Study combines Cong. Boustany Recon with LCA Chenier Plain Effort
Cost Share Agreement signed in Jan. 2009
Scoping meetings held in Mar. 2009 Feasibility Scoping Meeting – June
2010
Study GOAL = a Comprehensive Restoration and Protection Plan for Southwest Coastal LA
![Page 4: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/4.jpg)
We continue to refine the vision of the State Master Plan for Southwest Louisiana
Measure screening and evaluation is underway
Ecosystem benefits and Engineering cost for measures are being developed
H&H Modeling is underway
The Project Delivery Team meets weekly
![Page 5: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/5.jpg)
![Page 6: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/6.jpg)
Measure types under consideration include: Shoreline stabilization Unique natural features restoration Marsh creation/restoration Hurricane risk reduction Hydrologic and salinity control
The study team will combine the best performing and cost effective restoration and risk reduction measures into alternatives
![Page 7: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/7.jpg)
![Page 8: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/8.jpg)
![Page 9: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/9.jpg)
![Page 10: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/10.jpg)
![Page 11: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/11.jpg)
![Page 12: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/12.jpg)
![Page 13: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/13.jpg)
Feasibility report guidance is more risk adverse than at study initiation Review plan changes Sea level rise requirements
Project Management Plan may be revised once H&H modeling is complete
President’s Budget for FY 2011 does not include funds for Southwest Coastal
![Page 14: STATUS UPDATE FOR CPRA January 26, 2011. Study combines Cong. Boustany Recon with LCA Chenier Plain Effort Cost Share Agreement signed in Jan. 2009](https://reader036.vdocuments.net/reader036/viewer/2022062519/5697bfbc1a28abf838ca16fc/html5/thumbnails/14.jpg)
SCHEDULE
Tentatively Selected Plan – Oct 2011
Alternative Formulation Briefing – June 2012
Draft Feasibility Report – Sept 2012
The Report will be actionable: a quality authorization document