Download - Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009
Technical Working Group on Nuclear Power Plant Instrumentation and Control
Vienna, May 2009
NATIONAL REPORT ON NUCLEAR POWER PLANT
INSTRUMENTATION AND CONTROL STATUS IN CZECH REPUBLIC
AND RECOMMENDATIONS TO IAEA
JIRI PLISKA
I&С ENERGO
2www.ic-energo.eu
CONTENT
Major projects at the NPP Dukovany and NPP Temelin
I&С system refurbishment project at the NPP Dukovany
Other I&С projects at the NPP Dukovany Recommendation to IAEA
3www.ic-energo.eu
Main projects
NPP Dukovany – two important and closely interlinked long-term projects of large scale:
16 TERA safely; to achieve yearly production of 16 TWh by 2013
Long Time Operation (LTO); to operate NPP beyond the designed service life term = 2015 it means to 2025 or 2035 or 2045
NPP Temelin 15 TERA safely; to achieve yearly production of 15
TWh by 2012
All of those projects incorporate a number of partial projects and
They are a part of a general business plan of the ČEZ – Reduction
of emissions and increase in efficiency
4www.ic-energo.eu
16 TERA Safely
The main goal of the project is an increase in efficiency and power output – to achieve yearly production of 16 TWh by 2013 and to maintain it for at least 20 years by utilization:
reserves of NPP Dukovany original project,
experience of personnel with the management of outage
on condition that the nuclear power plant retains its place among
the best rated nuclear plants in the world, especially in the field of
safety and operation indicators.
Project involves a number of partial projects aimed at increasing the
output and production by means of equipment modernization, reduction
of outage time and improvements in Load Factor (LF)
These partial projects are incorporated under a single umbrella project.
5www.ic-energo.eu
16 TERA Safely (continue)
The project partial goals involve:
an increase in output of the individual blocks to 500 MWe,
a reduction of outages by 35 days a year on average
The modifications to equipment include mainly: a replacement of the LP parts of the turbines a replacement of the HP parts of the turbines a modernization of the block transformers and the
transformer monitoring system a modification of the generator stators changes of algorithms I&C M1, M2 an upgrade of the core surveillance system Scorpio
6www.ic-energo.eu
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
ARCHITECTURE OVERVIEW
I&C project involves those unit control systems : •RSBP – Primary circuit systems and equipment part (M3)•RSBT – Turbine part (M4)•RSBS – Secondary circuit systems and equipment part (M5)•IS DIAG – diagnostic and information system for M345•MCR / ECR – corresponding modifications to the main control rooms and emergency control rooms
7www.ic-energo.eu
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
ARCHITECTURE OVERVIEW
Platforms, Safety category A, B, C (, N): HW for Technological level (A) – Automating system ZAT–RA,HW for Technological level (B) – Automating system ZAT–PRIMIS,HW for Technological level (C) – Automating system ZAT–DV,HW for Process level (C) – Automating system ZAT–FS with computer stations and servers of industrial design,HW for Operator (HSI) level (C) – Automating system ZAT–FS with computer stations of industrial design,SW for Technological level (B) – Operating system OS–9000 and applications for creating, managing and maintaining of projects PERTINAX IDE,SW for Process level (C) – Operating system MSW/XP and a high-performance industrial computer server (VS) with computing modules,SW for Operator (HMI) level (C) – Operating system MSW/XP and MS SQL server, Wonderware InTouch and Wonderware Industrial SQL server.
8www.ic-energo.eu
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
ARCHITECTURE OVERVIEW
Concept:Concept maintains the existing concept of division into three mutually independent systems (divisions), non-system, MCR, ECR
9www.ic-energo.eu
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
ARCHITECTURE OVERVIEW
Disposition, Function:Disposition of new systems remain the same in comparison to current one
Scope of functions is maintained with an exception:- new turbine regulation (shift of the limit between the electric and hydraulic part of the turbine regulation)- self-diagnostics - periodic testing
10www.ic-energo.eu
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
ARCHITECTURE OVERVIEW
Communication:•deterministic, independent on technology state communication
•redundant optical ring for safety category B•redundant optical ring for safety category C•SDL from system of higher safety category to the system of lower category
11www.ic-energo.eu
M345 Refurbishment (continue)
Schedule: •2009 •2010 •2011 •2012 •2013 •2014 •2015 •Number
of shutdowns
•Unit •B1
3+2
•Unit •B2
3+1
•Unit •B3
3+2
•Unit •B4
3+2
- short outage - long outage
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
1st OUTAGE
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
2nd OUTAGE
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
3rd OUTAGE
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
4th OUTAGE
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
5th OUTAGE
Nonoperative partof MCR
Main Control Room / Emergency Control Room
RSBTnew cabinet(Room 341)
RSB B/Nnew cabinet
(Balance-of-plantsystem)
RSB B/Nnew cabinet
(Primary system)
RSB B/Nnew cabinet
(Alert and inform indication)
HMI RSBTMOV Conventional HMIWorkstation
DIAG Alert indication / Alarm Inform indication Signalization
PCSworkstation
DIAG
DIAGnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBTmodifiedcabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
RSBSnew
cabinet
RSBPnew
cabinet
AcS
Turbine hydraulicsS SS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
AcS
SS
S
PPR1 PPR2 PPR3 PPRN
FINAL
19www.ic-energo.eu
Others I&С projects at NPP Dukovany
Cabling management system
Transformer monitoring system
On-line monitoring system
SCORPIO system modernization
20www.ic-energo.eu
Recommendation to IAEA
Cabling management system Topic
Common language for unified description of complex cabling systems.
Motivation
Cabling system belongs to the critical subsystems of NPPs. It covers both electric systems and I&C systems.
Goal
To create a common language for unified description of complex cabling systems using the ISO 15926 approach and principles.
(Generic Data Model and Reference Data Library)
21www.ic-energo.eu
Recommendation to IAEA (continue)
Measurement reliability and accuracy Topic
Measurement reliability and accuracy enhancement
Motivation
Measurement reliability and accuracy is a permanent and serious requirement of I&C system functions to ensure safety, reliability and economic goals of NPP operators
Goal
To elaborate an analysis of available methods based on advanced data processing and process simulation and designed to improve measurement reliability and accuracy.
On the basis on this analysis to give recommendation and guideline for using these methods to operators, regulators and vendors
Thanks for attention
Jiri PLISKA
telefon: +420 602 723 934e-mail: [email protected]
www.ic-energo.eu