News:CLIC workshop very successful.
• Next years workshop end February/early March,
partly combining with general LC discussion (ahead
of open ESU meeting in May 2019)
CLEAR and X-boxes doing well – see reports
• CLEAR review late this year, early next year
A 3.5 GeV CLIC type linac (klystron driven) being
discussed in framework of the Physics Beyond Colliders
– see report later
Work in implementation groups (CEIS, Cost & Power,
Main Linac Hardware, Parameters, Novel Acc.) moving
ahead well – you will see some flavours of it today
PiP writing – we will see today where we are
Physics and Detector work progressing well, external
review this week
(https://indico.cern.ch/event/707225/overview)
MTP budgeting 2018-19 not changed, first discussion
of 2020+, see following slides
2
18 April 2018
Key goals (c/p/indu/risk)
3
Modules (drive-beam,
klystron type)
Final modules, from revised
designs to industrial modules
Optimized structure
and RF components
Finalize industrial structures:
increase manufacturability,
brazed, halves, conditioning.
Use/maintain/operate existing
test-stands for testing
Klystrons and
Modulators
Efficiency and costs
improvements, significant
gains possible for efficiency,
industrial cost-models and
optimization
Magnets
Permanent magnets, longit.
variable magnets, industrial
production and cost-
optimisation
Civil engineering,
infrastructure
Detailed site layout and
CE/infrastructure designs
49 km
29 km
11km
Budget planning
System tests
4
• Light sources, FACET/FELs for emittance conservation, Final Focus studies (ATF2), Drive-beam Front End facility at CERN
• Two examples:
SOLEIL
MAXIII
PETRAIII
AustralianLS
ESRF
DIAMOND
ASTRID
SLS
SPRING8
ELETTRA
ATF
BESSYII
ALS
ALBA
APSANKA
SPEARIII
PEPII
LEP
CESRTA
NLC
ILC
MAXIV
NSLSII
CLICDR
PEPX
PETRAIII(3GeV)
ESRFII
SIRIUS
SPring-8II
APSII
τUSR DIAMONDII
ALS-U
BAPS-U
SOLEILII
SLSII
FCC-ee(H)FCC-ee(Z)
0.1
1.0
10.0
100.0
1000.0
10000.0
0.001 0.01 0.1 1 10 100
Vetr
calemian
ce[pm]
Horizontalemi ance[nm]
Gun SHB
1-2-3PB Buncher Acc. Structures
500 MHzModulator-klystrons, 1 GHz, 15 MW
~ 140 keV ~ 12 MeV
Diagnostics
18 April 2018 Budget planning
Cost and Power
5
CERNenergyconsumption2012:1.35TWh
18 April 2018 Budget planning
A cost of ~6 BCHF and power ~200 MW are “reasonable” values
Focus TDR work on modules, RF and CE for costs; for power RF and magnets
Above: EU Design Study for X-Band FELs
2018-2020: http://compact-light.web.cern.ch
Beyond being a collaboration for CLIC, many
groups have their own X-band facilities and
components (see overview on the left)
X-band technology
CERN XBox-1teststand 50MW Operational,connectiontoCLEARplanned
Xbox-2teststand 50MW Operational
XBox-3 teststand 4x6MW Operational
Trieste LinearizerforFermi 50MW Operational
PSI LinearizerforSwissFEL 50MW Operational
DeflectorforSwissFEL 50MW Designandprocurement
DESY DeflectorforFLASHforward 6MW Designandprocurement
DeflectorforFLASH2 6MW Designandprocurement
DeflectorforSinbad tbd Planning
Tsinghua DeflectorforComptonsource 50MW Commissioning
LinearizerforComptonsource 6MW Planning
SINAP LinearizerforsoftX-rayFEL 6MW Operational
DeflectorsforsoftX-rayFEL 3x50MW Procurement
Australia Teststand 2x6MW Proposalsubmission
Eindhoven CompactComptonsource,100MeV 6MW Designandprocurement
Valencia S-band teststand 2x10MW Installationandcommissioning
KEK NEXTEFteststand 2x50MW Operational
SLAC Designofhigh-efficiencyX-bandklystron 60MW Inprogress
Daresbury Linearizer 6MW Designandprocurement
Deflector tbd Planning
Accelerator tbd Planning
Frascati XFEL,plasma accelerator,1GeV 4(8)x50MW CDR
Teststand 50MW Designandprocurement
Groningen 1.4GEVXFELAccelerator,1.4GeV tbd NLroadmap,CDR
18 April 2018 Budget planning 6
In the CLIC preparation phase:
Take advantage of the widespread use of electron linacs, and rapidly increasing use
of X-band increase collaboration
An e-beam facility at CERN
ILC prep. phase project:
CERN coordination of European effort
R&D contracts
MoU annexes or similar (with MS and NMS collaborators)
Techn.Transfer agreements, EU projects.
Preparation Phase 2019-22: Organization and resources
A European ILC project in the preparation phase 2019-22: • Resources needed estimated to ~25 MCHF/year (material) and 60 FTE/year (personnel),
ramping up from 2019 • Move towards more engineering personnel • The organisational model above is used for existing studies at CERN, e.g. CLIC/HE-LHC/FCC
Choices and common activities
18 April 2018 Budget planning 9
CLIC prep.phase / year
• 21 MCHF (w/collaboration)
• 130 FTE (w/collaboration)
ILC prep.phase /year
• 25 MCHF (Euro-collaboration)
• 60 FTE (Euro-collaboration)
3.5 GeV machine
• 6.5 MCHF (CERN)
• 55 FTE (w/collaboration)
For the time being• Look at common areas in all scenarios – consider key topics or facilities 2019-2023
• Cover all existing existing agreements with (INFN, UK, etc) that go into 2020, it also covers CompactLight obligations, ARIES transnational access, LCC:
• By 2019-2020 we need to know where to go next to select between the circles on previous slide to for more solid and concrete planning
• No changes needed for 2018-19
• *in case of ILC ramp down after 2021 (move Xbox facilities partly outside) – other ILC activ. will come in
Material/year
(kCHF)
Personnel/year Total/year
(kCHF)
LC design team 500 5 1700
System tests ATF, DR, etc 300 (above or below) 300
CLEAR 700 5 1900
High Eff Klystrons/modulator and test-
areas
900 3 1600
LCC and admin/finance support 400 2.5 900
Xbox operation and test-structures* 2500 3 3200
Gun (AWAKE, CLEAR, Compact Light) 200 1.5 600
Total 5500 20 10200
18 April 2018 Budget planning 10