RE & RTO Seminar cum Awards Night
Supervision of Foundation Works
Chua Tong Seng14th December 2011
1
![Page 2: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/2.jpg)
Teamwork: QP-RE-RTO
2
DTL
MCEKPE
KPE-C424KPE-C423LTA
![Page 3: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/3.jpg)
Understanding Soil Condition
DSTA,2009
3
![Page 4: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/4.jpg)
Bukit Timah Granite Formation
4
Bkt Timah
Granite
![Page 5: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/5.jpg)
Kallang FormationMarine Clay
UMC
LMC
Dr.Poh, TY
5
UMC
LMC
6000 years ago
![Page 6: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/6.jpg)
E , F1 and F2
Fluvial Clay, F2
Estuarine Deposit, E
Estuarine Deposit, E
6
Fluvial Sand, F1
![Page 7: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/7.jpg)
Old Alluvium Formation
K.W.Lee,2010
7
Sandy CLAY
Clayey SAND
![Page 8: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/8.jpg)
Jurong Formation
Syncline
JF@Buona Vista
Geological Time, Kimura, 2011
8
![Page 9: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/9.jpg)
Limestone Formation
Jeyatharan et al, 2003
Vietnam,Yashuda, 2011
9
?
![Page 10: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/10.jpg)
Fort Canning Boulder Bed, FCBB
Shirlaw et al, 2003
10
LONGITUDINAL SECTION
![Page 11: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/11.jpg)
Types of Foundation
11
![Page 12: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/12.jpg)
Classification of Piles
End Bearing and Friction Piles Replacement,
Displacement or Low-displacement?
12
![Page 13: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/13.jpg)
Bored Piles in Singapore
GBH
13
![Page 14: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/14.jpg)
Sequence of Construction
14
B
![Page 15: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/15.jpg)
Keep Accurate Installation Records
• Soil Description
• Dry hole or tremie concreting
• Stabilisation method
• Length of temporary steel casing
• Duration of drilling
• Record of anomaly, like hole
collapse
• Pile concreting record
15
![Page 16: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/16.jpg)
Collection of Representative Samples
Collection of samples for various depths and different soil/rock layers Which sample do you choose?
16
![Page 17: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/17.jpg)
Construction Problems
17
Chua, 1999
![Page 18: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/18.jpg)
Stabilising Fluids
Bentonite suspension
Polymer suspension
18
Marsh Funnel
Mud Balance
![Page 19: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/19.jpg)
Construction tolerance: VerticalityCaliper Logging (Koden)
• Singapore Standard
CP4:2003, Code of
Practice for
Foundations
1:75
Kelly Bar
Loadtest,2011
Bauer,2011
19
![Page 20: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/20.jpg)
Eccentricity
20
Where is the centre of pile ?
75mm
![Page 21: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/21.jpg)
Time-Lag before Concreting
CP4:2003 Code of Practice for Foundation
• The time interval between completion of the
formation of the borehole and commencement
of concreting should be minimised as ground
will deteriorate with time
21
![Page 22: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/22.jpg)
Checking Base of Pile
LCH,2011
22
![Page 23: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/23.jpg)
Imperfection: Soft Toe of Pile
23
![Page 24: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/24.jpg)
Type of Rock at Founding Depth
24
![Page 25: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/25.jpg)
Slake Tests
Case 1 Case 2
25
![Page 26: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/26.jpg)
Reinforcements of Bored Pile
CP4: 2003, Foundations
• CP4: compression min main
reinforcement 0.5% of Ac
and not less than 10m long
below pile cut-off level
• For tension , full cage
• For pile within excavation,
reinforcement should be
adequately provided for
bending moment.
BS EN 1536:2000, Bored Piles
• Piles should be reinforced
over any length through
soft or loose soil
26
![Page 27: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/27.jpg)
Barrette Piles
BS EN 1536:2000
Dr. Yet,N.S., 2010
27
![Page 28: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/28.jpg)
Driven Piles
Pile Driver Pile Segments
28
![Page 29: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/29.jpg)
Common Problems with Driven Piles
Piles shorter than design
• Driving energy less than
required i.e. low hammer
efficiency or soft cushion
• Soil strength higher than
anticipated
Piles longer than design
• Driving energy higher than required
• Soil resistance lower than anticipated
• Additional piles to compensate weaker soil i.e. due higher negative skin friction, nsf ?
• Overstressing, yielding of piles?
29
![Page 30: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/30.jpg)
Overstressing of Steel Piles
30
HKFellinius, 1986
![Page 31: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/31.jpg)
Type of Pile Load Test
Ultimate Load Test
• Verification of design
• Conducted to 2.5 to 3.0
times working load, or
failure
• Instrumented to determine
skin friction and end
bearing
Working Load Test
• Quality control test for
assessment of workmanship
• Tested to 1.5 to 2.0 times
working load
• Randomly chosen from
among working piles, not
pre-selected
31
(Dr. Yet NS, 2011)
![Page 32: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/32.jpg)
BCA/IES/ACES Advisory Note 1/03 on
Load Tests and Schedule
32
![Page 33: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/33.jpg)
Method of Pile Load Tests
Kentledge Method O-Cell
33
Foo HK,2011
![Page 34: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/34.jpg)
Dynamic Pile Testing
High Strain Pile Dynamic Test, PDA Statnamic Test
34
![Page 35: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/35.jpg)
Pile Intergrity Testing
Cross-hole Sonic Logging Low Strain Hammer Test
35
![Page 36: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/36.jpg)
Guidelines for Pile Load Test using Kentledge
• Key points
� Design by PE
� Kentledge weight at least 110% of max test load
� Supervise by PE and QSS
� Design to Codes and prepare Drawings to communicate design intent
� Construction to follow design Drawings
� Instrumentation and monitor stability
� All to observe WSHA
36
![Page 37: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/37.jpg)
Workplace Safety & Health Act, WSHA
• An ACT relating to safety, health and welfare of persons at work in workplaces
• WSH(Construction) Regulations 2007
– Piling works
– Reg. 129 Stability of adjacent structures
– Reg. 130 Inspection
– Reg. 131 Pile driver not in use
– Reg. 132 Pile testing
– Reg. 133 Footing
Lim Shiyi, 2011
37
![Page 38: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/38.jpg)
Source of Specification
• Projects Technical Specification
• Code of Practice SS CP4:2003 Foundation
• Code of Practice SS515:2005 Supervision of Structural Works
• Code of Practice BS EN– BS EN 1536:2000 Execution of special geotechnical works –
Bored piles
– BS EN 12699:2000 Execution of special geotechnical works –Displacement piles
– BS EN 14199:2000 Execution of special geotechnical works –Micropiles
38
![Page 39: Supervision of piling works, ACES, 2011, Singapore](https://reader033.vdocuments.net/reader033/viewer/2022050710/5877b6191a28ab2c668b5a21/html5/thumbnails/39.jpg)
Conclusion
• Good for QP-RE-RTO to cultivate goodcommunication links. QP to disseminate keydesign requirements and RE-RTO to feedback onsite observations i.e. unexpected soil condition atthe site
• RE-RTO contributions are very important
• All should be familiar with relevant Codes
• Works as a Team. If there is any incident, the lineof responsibility will become irrelevant as allmembers in the team will be affected in one wayor another.