Download - Tagore Theater case study
![Page 1: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/1.jpg)
![Page 2: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/2.jpg)
Location
![Page 3: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/3.jpg)
Location
![Page 4: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/4.jpg)
Location
![Page 5: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/5.jpg)
Location
![Page 6: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/6.jpg)
V2 RoadV3 RoadApproach
To Sector 17
![Page 7: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/7.jpg)
Sun path
![Page 8: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/8.jpg)
South West
Winter Wind Direction
![Page 9: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/9.jpg)
North East
Summer Wind Direction
![Page 10: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/10.jpg)
Amenities(School)Commercial
Main SiteResidential
Open Spaces
![Page 11: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/11.jpg)
Main EntranceService Entrance
![Page 12: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/12.jpg)
Parking Area
![Page 13: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/13.jpg)
Entrance for performers
Entrance forspectators
Backstage
Underground Rehearsal Hall
Typical Model
![Page 14: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/14.jpg)
WoodGlass
ConcreteBlack Marble
Bricks
Exterior Materials
Concrete Tiles
![Page 15: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/15.jpg)
MAIN ENTRANCEMAIN ENTRANCE IS A GLASS CHAMBER SUPPORTED WITH STEEL BEAMS COVEREDWITH WOODEN PLATES AND COLUMNS, IT HAS TWO MAIN ENTRANCES WITH 7’10” HEIGHT AND 6’2” WIDE THE AREA OF THE GLASS CHAMBER IS 900 SQ FT. APPROX, THE CHMABER IS ON BOTH SIDES OF THE AUDITORIUM BUT THE CHMABER TOWARDS THE MAIN ENTRANCE IS FUNCTIONAL.
INTERIORS
![Page 16: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/16.jpg)
THE STRUCTURE OF THE CHAMBER IS FABRICATION.THE STRUCTURE ALLOWS THE NATURAL LIGHTNING
AND GIVES NATURALNESS AND PRESENTSCORBUSIER’S PHILOSPHY OF MATERIAL EXPOSURE.
![Page 17: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/17.jpg)
![Page 18: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/18.jpg)
TYPICAL PLAN
![Page 19: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/19.jpg)
interiors
![Page 20: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/20.jpg)
Spectator’s area Total seating area
801. No. of public
entrances 6. Private entrances
2.
![Page 21: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/21.jpg)
Chair
![Page 22: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/22.jpg)
Backstage
13’
Stage Entrance
![Page 23: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/23.jpg)
Stage• Stage has an
area of 12mx15m.• The height of
the stage is 2’.• The angle of
view from center of stage is 90 degrees.• Wooden flooring
is used.• Distance
between stage and front row is 3’.
![Page 24: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/24.jpg)
ceilingThe ceiling used for reducing reverberation time, it provides important performance attributes such as light reflectants, fire resistance and easy accessibility to building systems.
![Page 25: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/25.jpg)
ceiling
![Page 26: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/26.jpg)
SERVICESCHILLERA chiller is a machine that removes heat from a liquid via a vapor compression or absorption refrigeration cycle. This liquid can then be circulated through a heat exchanger to cool air or equipment as required.
AC PLANT
![Page 27: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/27.jpg)
FIRE PUMP HOUSEFire pump is a part of a fire system which stores water in case of emergency and pumps it through fire fighting units.
AC DUCT CENTRAL HEATING SYSTEMA central heating system provides warmth to the whole interior of a building (or portion of a building) from one point to multiple rooms. When combined with other systems in order to control the building climate, the whole system may be an HVAC
![Page 28: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/28.jpg)
SUBSTATION
GENERATORElectric generator, a device that converts mechanical energy to electrical energy
![Page 29: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/29.jpg)
FIRE EXTINGUISHERA fire extinguisher, or extinguisher, is an active fire protection device used to extinguish or control small fires
FIRE HOSE CABINATSA fire hose is a high-pressure hose that carries water or other fire retardant (such as foam) to a fire to extinguish it. Outdoors, it attaches either to a fire engine or a fire hydrant. Indoors, it can permanently attach to a building's standpipe or plumbing system.
FIRE SPRINKLERA fire sprinkler or sprinkler head is the component of a fire sprinkler system that discharges water when the effects of a fire have been detected, such as when a predetermined temperature has been exceeded.
SMOKE DETECTORA smoke detector is a device that senses smoke, typically as an indicator of fire.
![Page 30: Tagore Theater case study](https://reader036.vdocuments.net/reader036/viewer/2022082213/5886a5921a28ab0c1d8b7075/html5/thumbnails/30.jpg)
VENTILATORS