - Dataran Berlian Sdn Bhd

Current harmonic file

19

© 2003 - Dataran Berlian Sdn Bhd

Current THD file

20

Page 11: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 11

© 2003 - Dataran Berlian Sdn Bhd

Voltage harmonic

21

© 2003 - Dataran Berlian Sdn Bhd

Voltage THD

22

Page 12: STAKEHOLDER WORKSHOP PWTC 19 October 2011 ......PQ Stakeholder Workshop 2011 1 1 STAKEHOLDER WORKSHOP PWTC 19 th October 2011 POWER QUALITY BASELINE STUDY FOR PENINSULAR MALAYSIA by

PQ Stakeholder Workshop 2011 12

© 2003 - Dataran Berlian Sdn Bhd

THANK YOU

23


Top Related